[Show more]. What action does a signal person intend the operator to perform if he extends his arm at shoulder 
height, makes a fist with his hand, and sticks his/her thumb up? 
a. Boom down 
b. Swing 
c. Boom up 
d. Extend boom - c. 
2. When hoisting personnel, within what percentage of level must a telescopi...
Preview 3 out of 16 pages
Add to cart. What action does a signal person intend the operator to perform if he extends his arm at shoulder 
height, makes a fist with his hand, and sticks his/her thumb up? 
a. Boom down 
b. Swing 
c. Boom up 
d. Extend boom - c. 
2. When hoisting personnel, within what percentage of level must a telescopi...
Before leveling a mobile crane on outriggers, an operator should ensure: - there is no weight of the 
crane bearing on any tires 
Operating a mobile crane with a long boom, on uneven ground, what support condition should be 
considered? - Keeping 90 degree angle between cylinder rod and pad 
What is...
Preview 2 out of 11 pages
Add to cartBefore leveling a mobile crane on outriggers, an operator should ensure: - there is no weight of the 
crane bearing on any tires 
Operating a mobile crane with a long boom, on uneven ground, what support condition should be 
considered? - Keeping 90 degree angle between cylinder rod and pad 
What is...
1. What action does a signal person intend the operator to perform if he extends his arm at shoulder 
height, makes a fist with his hand, and sticks his/her thumb up? 
a. Boom down 
b. Swing 
c. Boom up 
d. Extend boom - c. 
2. When hoisting personnel, within what percentage of level must a telescop...
Preview 3 out of 16 pages
Add to cart1. What action does a signal person intend the operator to perform if he extends his arm at shoulder 
height, makes a fist with his hand, and sticks his/her thumb up? 
a. Boom down 
b. Swing 
c. Boom up 
d. Extend boom - c. 
2. When hoisting personnel, within what percentage of level must a telescop...
Where is the best location for leveling a crane? - Upperworks 
When determining the "gross load" the best method is: - Get an accurate load weight and add the 
rigging. 
By order of hitch strength, which is the correct answer? - Basket, vertical, choker 
What is the purpose of using a jib? - Incre...
Preview 1 out of 4 pages
Add to cartWhere is the best location for leveling a crane? - Upperworks 
When determining the "gross load" the best method is: - Get an accurate load weight and add the 
rigging. 
By order of hitch strength, which is the correct answer? - Basket, vertical, choker 
What is the purpose of using a jib? - Incre...
Which area do truck cranes without a 5th outrigger generally have no lifting capacity unless the 
manufacturer states otherwise? - The front 
What is the definition of "operating radius?" - The distance from the center of rotation of the crane 
to the center of gravity of the load 
What applies to...
Preview 2 out of 5 pages
Add to cartWhich area do truck cranes without a 5th outrigger generally have no lifting capacity unless the 
manufacturer states otherwise? - The front 
What is the definition of "operating radius?" - The distance from the center of rotation of the crane 
to the center of gravity of the load 
What applies to...
Splices in rail tracks shall have - Smooth Joints 
Hydraulic systems should have their proper fluid level checked - Daily 
If power fails during operations, the following shouldn't apply - Do your best to finish moving load 
where it was designated to go 
If load is undetermined who is to find out ...
Preview 2 out of 13 pages
Add to cartSplices in rail tracks shall have - Smooth Joints 
Hydraulic systems should have their proper fluid level checked - Daily 
If power fails during operations, the following shouldn't apply - Do your best to finish moving load 
where it was designated to go 
If load is undetermined who is to find out ...
1. A wire rope that is a 6x19 classification could have how many wires per strand? - 15 through 26 
wires per strand 
2. How often should a synthetic web sling be inspected? - Each day before use 
3. Which considerations should be given to suspend lifting operations with a mobile crane? - Winds 
in ...
Preview 2 out of 6 pages
Add to cart1. A wire rope that is a 6x19 classification could have how many wires per strand? - 15 through 26 
wires per strand 
2. How often should a synthetic web sling be inspected? - Each day before use 
3. Which considerations should be given to suspend lifting operations with a mobile crane? - Winds 
in ...
When making a multiple crane lift, it is important for the operator to understand that: - The weight 
may increase if the other crane lands the load 
If a crane is not set-up level and the operator swings a load from the high side to the low side, the load 
radius will: - Increase 
Most crane manufa...
Preview 1 out of 4 pages
Add to cartWhen making a multiple crane lift, it is important for the operator to understand that: - The weight 
may increase if the other crane lands the load 
If a crane is not set-up level and the operator swings a load from the high side to the low side, the load 
radius will: - Increase 
Most crane manufa...
The lattice boom is designed to take winds of up to 20 mph. from the side plus a full rated load, plus a 
direct side load equal to what percent of the rated load? - 2% 
The part of the load chart governed by stability is based on what percentage of capacity while a crawler 
crane is working over th...
Preview 2 out of 6 pages
Add to cartThe lattice boom is designed to take winds of up to 20 mph. from the side plus a full rated load, plus a 
direct side load equal to what percent of the rated load? - 2% 
The part of the load chart governed by stability is based on what percentage of capacity while a crawler 
crane is working over th...
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Stuvia is a marketplace, so you are not buying this document from us, but from seller AmazingGrace. Stuvia facilitates payment to the seller.
No, you only buy these notes for $40.49. You're not tied to anything after your purchase.
4.6 stars on Google & Trustpilot (+1000 reviews)
71498 documents were sold in the last 30 days
Founded in 2010, the go-to place to buy study notes for 14 years now