Nicet Highway Construction Level 2 Questions and Answers Already Passed
  • Nicet Highway Construction Level 2 Questions and Answers Already Passed

  • Exam (elaborations) • 14 pages • 2023
  • Nicet Highway Construction Level 2 Questions and Answers Already Passed What are the 5 types of bridge abutments? Closed Abutment, Stub or Perched Abutment, Pedestal or Spill-through Abutment, Integral End Bents, Mechanically Stabilized Abutment What is a "closed abutment"? A closed abutment is a full-height wall with wing walls on each side that retains the full height of the approach embankment. This type of abutment minimizes the required span length of the bridge. What is a stub or perc...
    (0)
  • $9.99
  • 1x sold
  • + learn more
ACI Concrete- Section 4 with complete verified solutions 2025(already passed).
  • ACI Concrete- Section 4 with complete verified solutions 2025(already passed).

  • Exam (elaborations) • 4 pages • 2024
  • ACI Concrete- Section 4 with complete verified solutions 2025(already passed).
    (0)
  • $14.99
  • + learn more
ACI Concrete- Section 4 Questions and  Answers Graded A+
  • ACI Concrete- Section 4 Questions and Answers Graded A+

  • Exam (elaborations) • 5 pages • 2024
  • Available in package deal
  • ACI Concrete- Section 4 Questions and Answers Graded A+ The diameter of the tamping rod used in this test method is ________. 16 mm (5/8") + or - 2 mm (1/16") What is the required shape of the tamping end of the rod Rounded to Hemispherical tip What is the required minimum frequency of the vibrator used in this test method? 9000 vibrations per minute (150Hz) The outside diameter or side dimension of the vibrating element must be at least ______ but not greater than _______. 1...
    (0)
  • $9.99
  • + learn more
ACI Concrete Field Testing Technician  Grade 1 Complete Study Guide 2024
  • ACI Concrete Field Testing Technician Grade 1 Complete Study Guide 2024

  • Exam (elaborations) • 7 pages • 2024
  • ACI Concrete Field Testing Technician Grade 1 Complete Study Guide 2024 ASTM C31 / C31M-06 - CORRECT ANSWER-Standard Practice for Making, Curing, Protecting & Transporting Test Specimens in the Field Conditions. ASTM C1064 /C1064M-05 - CORRECT ANSWER-Standard Test Method for Temperature of Freshly Mixed Hydraulic-Cement Concrete ASTM C172 -07 - CORRECT ANSWER-Standard Practice For Sampling Freshly Mixed Concrete From Different Containers Used In The Production or Transportation Of C...
    (0)
  • $12.49
  • + learn more
ACI Concrete Field Testing Technician Grade 1 Study Guide Latest Update  Rated A+
  • ACI Concrete Field Testing Technician Grade 1 Study Guide Latest Update Rated A+

  • Exam (elaborations) • 15 pages • 2024
  • Available in package deal
  • ACI Concrete Field Testing Technician Grade 1 Study Guide Latest Update Rated A+ ASTM C31 / C31M-06 Standard Practice for Making, Curing, Protecting & Transporting Test Specimens in the Field Conditions. ASTM C1064 /C1064M-05 Standard Test Method for Temperature of Freshly Mixed Hydraulic-Cement Concrete ASTM C172 -07 Standard Practice For Sampling Freshly Mixed Concrete From Different Containers Used In The Production or Transportation Of Concrete. ASTM C143 / C143M-05a Stand...
    (0)
  • $9.99
  • + learn more
ACI Concrete- Section 4 questions with 100% correct answers 2024
  • ACI Concrete- Section 4 questions with 100% correct answers 2024

  • Exam (elaborations) • 3 pages • 2024
  • Available in package deal
  • ACI Concrete- Section 4The diameter of the tamping rod used in this test method is ________. - correct answer 16 mm (5/8") + or - 2 mm (1/16") What is the required shape of the tamping end of the rod - correct answer Rounded to Hemispherical tip What is the required minimum frequency of the vibrator used in this test method? - correct answer 9000 vibrations per minute (150Hz) The outside diameter or side dimension of the vibrating element must be at least ______ but not greater than _...
    (0)
  • $9.99
  • + learn more
ACI Concrete Field Testing Technician Grade 1 Study Guide with Complete Solutions
  • ACI Concrete Field Testing Technician Grade 1 Study Guide with Complete Solutions

  • Exam (elaborations) • 12 pages • 2024
  • Available in package deal
  • ACI Concrete Field Testing Technician Grade 1 Study Guide with Complete Solutions ASTM C31 / C31M-06 - Answer-Standard Practice for Making, Curing, Protecting & Transporting Test Specimens in the Field Conditions. ASTM C1064 /C1064M-05 - Answer-Standard Test Method for Temperature of Freshly Mixed Hydraulic-Cement Concrete ASTM C172 -07 - Answer-Standard Practice For Sampling Freshly Mixed Concrete From Different Containers Used In The Production or Transportation Of Concrete. ASTM C143...
    (0)
  • $12.49
  • + learn more
ACI Concrete Field Testing Technician Grade 1 Study Guide 2024 with 100% Correct Answers
  • ACI Concrete Field Testing Technician Grade 1 Study Guide 2024 with 100% Correct Answers

  • Exam (elaborations) • 12 pages • 2024
  • Available in package deal
  • ACI Concrete Field Testing Technician Grade 1 Study Guide 2024 with 100% Correct Answers ASTM C31 / C31M-06 - Answer- Standard Practice for Making, Curing, Protecting & Transporting Test Specimens in the Field Conditions. ASTM C1064 /C1064M-05 - Answer- Standard Test Method for Temperature of Freshly Mixed Hydraulic-Cement Concrete ASTM C172 -07 - Answer- Standard Practice For Sampling Freshly Mixed Concrete From Different Containers Used In The Production or Transportation Of Concrete. ...
    (0)
  • $12.49
  • + learn more
Concrete ACI Certification Exam - Questions and Answers
  • Concrete ACI Certification Exam - Questions and Answers

  • Exam (elaborations) • 15 pages • 2024
  • Available in package deal
  • Concrete ACI Certification Exam - Questions and Answers What must be done if the concrete drops below the top of the Slump mold while the top layer is being rodded? Add additional concrete to keep an excess of concrete above the top of the mold at all times Rod each layer ___ times uniformly over the cross section with the rounded end of the rod. 25 The slump mold is filled in _____ layers. 3 layers True or false the slump mold should be in a dry condition before beginning the test? False. For...
    (0)
  • $18.49
  • + learn more
ACI Concrete Field Testing Technician Grade 1 Study Guide with Complete Solutions
  • ACI Concrete Field Testing Technician Grade 1 Study Guide with Complete Solutions

  • Exam (elaborations) • 12 pages • 2024
  • Available in package deal
  • ACI Concrete Field Testing Technician Grade 1 Study Guide with Complete Solutions ASTM C31 / C31M-06 - Answer-Standard Practice for Making, Curing, Protecting & Transporting Test Specimens in the Field Conditions. ASTM C1064 /C1064M-05 - Answer-Standard Test Method for Temperature of Freshly Mixed Hydraulic-Cement Concrete ASTM C172 -07 - Answer-Standard Practice For Sampling Freshly Mixed Concrete From Different Containers Used In The Production or Transportation Of Concrete. ASTM C143...
    (0)
  • $12.49
  • + learn more