What are outriggers - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about What are outriggers? On this page you'll find 288 study documents about What are outriggers.

Page 3 out of 288 results

Sort by

NCCCO MOBILE CRANE QUESTIONS & ANSWERS  CORRECT 100%
  • NCCCO MOBILE CRANE QUESTIONS & ANSWERS CORRECT 100%

  • Exam (elaborations) • 26 pages • 2024
  • Available in package deal
  • 1. What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? a. Boom down b. Swing c. Boom up d. Extend boom - ANSWER c. 2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratings in the load chart to remain valid? a. 1% b. 2% c. 5% d. 8% - ANSWER a. 9. Which area do truck cranes without a 5th outrigger gener...
    (0)
  • $14.99
  • + learn more
NCCCO CORE Questions | 100% Correct Answers | Verified | Latest 2024 Version
  • NCCCO CORE Questions | 100% Correct Answers | Verified | Latest 2024 Version

  • Exam (elaborations) • 11 pages • 2024
  • Available in package deal
  • Before leveling a mobile crane on outriggers, an operator should ensure: - there is no weight of the crane bearing on any tires Operating a mobile crane with a long boom, on uneven ground, what support condition should be considered? - Keeping 90 degree angle between cylinder rod and pad What is the primary purpose fir a rooster sheave or auxiliary boom point sheave? - Separate the boom hoist lines How many randomly broken wires in a lay length must there be on a mobile cranes hoist line, ...
    (0)
  • $10.49
  • + learn more
NCCCO Core Questions and Answers with Complete Solutions Graded A 2024
  • NCCCO Core Questions and Answers with Complete Solutions Graded A 2024

  • Exam (elaborations) • 22 pages • 2024
  • The term "Superstructure or Upper works" refers to the area of the crane: Above the swing circle A crane must be level within _______% for the load chart ratings to be valid? 1% On what principle is crane stability based? Leverage What would be the effect of moving the tipping axis closer to the cranes center of gravity? Reduced stability Which of the following matches the appropriate load chart to a particular crane? Serial number A durable rating chart with legi...
    (0)
  • $12.49
  • + learn more
NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% VERIFIED)
  • NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% VERIFIED)

  • Exam (elaborations) • 12 pages • 2024
  • Available in package deal
  • NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% VERIFIED) When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratings in the load chart to remain valid? a. 1% b. 2% c. 5% d. 8% correct answers a. 3. The load line of the crane you're operating contacts an energized power line. There's no sign of any other danger, such as fire. What should you do? a. Climb down carefully from the crane cab b. Jump do...
    (0)
  • $14.99
  • + learn more
NCCCO Core Questions & Answers (RATED A+)
  • NCCCO Core Questions & Answers (RATED A+)

  • Exam (elaborations) • 13 pages • 2024
  • The term "Superstructure or Upper works" refers to the area of the crane: - ANSWERAbove the swing circle A crane must be level within _______% for the load chart ratings to be valid? - ANSWER1% Which of the following matches the appropriate load chart to a particular crane? - ANSWERSerial number A durable rating chart with legible letters and figures shall be provided with each crane accessible to: - ANSWERThe operator at the controls On what principle is crane stability based?...
    (0)
  • $13.89
  • + learn more
OSHA 30 CONSTRUCTION FINAL EXAM
  • OSHA 30 CONSTRUCTION FINAL EXAM

  • Exam (elaborations) • 75 pages • 2024
  • OSHA 30 CONSTRUCTION FINAL EXAM 1. OSHA requires training to be provided within one year of when a safety and health program is first established A. True B. False (correct answer) The minimum safe distance for equipment operating in proximity to energized power lines that contain up to 50,000 volts is A. 25 feet B. 5 feet C. 10 feet (correct answer) D. 50 feet The GFCI fits into the standard electrical outlet box to protect ground faults. A. Disposable B. Receptacle (...
    (0)
  • $10.99
  • + learn more
NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS LATEST 2024/2025 (100% CORRECT)
  • NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS LATEST 2024/2025 (100% CORRECT)

  • Exam (elaborations) • 12 pages • 2024
  • Available in package deal
  • NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS LATEST 2024/2025 (100% CORRECT) What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? a. Boom down b. Swing c. Boom up d. Extend boom correct answers c. 2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratings in the load chart to remain valid? a. 1% b. 2% c. 5% d. 8%...
    (0)
  • $14.99
  • + learn more
NCCCO CORE Correct Questions & Answers(RATED A+)
  • NCCCO CORE Correct Questions & Answers(RATED A+)

  • Exam (elaborations) • 11 pages • 2024
  • Before leveling a mobile crane on outriggers, an operator should ensure: - ANSWERthere is no weight of the crane bearing on any tires Operating a mobile crane with a long boom, on uneven ground, what support condition should be considered? - ANSWERKeeping 90 degree angle between cylinder rod and pad What is the primary purpose fir a rooster sheave or auxiliary boom point sheave? - ANSWERSeparate the boom hoist lines How many randomly broken wires in a lay length must there be on a mobil...
    (0)
  • $13.49
  • + learn more
NCCCO MOBILE CRANE EXAM – 99 QUESTIONS WITH 100% CORRECT ANSWERS
  • NCCCO MOBILE CRANE EXAM – 99 QUESTIONS WITH 100% CORRECT ANSWERS

  • Exam (elaborations) • 17 pages • 2023
  • Available in package deal
  • 1. What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? a. Boom down b. Swing c. Boom up d. Extend boom c. 2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratings in the load chart to remain valid? a. 1% b. 2% c. 5% d. 8% a. 3. The load line of the crane you're operating contacts an energized powe...
    (1)
  • $15.99
  • + learn more
NCCCO CORE EXAM QUESTIONS WITH COMPLETE SOLUTIONS 2024/2025
  • NCCCO CORE EXAM QUESTIONS WITH COMPLETE SOLUTIONS 2024/2025

  • Exam (elaborations) • 11 pages • 2024
  • Available in package deal
  • NCCCO CORE EXAM QUESTIONS WITH COMPLETE SOLUTIONS 2024/2025 Before leveling a mobile crane on outriggers, an operator should ensure: - Correct Answer there is no weight of the crane bearing on any tires Operating a mobile crane with a long boom, on uneven ground, what support condition should be considered? - Correct Answer Keeping 90 degree angle between cylinder rod and pad What is the primary purpose fir a rooster sheave or auxiliary boom point sheave? - Correct Answer Separate the boo...
    (0)
  • $11.49
  • + learn more