DBIA - Project Delivery Questions And Answers Graded A+
6 views 0 purchase
Course
DBIA - Project Delivery
Institution
DBIA - Project Delivery
The contract approach/payment methodology that is based on specific rates given for completed
construction items. - Unit Price
The contract approach/payment methodology that gives the contractor little incentive to be efficient as
there is no guaranteed price. - Cost Plus Fee
What are 3 fundame...
DBIA - Project Delivery
The contract approach/payment methodology that is based on specific rates given for completed
construction items. - Unit Price
The contract approach/payment methodology that gives the contractor little incentive to be efficient as
there is no guaranteed price. - Cost Plus Fee
What are 3 fundamental decisions an Owner must make when initiating a feasible project? -
Delivery system, Type of Procurement and Type of Contract Format.
What is the most common project delivery system? - Design Bid Build (Low Bid)
Designers are required to uphold a standard of care for design and Contractors are required to warrant
the construction work. A DB entity must do both. - Standard of Care and Warranties
In traditional DBB delivery, who does the architect sign their contract with? - The Owner
Why would you choose a Design Build delivery System? - Scheduling Restraints or needs to be
fast-tracked
If the owner wants to shift risk to one party, what project delivery method would they choose? -
Design Build
What type of project delivery best suits a complex project requiring close coordination of design and
construction expertise? - Design Build
What are some forms of Design Build entities? - 1 - Joint Venture
2 - Integrated DB Firm
3- A/E Led
, 4 - Contractor Led
Does the Owner bear risk in a design-bid-build? - Yes
What are some reasons owners choose DBB? - 1 - Linear project delivery
2 - Well defined and familiar relationships
3 - Benefit of Open Market Competition
4 - Owner is actively involved in design until documents are 100% complete
1 - Owner wants absolute design control
2 - The programming limits flexibility and innovation
3 - The Owner cannot provide programming and performance requirements. - Limiting Factors to
Design Build
The most common DB entity structural arrangement? - Contractor Led
What contracts does the owner holds in a CM @ Risk delivery method. - 1 - Contractor
2 - Architect
How architect/engineering firms are typically selected? - Qualifications and Best Price
A procurement option where the DB'er is selected strictly on the basis of predetermined values and
qualification criteria already determined in consideration of reputation of prior dealings with the owner?
Often highly specialized. - Sole Source/Direct Selection
The existing federal law that required federal projects exceeding 100k to require both a performance and
a payment bond. Created a legal separation between construction & Design - Miller Act
The procurement option generally used for a CM @ Risk project delivery system: - Qualifications
Based Selection
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller ACADEMICMATERIALS. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $7.99. You're not tied to anything after your purchase.