Bmps - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Bmps? On this page you'll find 211 study documents about Bmps.
Page 4 out of 211 results
Sort by
-
Category A and E Pesticide Test Practice Latest Update Graded A+
- Exam (elaborations) • 21 pages • 2024
- Available in package deal
-
- $9.99
- + learn more
Category A and E Pesticide Test Practice 
 
Latest Update Graded A+ 
 
Selective herbicide Control certain types of plants, especially with other plant 
 
Pesticide Misuse -Not using a pesticide according to label directions 
-using a pesticide not registered for sale or use in MN 
-applying without a license 
-applying in a endangering way to animals/ppl/environment 
 
MDA MN Department of Agriculture 
 
FIFRA Federal insecticide, fungicide, and rodenticide act . 
 
Restricted Use Pesticides (R...
-
ISA Utility Specialist (Chapters 1-7)
- Exam (elaborations) • 33 pages • 2023
-
- $12.99
- + learn more
In the U.S., enforcement of safety work rules resides with: - Answer- Occupational Safety & Health Administration 
(OSHA) 
 
Utility pruning is the pruning of trees located in the vicinity of power lines for the purpose of __________ __________ __________. - Answer- ensuring reliable service 
 
A comprehensive vegetation management program should be __________ rather than reactive, & based on principals of __________ vegetation management. - Answer- proactive; 
integrated 
 
What is a volt? - An...
-
CESSWI Part 2 Questions With Correct Answers!!
- Exam (elaborations) • 37 pages • 2024
- Available in package deal
-
- $8.39
- + learn more
Existing Veg, Desc/Purp - Answer-temp or perm bmp desi to stab soil and remove sups part from 
sheet flow runoff. 
Existing Veg, Objectives - Answer-1) Site Plan and Mang 
2) Erosi Cont 
3) Sedi Cont 
4) Post-Cons Mang 
Existing Veg, applic - Answer-1) Areas within site where no const activity is occur 
2) Areas where local, state and fed govt require preservation 
3) Areas where existing veg can be utilized for eros, sedi, and storm water quality. 
Existing veg: inspection - Answer-1) Accord to...
-
COSC 153 Exam Questions with All Correct Answers
- Exam (elaborations) • 12 pages • 2024
-
Available in package deal
-
- $12.59
- + learn more
COSC 153 Exam Questions with All Correct Answers 
 
 
There are several types of meetings held by the contractor on the project site. Minutes should be kept for all meetings, especially ones involving job progress. - Answer-Meeting Minutes 
 
Is important to preserve a permanent record of the project - Answer-Record keeping and documentation 
 
Documentation and record keeping _________________ by keeping track of all actions on the project - Answer-protects all parties 
 
Following construction...
-
Turf (3b): Turf Pest Management - Test Your Knowledge (all solved)
- Exam (elaborations) • 8 pages • 2023
-
- $8.39
- 1x sold
- + learn more
Name some of the factors turfgrass managers must consider when setting pest management priorities. correct answers Turfgrass management professionals must consider human safety, environmental safety, turf use(s), efficacy, and economics. 
 
Why do pest management thresholds in turf vary? correct answers Pest thresholds vary from site to site because they depend on site characteristics and uses. For example, there may be zero tolerance for pests of any sort on a gold green. On the other hand, the...
And that's how you make extra money
-
Florida Pesticide Exam- Ornamental and Turfgrass Pest Management Exam with complete solutions
- Exam (elaborations) • 9 pages • 2023
-
Available in package deal
-
- $10.99
- 2x sold
- + learn more
Continuing education unit - Answer- approximately one hour of study credit used to make up the total of 16 CEUs required for ornamental and turf pest control applicator recertification 
 
Florida Department of Agriculture and Consumer Services (FDACS) - Answer- the agency that administers the Florida Pesticide Law (Chapter 487) 
 
Florida Pesticide Law - Answer- The law that governs the use of pesticides in Florida, which is administered by the Florida Department of Agricultural and Consumer Ser...
-
LEED Green Associate Complete Test Bank complete A+ study guide_ Summer 2023-2024.
- Summary • 139 pages • 2023
-
- $11.39
- 1x sold
- + learn more
LEED Green Associate Complete Test Bank with a Complete A+ study guide_ Summer 2023-2024. 
Who can use the USGMC Member Logo? 
 - Only USGBC Members in good standing. 
 
What can be used to assist with the certification of projects in a campus of multi-building setting such as corporate campuses, college campuses and government installations? 
 - ** The LEED for Multiple Buildings and On-Campus Building rating system provides direction in applying LEED for New Construction to projects in a campu...
-
CESSWI Exam Questions And Answers
- Exam (elaborations) • 7 pages • 2024
- Available in package deal
-
- $10.49
- + learn more
CESSWI Exam Questions And Answers 
 
 
Temporary stabilization - ANS stone or plastic as a BMP to reduce erosion by stabilizing areas that will lay bare for an extended amount of time. EX. stockpiles, dikes, dams 
 
5 types of plans - ANS 1. SWPPP 
2. erosion and sed. plan (ESCP) 
3. drainage plan/grading plan 
4. spill prevention control and countermeasure plan (SPCC) 
5. MS4 stormwater management plan/program (SWMP) 
 
SWPPP - ANS -required by NPDES for industrial, multi sector, and ...
-
CESSWI Part 2 Exam Questions And Answers All Verified
- Exam (elaborations) • 27 pages • 2024
- Available in package deal
-
- $13.99
- + learn more
CESSWI Part 2 Exam Questions And Answers All Verified 
 
 
Existing Veg, Desc/Purp - ANS temp or perm bmp desi to stab soil and remove sups part from sheet flow runoff. 
 
Existing Veg, Objectives - ANS 1) Site Plan and Mang 
2) Erosi Cont 
3) Sedi Cont 
4) Post-Cons Mang 
 
Existing Veg, applic - ANS 1) Areas within site where no const activity is occur 
2) Areas where local, state and fed govt require preservation 
3) Areas where existing veg can be utilized for eros, sedi, and storm...
-
VA DEQ SWM Inspector Exam Latest Version 2024/2025 Expert-Verified Q&As
- Exam (elaborations) • 7 pages • 2024
-
- $7.99
- + learn more
A locality VSMP must be at least as stringent as what state permit? - The construction GP 
A SWM Plan must be approved by who prior to land disturbance? - the VSMP Program Authority 
all SWPPP requirements may be met by - incorporating other plans into reference, or by developing 
missing elements. 
At what % impervious cover are streams substantially affected? - 25% 
BMPs use these three mechanisms to control pollution: - Infiltration, settling, and vegetative uptake 
Co-located practices - Dur...
Did you know that on average a seller on Stuvia earns $82 per month selling study resources? Hmm, hint, hint. Discover all about earning on Stuvia