Project delive Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Project delive? On this page you'll find 76 study documents about Project delive.
All 76 results
Sort by
-
DBIA EXAM #3/ DBIA EXAM 1/ DBIA - Project Delivery / DBIA Principles of Design-Build and Post Award, 5 Docs in 1 Pack.
- Package deal • 5 items • 2023
-
- $20.29
- 1x sold
- + learn more
1
Exam (elaborations)
DBIA EXAM #3 Study Guide Questions (175 Terms) with Guaranteed Success, A+ Score Solution 2023-2024.

2
Exam (elaborations)
DBIA Principles of Design-Build and Post Award & Contracts Study Guide Exam Questions (330 Terms) with Definite Solutions 2023-2024.

3
Exam (elaborations)
DBIA - Project Delivery Exam Questions with Deta
-
DBIA - Project Delivery Exam Questions with Solutions.
- Exam (elaborations) • 11 pages • 2023
- Available in package deal
-
- $7.79
- 1x sold
- + learn more
DBIA - Project Delivery Exam Questions with Solutions.
-
Project Delivery Questions and Answers Already Passed
- Exam (elaborations) • 28 pages • 2024
-
- $9.99
- + learn more
Project Delivery Questions and Answers 
 
Already Passed 
 
What is the primary goal of a project delivery method? 
 To effectively manage and complete a project within the agreed scope, time, and budget. 
 
What is a common project delivery method in construction? 
 Design-Bid-Build. 
 
How does the Design-Bid-Build method work? 
 The project is designed first, then bids are solicited, and construction follows after selecting 
a contractor. 
 
What is a key advantage of the Design-Build method?...
-
DBIA: Principles of Design-Build and Post Award & Contracts, Project Delivery Questions and Answers 2024
- Exam (elaborations) • 11 pages • 2024
-
- $9.99
- + learn more
DBIA: Principles of Design-Build and Post Award & Contracts, Project Delivery Questions and Answers 2024 
Clinger Cohen Act/Defense Procurement Reform Act 1996 - Correct Answer-Allows all federal agencies to utilize Design-Build. Prior to that no enabling legislation existed allowing Design-Build. What Year?
-
APM PMQ - Project Delivery Exam with Correct Answers
- Exam (elaborations) • 11 pages • 2023
- Available in package deal
-
- $10.49
- + learn more
APM PMQ - Project Delivery Exam with Correct Answers 
what is estimating - ️️ uses different methods to produce a prediction of the time and 
resources required to complete the scope of the work to the defined quality 
requirements. 
when do estimates become more accurate - ️️ Throughout the project, it is required for 
the PM to produce estimates. Estimates are often described as approximations as can 
never be 100% accurate. The accuracy of the estimate highly depends on the amount 
of...
As you read this, a fellow student has made another $4.70
-
DBIA - Project Delivery Questions And Answers Graded A+
- Exam (elaborations) • 6 pages • 2024
- Available in package deal
-
- $7.99
- + learn more
The contract approach/payment methodology that is based on specific rates given for completed 
construction items. - Unit Price 
The contract approach/payment methodology that gives the contractor little incentive to be efficient as 
there is no guaranteed price. - Cost Plus Fee 
What are 3 fundamental decisions an Owner must make when initiating a feasible project? - 
Delivery system, Type of Procurement and Type of Contract Format. 
What is the most common project delivery system? - Design Bid...
-
DBIA: Principles of Design-Build and Post Award & Contracts, Project Delivery | 141 Questions and Answers(A+ Solution guide)
- Exam (elaborations) • 14 pages • 2023
- Available in package deal
-
- $8.39
- + learn more
Clinger Cohen Act/Defense Procurement Reform Act 1996 - Allows all federal agencies to utilize 
Design-Build. Prior to that no enabling legislation existed allowing Design-Build. What Year? 
Standard of Care - The level of quality that any average Design Professional would be able to 
perform given the circumstances. 
Design Build - Fastest Project Delivery method, fast tracking possible overlapping design with 
construction utilizing incremental packages. 
Negotiated (Qualifications Based) - Pr...
-
DBIA - Project Delivery Exam Solved 100% Correct!!
- Exam (elaborations) • 6 pages • 2023
- Available in package deal
-
- $7.99
- + learn more
Miller Act - The existing federal law that required federal projects exceeding 100k to require both 
a performance and a payment bond. Created a legal separation between construction & Design 
Delivery system, Type of Procurement and Type of Contract Format. - What are 3 fundamental 
decisions an Owner must make when initiating a feasible project? 
Design Bid Build (Low Bid) - What is the most common project delivery system? 
The Owner - In traditional DBB delivery, who does the architect sign t...
-
DBIA - PROJECT DELIVERY EXAM QUESTIONS WITH SOLUTIONS-2024 ACTUAL EXAM QUESTION AND CORRECT ANSWERS VERIFIED ANSWERS ALREADY GRADED A+.p
- Exam (elaborations) • 10 pages • 2024
- Available in package deal
-
- $15.99
- + learn more
DBIA - PROJECT DELIVERY EXAM QUESTIONS WITH SOLUTIONS-2024 ACTUAL EXAM QUESTION AND CORRECT ANSWERS VERIFIED ANSWERS ALREADY GRADED A+.p
-
Project Delivery Systems - Exam 2 Questions With Explanations Of Answers/2024.
- Exam (elaborations) • 11 pages • 2024
-
Available in package deal
-
- $12.99
- + learn more
Design-Build - correct answer a method of project delivery in which one entity (design-builder) forges a single contract with the owner to provide for architectural engineering design services and construction services. 
 
Essential Concepts of Design-Build - correct answer Contractor & A/E have a direct contractual relationship 
Single point of responsibility 
contract controls 
Design Process 
Design-...
How did he do that? By selling his study resources on Stuvia. Try it yourself! Discover all about earning on Stuvia