Masterformat - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Masterformat? On this page you'll find 180 study documents about Masterformat.

Page 3 out of 180 results

Sort by

COSC 275 Exam 2 Midterm Exam Questions With All Correct Answers.
  • COSC 275 Exam 2 Midterm Exam Questions With All Correct Answers.

  • Exam (elaborations) • 6 pages • 2024
  • Measures - Answer 1" = 25.40 milimeters 1 sq. M(m^2) = 10.764 sq. ft or = 1.196 sq. yd. 1 kg = 2.2046 lbs Geometric Formula: Circle - Answer Circumference =2r*pi Area = pi*r^2 Geometric Formula: Triangle - Answer Area: B*1/2H Masterformat 2004: 00 - Answer Procurement and Contracting Requirements Masterformat 2004: 01 - Answer General Requirements Masterformat 2004: 02 - Answer Existing Conditions Masterformat 2004: 03 - Answer Concrete Masterf...
    (0)
  • $9.99
  • + learn more
IDPX Practice Test questions with correct answers
  • IDPX Practice Test questions with correct answers

  • Exam (elaborations) • 36 pages • 2023
  • Available in package deal
  • This system is divided into the following three parts: General/Products/Execution? a. CSI MasterFormat b. Guide Specifications c. Master Specifications d. CPM System Answer a. CSI MasterFormat The organization of the technical sections has been standardized through the general adoption of the MasterFormat system developed by the construction specifications institute to standardize the numbering and format of project related information for use in specifying, cost estimating and data filin...
    (0)
  • $15.99
  • + learn more
CDT Exam Practice Questions With 100% Correct Answers
  • CDT Exam Practice Questions With 100% Correct Answers

  • Exam (elaborations) • 21 pages • 2024
  • Available in package deal
  • CDT Exam Practice Questions With 100% Correct Answers What are the four project teams? a. Owner, Facilities, Architect, CM/A b. Contractor, Supplier, AHJ, A/E c. Owner, Design, Contractor, Supplier d. A/E, Subs, AHJ, Facilities Manager - answerc. Owner, Design, Contractor, Supplier What are the Stages of the Facility Life Cycle? a. Project Conception, Design, Procurement, Construction b. Project Conception, Design, Construction Documents, Procurement, Construction, Facility Management ...
    (0)
  • $13.49
  • + learn more
CON 151: Final Exam Questions With Guaranteed Pass Solutions.
  • CON 151: Final Exam Questions With Guaranteed Pass Solutions.

  • Exam (elaborations) • 22 pages • 2024
  • Which 2004 MasterFormat division would you find specifications for elevators? - Answer Division 14 Ultimately, whose responsibility is it to submit a Request for Information (RFI)? - Answer Contractor Which of the following is NOT in the project manual? - Answer Material quantities A standard specification for the installation of reinforced concrete floors would be what type of industry standard? - Answer Workmanship A standard specification for compression strength testi...
    (0)
  • $10.09
  • + learn more
Construction Documents Exam Set  Test Questions And Revised  Correct Answers | Already Passed
  • Construction Documents Exam Set Test Questions And Revised Correct Answers | Already Passed

  • Exam (elaborations) • 19 pages • 2024
  • Available in package deal
  • Construction Documents Exam Set Test Questions And Revised Correct Answers | Already Passed What is a construction estimate? - ANSWER : A construction estimate is a summary of probable quantities and costs of materials, labor, equipment, and subcontracts to complete a project, including taxes, overhead, and profit, based on the best available information at the time. Name the four primary categories of costs in the construction estimate. - ANSWER : The four primary categories of ...
    (0)
  • $10.99
  • + learn more
CET 120 Questions and Answers 100% Solved
  • CET 120 Questions and Answers 100% Solved

  • Exam (elaborations) • 16 pages • 2024
  • The Construction Manager is hired by this entity? The Gen. Contractor In a DBB project method, the gen. Construction contract is between: the contractor and the owner When there is a dispute between the specs and the drawings, what is the proper way to settle the dispute The A/E should intrepret CSI Masterformat Div 1 sections apply broadly to the execution of the work of all the other sections of the specs True A subcontractor is obligated to the prime contractor in the same manner as...
    (0)
  • $10.49
  • + learn more
COSC 275 Exam 2 Palmer Questions And Answers 100% Verified.
  • COSC 275 Exam 2 Palmer Questions And Answers 100% Verified.

  • Exam (elaborations) • 4 pages • 2024
  • Available in package deal
  • COSC 275 Exam 2 Palmer Questions And Answers 100% Verified. Measures - answer1" = 25.40 milimeters 1 sq. M(m^2) = 10.764 sq. ft or = 1.196 sq. yd. 1 kg = 2.2046 lbs Geometric Formula: Circle - answerCircumference =2r*pi Area = pi*r^2 Geometric Formula: Triangle - answerArea: B*1/2H Masterformat 2004: 00 - answerProcurement and Contracting Requirements Masterformat 2004: 01 - answerGeneral Requirements Masterformat 2004: 02 - answerExisting Conditions Masterformat 2004: 03 - ans...
    (0)
  • $10.49
  • + learn more
CDT Exam Questions With Correct Answers 100% Solved
  • CDT Exam Questions With Correct Answers 100% Solved

  • Exam (elaborations) • 21 pages • 2024
  • Available in package deal
  • CDT Exam Questions With Correct Answers 100% Solved 1. The method of computation of Contractor's overhead and profits for Change Order prices, where both additions and deletions are involved, is found in the: a) Agreement. b) Conditions of the Contract. c) Division 01. d) Instructions to Bidders. - answerb) Conditions of the Contract. 2. General Requirements are part of: a) Supplementary Conditions. b) Bidding Requirements. c) Specifications. d) Summary of Work. - answerc) Specifica...
    (0)
  • $13.49
  • + learn more
CDT Exam Questions With 100% Correct Answers
  • CDT Exam Questions With 100% Correct Answers

  • Exam (elaborations) • 12 pages • 2024
  • Available in package deal
  • CDT Exam Questions With 100% Correct Answers payment bonds - answerThey are usually issued by contractors. The payment bond is referred to as the labor and material payment bond. They are used to guarantee that subcontractors and material suppliers will pay. The payments bounds. Contract bond is known as contract bond, and they are issued by an insurance company or bank to guarantee completion of the project by the contractor. Who acquires and pays for the building permit? - answerThe con...
    (0)
  • $12.49
  • + learn more
IDPX Practice Test exam 2023 with 100% correct answers
  • IDPX Practice Test exam 2023 with 100% correct answers

  • Exam (elaborations) • 31 pages • 2023
  • The 3-part technical sections in the CSI MasterFormat specs refer to: - correct answer general, products, execution What is the typical term used to describe the furniture sales agreement between the client and interior designer? - correct answer proposal Which veneer cut would result in the least veneer waste, but be the least desirable to use for the table? - correct answer rotary slicing When estimating how much fabric will be required for custom designed draperies, which needs...
    (0)
  • $17.49
  • + learn more