Masterformat specs - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Masterformat specs? On this page you'll find 30 study documents about Masterformat specs.
All 30 results
Sort by
-
CSI CDT EXAM WITH 100% CORRECT ANSWER.
- Exam (elaborations) • 12 pages • 2023
- Available in package deal
-
- $15.99
- 2x sold
- + learn more
CSI CDT EXAM WITH 100% CORRECT ANSWER. 
Stages of Facility Life Cycle - CORRECT ANSWER-1. Project Conception 2. Design 3. Construction Documents, 4. Procurement 5. Construction 6. Facility Management 
Quality Assuance - CORRECT ANSWER-Procedures for guarding against defects and during execution of work (by A/E) *PRECONSTRUCTION* 
Quality Control - CORRECT ANSWER-Procedures for evaluating completed activities and elements of the design for conformance with requirements (by Contractor) 
Stages of ...
-
CET 120 Questions and Answers 100% Solved
- Exam (elaborations) • 16 pages • 2024
-
- $10.49
- + learn more
The Construction Manager is hired by this entity? 
The Gen. Contractor 
In a DBB project method, the gen. Construction contract is between: 
the contractor and the owner 
When there is a dispute between the specs and the drawings, what is the proper way to settle the 
dispute 
The A/E should intrepret 
CSI Masterformat Div 1 sections apply broadly to the execution of the work of all the other 
sections of the specs 
True 
A subcontractor is obligated to the prime contractor in the same manner as...
-
Construction Documents Exam Set Test Questions And Revised Correct Answers | Already Passed
- Exam (elaborations) • 19 pages • 2024
- Available in package deal
-
- $10.99
- + learn more
Construction Documents Exam Set 
Test Questions And Revised 
Correct Answers | Already Passed 
What is a construction estimate? - ANSWER : A construction 
estimate is a summary of probable quantities and costs of 
materials, labor, equipment, and subcontracts to complete a 
project, including taxes, overhead, and profit, based on the best 
available information at the time. 
Name the four primary categories of costs in the construction 
estimate. - ANSWER : The four primary categories of ...
-
CET 120 Questions and Answers 100% Solved
- Exam (elaborations) • 16 pages • 2024
- Available in package deal
-
- $9.99
- + learn more
CET 120 Questions and Answers 100% 
 
Solved 
 
The Construction Manager is hired by this entity? 
The Gen. Contractor 
In a DBB project method, the gen. Construction contract is between: 
the contractor and the owner 
When there is a dispute between the specs and the drawings, what is the proper way to settle the 
dispute 
The A/E should intrepret 
CSI Masterformat Div 1 sections apply broadly to the execution of the work of all the other 
sections of the specs 
True 
A subcontractor is obligat...
-
IDPX Practice Test exam 2023 with 100% correct answers
- Exam (elaborations) • 31 pages • 2023
-
Available in package deal
-
- $17.49
- + learn more
The 3-part technical sections in the CSI MasterFormat specs refer to: - correct answer general, products, execution 
 
What is the typical term used to describe the furniture sales agreement between the client and interior designer? - correct answer proposal 
 
Which veneer cut would result in the least veneer waste, but be the least desirable to use for the table? - correct answer rotary slicing 
 
When estimating how much fabric will be required for custom designed draperies, which needs...
And that's how you make extra money
-
Construction Management Study Guide-Review Questions with correct answers
- Exam (elaborations) • 18 pages • 2023
- Available in package deal
-
- $15.99
- + learn more
What two major components make up the contract documents? Correct Answer-Plans --> drawings 
Specs --> project manual 
 
When did architects first use their drawings to communicate design intent? Correct Answer-They built models and drew sketches to help explain to the builders what they wanted done. 
 
What does CAD stand for? Correct Answer-Computer Aided Design 
 
Typical drawing order in set of plans? Correct Answer-Civil, Architectural, Structural, Mechanical, Electrical 
 
Whats the...
-
CON 101- CSU EXAM 2 REVIEW QUESTIONS AND ANSWERS, GRADED A+/
- Exam (elaborations) • 9 pages • 2024
-
Available in package deal
-
- $8.49
- + learn more
CON 101- CSU EXAM 2 REVIEW QUESTIONS AND 
ANSWERS, GRADED A+/ 
civil drawings - -all work associated with the site 
structural drawings - -all work associated with the structural framing 
mechanical drawings - -plumbing & HVAC 
electrical drawings - -Includes all rough wiring, transformers, and panel boxes, as well 
as receptacles, switches and lighting fixtures 
4 sections of specs - -bidding documents, general conditions, supplemental conditions, 
technical specifications 
the project manua...
-
IDPX Practice Tests questions with correct answers
- Exam (elaborations) • 39 pages • 2023
- Available in package deal
-
- $16.99
- + learn more
The 3-part technical sections in the CSI MasterFormat specs refer to: Answer general, products, execution 
 
What is the typical term used to describe the furniture sales agreement between the client and interior designer? Answer proposal 
 
Which veneer cut would result in the least veneer waste, but be the least desirable to use for the table? Answer rotary slicing 
 
When estimating how much fabric will be required for custom designed draperies, which needs to be considered hen determining to...
-
Construction Management Study Guide-Review Questions with correct answers|100% verified|18 pages
- Exam (elaborations) • 18 pages • 2024
-
- $12.99
- + learn more
Construction Management Study Guide-Review Questions with correct answers 
What two major components make up the contract documents? Correct Answer-Plans --> drawings 
Specs --> project manual 
 
When did architects first use their drawings to communicate design intent? Correct Answer-They built models and drew sketches to help explain to the builders what they wanted done. 
 
What does CAD stand for? Correct Answer-Computer Aided Design 
 
Typical drawing order in set of plans? Correct A...
-
CSI CDT Exam Questions With Correct Answers 100% Solved
- Exam (elaborations) • 15 pages • 2024
-
- $12.49
- + learn more
CSI CDT Exam Questions With Correct 
Answers 100% Solved 
Owner - answerPrinciple stakeholder - initiates project, assumes risk, provides funding 
AHJ - Authorities Having Jurisdiction - answerProtect public health, safety and welfare 
Design Team - answerAddress planning issues, determine design program, identify codes 
and regulations, produce procurement and construction documents, administer construction 
contract, *provide QA/QC procedures* 
Contractor Team - answerEntity that constructs a ...
Did you know that on average a seller on Stuvia earns $82 per month selling study resources? Hmm, hint, hint. Discover all about earning on Stuvia