Cubic yards - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Cubic yards? On this page you'll find 536 study documents about Cubic yards.

Page 4 out of 536 results

Sort by

Residential Contractor Exam with Complete Solutions
  • Residential Contractor Exam with Complete Solutions

  • Exam (elaborations) • 18 pages • 2024
  • Available in package deal
  • Residential Contractor Exam with Complete Solutions What are masonry exterior non-load bearing walls that are not wholly supported at each story? Correct answer Curtain Walls Buildings shall have an attic access where attic areas exceed 30 sq feet and have a vertical height of Correct answer 30" or greater The best piece of equipment to strip material over a long distance is a Correct answer Scraper The effect of loading uphill using a scraper is: Correct answer It increases cycle t...
    (0)
  • $13.99
  • + learn more
CSLB general b practice questions #1
  • CSLB general b practice questions #1

  • Exam (elaborations) • 17 pages • 2023
  • 1. It is better to use a leveling rod than a yard stick when using a transit because the rod is: A. Straighter B. Longer C. Easier to read D. Graduated to 64 h - Answer- longer 1. Fill dirt is measured in: A. Cubic yards B. Square yards C. Cubic feet D. Square feet - Answer- cubic yards 1. What backfill should be used after concrete forms have been removed? A. Silt B. Gravel C. Clay D. Sand - Answer- clay 1. The best type of material to set a house foundation on is: ...
    (0)
  • $12.49
  • + learn more
ACI Flatwork Questions and Answers  Already Passed
  • ACI Flatwork Questions and Answers Already Passed

  • Exam (elaborations) • 16 pages • 2024
  • Available in package deal
  • ACI Flatwork Questions and Answers Already Passed It is important that the ____________ __________ read and understand project specifications. finisher foreman If the crew can place and finish 100 yd3 of concrete per hour, the producer's delivery rate should be about _____ yd3 per hour. 100 Concrete is sold by the ton? False Delays in discharging concrete trucks can result in the concrete being hard to: pump, place, and finish When there is room for two concrete trucks read...
    (0)
  • $9.99
  • + learn more
Measurement HESI A2 Exam Questions & Answers 2024/2025
  • Measurement HESI A2 Exam Questions & Answers 2024/2025

  • Exam (elaborations) • 6 pages • 2024
  • Measurement HESI A2 Exam Questions & Answers 2024/2025 1 kilometer = _______ meters - ANSWERS1000 meters 1 meter = ________ centimeters - ANSWERS100 centimeters 1 centimeter = _________ millimeters - ANSWERS10 milliliters 1 inch = _______ centimeters - ANSWERS2.54 centimeters 1 mile = ________ yards - ANSWERS1760 yards 1 mile = _________ feet - ANSWERS5280 feet 1 yard = _____ feet - ANSWERS3 feet 1 foot = ______ inches - ANSWERS12 inches 1 liter = _______ milliliters...
    (0)
  • $7.99
  • + learn more
Michigan Builders Exam 390 Questions with Correct Answers 100% Verified
  • Michigan Builders Exam 390 Questions with Correct Answers 100% Verified

  • Exam (elaborations) • 33 pages • 2024
  • Available in package deal
  • Michigan Builders Exam 390 Questions with Correct Answers 100% Verified What is not a step in lead paint safety? - Correct Answers using a shopvac Each one gallon of water added to one yard of concrete will... - Correct Answers Reduce the PSI strength by 150. A construction lien can be placed on? - Correct Answers Residential, and Commercial property. Trench boxes are used.... - Correct Answers to protect workers in deeper excavation. About how much does a yard of dirt weigh? - Corr...
    (0)
  • $11.49
  • + learn more
Ma Hoisting License Questions With  Solutions
  • Ma Hoisting License Questions With Solutions

  • Exam (elaborations) • 34 pages • 2024
  • Ma Hoisting License Questions With Solutions WHAT DO YOU NEED TO INSPECT? ROPES CABLES CLUTCHES CHAINS AND BEARINGS GEARS AND ALL OTHER PARTS SUBJECT TO WEAR INPECTION FORMS SHOULD BE FILLED OUT AND KEPT ON FILE FOR THE LIFE OF THE MACHINE SHOULD BE INSPECTED DAILY OR AT EVERY SHIFT OR EVERY 30 DAYS CUBIC YARDS A STANDARD WHEELBARROW: 1 CUBIC YARD WHAT DO YOU NEED TO INSPECT? ROPES CABLES CLUTCHES CHAINS AND BEARINGS GEARS AND ALL OTHER PARTS SUBJECT TO WEAR INPECTION F...
    (0)
  • $19.49
  • + learn more
HESI A2 Math 2024
  • HESI A2 Math 2024

  • Exam (elaborations) • 77 pages • 2024
  • 0 Degrees Celsius = ____ Degrees Fahrenheit 32 100 Degrees Celsius = ____ Degrees Fahrenheit 212 1 kilometer = ____ meters 1000 1 meter = ____ centimeters 100 cm 1 inch = ____ centimeters 2.54 cm 1 mile = ____ feet 5,280 1 mile = ____ yards 1,760 1 yard = ____ feet 3ft 1 foot = ____ inches 12 in 1 liter = ____ milliliters 1000 1 milliliter = ____ cubic centimeter 1 1 gallon = ____ quarts 4 1 gallon = ____ pints 8 1 gal...
    (0)
  • $16.49
  • + learn more
Hesi A2 Math Latest Study Guide 2024
  • Hesi A2 Math Latest Study Guide 2024

  • Exam (elaborations) • 88 pages • 2024
  • 0 Degrees Celsius = ____ Degrees Fahrenheit 32 100 Degrees Celsius = ____ Degrees Fahrenheit 212 1 kilometer = ____ meters 1000 1 meter = ____ centimeters 100 cm 1 inch = ____ centimeters 2.54 cm 1 mile = ____ feet 5,280 1 mile = ____ yards 1,760 1 yard = ____ feet 3ft 1 foot = ____ inches 12 in 1 liter = ____ milliliters 1000 1 milliliter = ____ cubic centimeter 1 1 gallon = ____ quarts 4 1 gallon = ____ pints 8 1 gal...
    (0)
  • $14.99
  • + learn more
CSLB general b practice questions #1 Correct Questions & Answers!!
  • CSLB general b practice questions #1 Correct Questions & Answers!!

  • Exam (elaborations) • 17 pages • 2023
  • 1. It is better to use a leveling rod than a yard stick when using a transit because the rod is: A. Straighter B. Longer C. Easier to read D. Graduated to 64 h - ANSWERSlonger 1. Fill dirt is measured in: A. Cubic yards B. Square yards C. Cubic feet D. Square feet - ANSWERScubic yards 1. What backfill should be used after concrete forms have been removed? A. Silt B. Gravel C. Clay D. Sand - ANSWERSclay 1. The best type of material to set a house foundation on is: A....
    (0)
  • $12.99
  • + learn more
NCCER Module 2 Questions and Answers 100% Pass
  • NCCER Module 2 Questions and Answers 100% Pass

  • Exam (elaborations) • 22 pages • 2024
  • Available in package deal
  • An estimator is preparing a bid for a home remodeling project. She has determined that the new garage needs 324 feet of 2x10 lumber; the new rec room requires 430 feet; and the new upstairs bonus room needs 283 feet. How many feet of 2x10 lumber will be needed? - 1,037 feet A plumbing contractor bid the rough-in work for a new three story office building based an estimate of 850 hours of a journey-level plumber's time on the job. After the job was in progress, the contractor determined tha...
    (0)
  • $9.49
  • + learn more