CSI CDT EXAM WITH 100% CORRECT ANSWER.
  • CSI CDT EXAM WITH 100% CORRECT ANSWER.

  • Exam (elaborations) • 12 pages • 2023
  • Available in package deal
  • CSI CDT EXAM WITH 100% CORRECT ANSWER. Stages of Facility Life Cycle - CORRECT ANSWER-1. Project Conception 2. Design 3. Construction Documents, 4. Procurement 5. Construction 6. Facility Management Quality Assuance - CORRECT ANSWER-Procedures for guarding against defects and during execution of work (by A/E) *PRECONSTRUCTION* Quality Control - CORRECT ANSWER-Procedures for evaluating completed activities and elements of the design for conformance with requirements (by Contractor) Stages of ...
    (0)
  • $15.99
  • 2x sold
  • + learn more
CET 120 Questions and Answers 100% Solved
  • CET 120 Questions and Answers 100% Solved

  • Exam (elaborations) • 16 pages • 2024
  • The Construction Manager is hired by this entity? The Gen. Contractor In a DBB project method, the gen. Construction contract is between: the contractor and the owner When there is a dispute between the specs and the drawings, what is the proper way to settle the dispute The A/E should intrepret CSI Masterformat Div 1 sections apply broadly to the execution of the work of all the other sections of the specs True A subcontractor is obligated to the prime contractor in the same manner as...
    (0)
  • $10.49
  • + learn more
Construction Documents Exam Set  Test Questions And Revised  Correct Answers | Already Passed
  • Construction Documents Exam Set Test Questions And Revised Correct Answers | Already Passed

  • Exam (elaborations) • 19 pages • 2024
  • Available in package deal
  • Construction Documents Exam Set Test Questions And Revised Correct Answers | Already Passed What is a construction estimate? - ANSWER : A construction estimate is a summary of probable quantities and costs of materials, labor, equipment, and subcontracts to complete a project, including taxes, overhead, and profit, based on the best available information at the time. Name the four primary categories of costs in the construction estimate. - ANSWER : The four primary categories of ...
    (0)
  • $10.99
  • + learn more
CET 120 Questions and Answers 100%  Solved
  • CET 120 Questions and Answers 100% Solved

  • Exam (elaborations) • 16 pages • 2024
  • Available in package deal
  • CET 120 Questions and Answers 100% Solved The Construction Manager is hired by this entity? The Gen. Contractor In a DBB project method, the gen. Construction contract is between: the contractor and the owner When there is a dispute between the specs and the drawings, what is the proper way to settle the dispute The A/E should intrepret CSI Masterformat Div 1 sections apply broadly to the execution of the work of all the other sections of the specs True A subcontractor is obligat...
    (0)
  • $9.99
  • + learn more
IDPX Practice Test exam 2023 with 100% correct answers
  • IDPX Practice Test exam 2023 with 100% correct answers

  • Exam (elaborations) • 31 pages • 2023
  • The 3-part technical sections in the CSI MasterFormat specs refer to: - correct answer general, products, execution What is the typical term used to describe the furniture sales agreement between the client and interior designer? - correct answer proposal Which veneer cut would result in the least veneer waste, but be the least desirable to use for the table? - correct answer rotary slicing When estimating how much fabric will be required for custom designed draperies, which needs...
    (0)
  • $17.49
  • + learn more
Construction Management Study Guide-Review Questions with correct answers
  • Construction Management Study Guide-Review Questions with correct answers

  • Exam (elaborations) • 18 pages • 2023
  • Available in package deal
  • What two major components make up the contract documents? Correct Answer-Plans --> drawings Specs --> project manual When did architects first use their drawings to communicate design intent? Correct Answer-They built models and drew sketches to help explain to the builders what they wanted done. What does CAD stand for? Correct Answer-Computer Aided Design Typical drawing order in set of plans? Correct Answer-Civil, Architectural, Structural, Mechanical, Electrical Whats the...
    (0)
  • $15.99
  • + learn more
CON 101- CSU EXAM 2 REVIEW QUESTIONS AND  ANSWERS, GRADED A+/
  • CON 101- CSU EXAM 2 REVIEW QUESTIONS AND ANSWERS, GRADED A+/

  • Exam (elaborations) • 9 pages • 2024
  • CON 101- CSU EXAM 2 REVIEW QUESTIONS AND ANSWERS, GRADED A+/ civil drawings - -all work associated with the site structural drawings - -all work associated with the structural framing mechanical drawings - -plumbing & HVAC electrical drawings - -Includes all rough wiring, transformers, and panel boxes, as well as receptacles, switches and lighting fixtures 4 sections of specs - -bidding documents, general conditions, supplemental conditions, technical specifications the project manua...
    (0)
  • $8.49
  • + learn more
IDPX Practice Tests questions with correct answers
  • IDPX Practice Tests questions with correct answers

  • Exam (elaborations) • 39 pages • 2023
  • Available in package deal
  • The 3-part technical sections in the CSI MasterFormat specs refer to: Answer general, products, execution What is the typical term used to describe the furniture sales agreement between the client and interior designer? Answer proposal Which veneer cut would result in the least veneer waste, but be the least desirable to use for the table? Answer rotary slicing When estimating how much fabric will be required for custom designed draperies, which needs to be considered hen determining to...
    (0)
  • $16.99
  • + learn more
Construction Management Study Guide-Review Questions with correct answers|100% verified|18 pages
  • Construction Management Study Guide-Review Questions with correct answers|100% verified|18 pages

  • Exam (elaborations) • 18 pages • 2024
  • Construction Management Study Guide-Review Questions with correct answers What two major components make up the contract documents? Correct Answer-Plans --> drawings Specs --> project manual When did architects first use their drawings to communicate design intent? Correct Answer-They built models and drew sketches to help explain to the builders what they wanted done. What does CAD stand for? Correct Answer-Computer Aided Design Typical drawing order in set of plans? Correct A...
    (0)
  • $12.99
  • + learn more
CSI CDT Exam Questions With Correct Answers 100% Solved
  • CSI CDT Exam Questions With Correct Answers 100% Solved

  • Exam (elaborations) • 15 pages • 2024
  • CSI CDT Exam Questions With Correct Answers 100% Solved Owner - answerPrinciple stakeholder - initiates project, assumes risk, provides funding AHJ - Authorities Having Jurisdiction - answerProtect public health, safety and welfare Design Team - answerAddress planning issues, determine design program, identify codes and regulations, produce procurement and construction documents, administer construction contract, *provide QA/QC procedures* Contractor Team - answerEntity that constructs a ...
    (0)
  • $12.49
  • + learn more