Package deal
Interior Design Professional Exam (IDPX) Tests Bundle Set
Interior Design Professional Exam (IDPX) Tests Bundle Set
[Show more]Interior Design Professional Exam (IDPX) Tests Bundle Set
[Show more]While touring the site, you noticed the transition from carpet to concrete isn't what you approved in the shop drawings and has resulted in a significant height difference that will be a tripping hazard? Answer Contact the GC in writing stating you observed and that you are rejecting that portion o...
Preview 3 out of 22 pages
Add to cartWhile touring the site, you noticed the transition from carpet to concrete isn't what you approved in the shop drawings and has resulted in a significant height difference that will be a tripping hazard? Answer Contact the GC in writing stating you observed and that you are rejecting that portion o...
The 3-part technical sections in the CSI MasterFormat specs refer to: Answer general, products, execution 
 
What is the typical term used to describe the furniture sales agreement between the client and interior designer? Answer proposal 
 
Which veneer cut would result in the least veneer waste, b...
Preview 4 out of 39 pages
Add to cartThe 3-part technical sections in the CSI MasterFormat specs refer to: Answer general, products, execution 
 
What is the typical term used to describe the furniture sales agreement between the client and interior designer? Answer proposal 
 
Which veneer cut would result in the least veneer waste, b...
What is building commissioning? Answer The process of inspecting, testing, starting up, and adjusting building systems and then verifying that the systems are operating as intended and that they meet the design criteria. 
 
How does an independent furniture rep differ from a manufacturer's rep? Ans...
Preview 4 out of 36 pages
Add to cartWhat is building commissioning? Answer The process of inspecting, testing, starting up, and adjusting building systems and then verifying that the systems are operating as intended and that they meet the design criteria. 
 
How does an independent furniture rep differ from a manufacturer's rep? Ans...
When does the designer transfer all warranties and manuals? Answer when the designer is the seller of the goods 
 
when goods are shipped FOB destination, who has the title to them while in transit? Answer the seller 
 
when goods are shipped FOB factory, who has the title to them while in transit? ...
Preview 4 out of 41 pages
Add to cartWhen does the designer transfer all warranties and manuals? Answer when the designer is the seller of the goods 
 
when goods are shipped FOB destination, who has the title to them while in transit? Answer the seller 
 
when goods are shipped FOB factory, who has the title to them while in transit? ...
This system is divided into the following three parts: General/Products/Execution? 
a. CSI MasterFormat 
b. Guide Specifications 
c. Master Specifications 
d. CPM System Answer a. CSI MasterFormat 
 
The organization of the technical sections has been standardized through the general adoption of the...
Preview 4 out of 36 pages
Add to cartThis system is divided into the following three parts: General/Products/Execution? 
a. CSI MasterFormat 
b. Guide Specifications 
c. Master Specifications 
d. CPM System Answer a. CSI MasterFormat 
 
The organization of the technical sections has been standardized through the general adoption of the...
Why does the HVAC system need to be balanced at the end of a commercial project? Answer To adjust airflow at each device location to meet the criteria in the engineers design 
 
The typical chronological order of system installation in new commercial construction is Answer Plumbing, HVAC, Electrical...
Preview 2 out of 7 pages
Add to cartWhy does the HVAC system need to be balanced at the end of a commercial project? Answer To adjust airflow at each device location to meet the criteria in the engineers design 
 
The typical chronological order of system installation in new commercial construction is Answer Plumbing, HVAC, Electrical...
Why does the HVAC system need to be balanced at the end of a commercial project? 
 
 A. 
To verify that air quality levels are within the design specifications 
 B. 
To detect significant air leaks in ductwork 
 C. 
To adjust air flow at each device location to meet the criteria in the engineer...
Preview 4 out of 32 pages
Add to cartWhy does the HVAC system need to be balanced at the end of a commercial project? 
 
 A. 
To verify that air quality levels are within the design specifications 
 B. 
To detect significant air leaks in ductwork 
 C. 
To adjust air flow at each device location to meet the criteria in the engineer...
Why is it important to include the building's "construction type" in your existing conditions analysis? Answer To confirm if proposed occupancy changes do not exceed the maximum allowable area. 
 
Circulation Multiplier Answer Building Efficiency - differences in predominating room sizes, occupan...
Preview 2 out of 7 pages
Add to cartWhy is it important to include the building's "construction type" in your existing conditions analysis? Answer To confirm if proposed occupancy changes do not exceed the maximum allowable area. 
 
Circulation Multiplier Answer Building Efficiency - differences in predominating room sizes, occupan...
If, during construction, an interior designer repeatedly tells a contractor how to install certain finishes, this could give rise to..? 
A. liability exposure 
B. A claim of negligence 
C. a third-party claim 
D. a breach of duty Answer C. a third-party claim 
 
Advising the contractor on the exact ...
Preview 2 out of 8 pages
Add to cartIf, during construction, an interior designer repeatedly tells a contractor how to install certain finishes, this could give rise to..? 
A. liability exposure 
B. A claim of negligence 
C. a third-party claim 
D. a breach of duty Answer C. a third-party claim 
 
Advising the contractor on the exact ...
When working as the client's agent and a change order for additional electrical receptacles is issued, who is responsible for approval? 
-The designer and the contractor 
-The designer and the owner 
-The electrical consultant and the contractor 
-The owner and the subcontractor Answer -The designe...
Preview 3 out of 18 pages
Add to cartWhen working as the client's agent and a change order for additional electrical receptacles is issued, who is responsible for approval? 
-The designer and the contractor 
-The designer and the owner 
-The electrical consultant and the contractor 
-The owner and the subcontractor Answer -The designe...
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Stuvia is a marketplace, so you are not buying this document from us, but from seller cracker. Stuvia facilitates payment to the seller.
No, you only buy these notes for $33.99. You're not tied to anything after your purchase.
4.6 stars on Google & Trustpilot (+1000 reviews)
67096 documents were sold in the last 30 days
Founded in 2010, the go-to place to buy study notes for 14 years now