FDOT Earthwork Level 1 Exam Questions With 100% Correct Answers.
- Exam (elaborations) • 8 pages • 2023
- Available in package deal
-
- $7.99
- 3x sold
- + learn more
Basics covered in Level 1 -Nuclear Testing 
Speedy Moisture 
Report Forms 
Earthwork has to do with the roadway in what way? -Earthwork is the excavation and placement 
of soils and materials supporting the proposed roadway. 
In Earthwork what is a lift? - 6" of compacted depth at full width 
In Earthwork what is a Lot? - A lot is 1 lift at 500 ft or within compacted area. Isolated compaction 
operations are separate lots. 
Sampling at the roadway is done for - Done for base, sub grade, and emba...
-
FDOT Asphalt Paving Level 2 Questions and Answers 2024 with complete solution
- Exam (elaborations) • 10 pages • 2024 Popular
-
- $11.49
- 2x sold
- + learn more
FDOT Asphalt Paving Level 2 Questions and Answers 2024 with complete solution
-
FDOT EXAM PACKAGE DEAL WITH COMPLETE SOLUTIONS.
- Package deal • 6 items • 2023
-
- $18.49
- 2x sold
- + learn more
FDOT EXAM PACKAGE DEAL WITH COMPLETE SOLUTIONS.
-
FDOT Asphalt Paving Level 2 Questions With Complete Solutions.
- Exam (elaborations) • 10 pages • 2023
- Available in package deal
-
- $7.99
- 1x sold
- + learn more
What makes up a quality asphalt mixture? - A quality asphalt mixture is determined by the 
constructability, if it conforms to Specifications, and if it satisfies functional requirements. 
CQC - contractor quality control 
Superpave - Asphalt mix design system since 1998 
QCP - Quality control plan 
QCM - Quality control Manual 
QC - Quality Control (Contracting Testing and Inspection) 
VT - Verification Testing (FDOT or CEI Verification) 
CEI - Construction Engineering and Inspection 
RT - Reso...
-
FDOT Final Estimates - Level 1 Exam Questions and Answers
- Exam (elaborations) • 4 pages • 2024
-
- $10.49
- 1x sold
- + learn more
FDOT Final Estimates - Level 1 Exam Questions and Answers
Make study stress less painful
-
FDOT Earthwork Level 1 Exam Questions And Correct Answers 2024 Update
- Exam (elaborations) • 6 pages • 2024
-
- $11.89
- 1x sold
- + learn more
FDOT Earthwork Level 1 Exam Questions And Correct Answers 2024 Update 
 
Basics covered in Level 1 - Answer -Nuclear Testing 
Speedy Moisture 
Report Forms 
 
Earthwork has to do with the roadway in what way? - Answer -Earthwork is the excavation and placement of soils and materials supporting the proposed roadway. 
 
In Earthwork what is a lift? - Answer -6" of compacted depth at full width 
 
In Earthwork what is a Lot? - Answer -A lot is 1 lift at 500 ft or within compacted area. Isolated co...
-
FDOT Asphalt Paving Level 1 Exam Test Questions with Correct Answers Graded A+
- Exam (elaborations) • 8 pages • 2024
-
- $11.49
- 1x sold
- + learn more
FDOT Asphalt Paving Level 1 Exam 
Test Questions with Correct Answers 
Graded A+ 
S to N Downstation 
W to E Downstation 
Stationing Starts at 0+00 
Stationing Measurement 1+00 is 100 feet 
Straight Edge is the Measurement of Pavement smoothness with a 15 foot 4.573 m rolling 
straightedge 
Straight Edge is used to identify problems 
Random sampling Are random numbers generated usually by a VT for cores to be extracted 
from the roadway 
How often should you calibrate a Straight edge Calibra...
-
Concrete Batch Plant Operator Exam (FDOT) Questions And Answers 2023
- Exam (elaborations) • 4 pages • 2023
-
Available in package deal
-
- $11.49
- 1x sold
- + learn more
Concrete Batch Plant Operator Exam (FDOT) Questions And Answers 2023 
 
Concrete Batch Plant Operator Exam (FDOT) Questions And Answers 2023
-
FDOT Earthwork 2 quick questions Exam Rated 100% Correct!!
- Exam (elaborations) • 2 pages • 2023
- Available in package deal
-
- $7.99
- 1x sold
- + learn more
muck - A-8 Material 
LBR - Strength test of material based on standardized 800 psi 
Select - Material that can be used anywhere in the the embankment 
one - number of density log books per contact 
verification - testing done by department 
dry - blank density is the weight of solid should 
lot - a single lift of finished material 
cover zone - area from the bottom of the pipe to 12 inches above 
resolution - testing to resolve QC & VT differences 
High Plastic - Material with LL greater than 50...
-
CONCRETE BATCH PLANT OPERATOR EXAM (FDOT) | QUESTIONS & ANSWERS (VERIFIED) | LATEST UPDATE | GRADED A+
- Exam (elaborations) • 8 pages • 2024
-
- $11.49
- 1x sold
- + learn more
1 
CONCRETE BATCH PLANT OPERATOR 
EXAM (FDOT) | QUESTIONS & 
ANSWERS (VERIFIED) | LATEST 
UPDATE | GRADED A+ 
Stockpiles of aggregate shall be maintained in a well-drained condition in order to: 
Correct Answer: Minimize Free Water Content 
Coarse aggregate stockpiles must be sprinkled for at lest how many hours prior to batch 
for FDOT? 
Correct Answer: 24 
Free moisture of the aggregate means: 
Correct Answer: Moister on the surface of an aggregate that is above and beyond 
the absorbed m...
Study stress? For sellers on Stuvia, these are actually golden times. KA-CHING! Earn from your study resources too and start uploading now. Discover all about earning on Stuvia