Nerc voltage control - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Nerc voltage control? On this page you'll find 177 study documents about Nerc voltage control.

Page 3 out of 177 results

Sort by

NERC SOS quiz Questions and Answers (Already GRADED A)
  • NERC SOS quiz Questions and Answers (Already GRADED A)

  • Exam (elaborations) • 60 pages • 2023
  • If a Balancing Authority does not comply with the Control Performance Standard, the Balancing Authority is not permitted to provide which of the following for any other Balancing Authority entities? Regulation of other services related to control performance 1. It is the obligation of each Balancing Authority to fulfill its commitment to the Interconnection and not ________ the other balancing Authorities in the Interconnection Burden A Balancing Authority is performing Overlap Regul...
    (0)
  • $11.49
  • + learn more
PJM Generator Exam Questions & Correct  Answers | Latest Update |Already Graded A+
  • PJM Generator Exam Questions & Correct Answers | Latest Update |Already Graded A+

  • Exam (elaborations) • 11 pages • 2024
  • The purpose of the Deploy All Resources Action is to instruct all generating resources to be on line and at full output _________ : immediately upon receipt of dispatch instruction A Heavy Load Voltage Schedule Warning has been issued for the PJM RTO. Generation Operators should: : Ensure all unit voltage regulators are in service PJM can issue the Deploy All Resources Action for________ : the entire RTO, specific Control Zones or a subset of a Control Zone if transmission limitations...
    (0)
  • $10.99
  • + learn more
NERC PREP TEST 101 Questions With Correct Answers
  • NERC PREP TEST 101 Questions With Correct Answers

  • Exam (elaborations) • 57 pages • 2024
  • Available in package deal
  • 1. If a 500 kV transmission line with a surge impedance loading of 800 MW is currently loaded at 1400 MW, which of the following events would most likely occur? a. Generator MVAR output would increase b. All system capacitors would trip off-line c. Generator MVAR output would decrease d. All automatic reactors would connect to the system - Answer a. Generator MVAR output would increase 2. When system conditions are such that emergency procedures are expected to be implemented, which of ...
    (0)
  • $13.49
  • + learn more
HSI Final Test Questions with Correct Answer Latest Update
  • HSI Final Test Questions with Correct Answer Latest Update

  • Exam (elaborations) • 20 pages • 2024
  • Available in package deal
  • HSI Final Test Questions with Correct Answer Latest Update Interconnection frequency is 59.80 Hz . Your ACE is a large negative value and your AGC is pulsing your units down . What should you do •Leave AGC in operation but investigate •Place AGC in constant frequency control •Place AGC in flat tie line control •Suspend AGC and investigate - Answer-•Suspend AGC and investigate When a Balancing Authority's ACE value is the same sign as the frequency deviation , which NERC ...
    (0)
  • $16.49
  • + learn more
NERC Prep Exam Questions and Answers Latest 2023-2024 Graded A+
  • NERC Prep Exam Questions and Answers Latest 2023-2024 Graded A+

  • Exam (elaborations) • 22 pages • 2023
  • Available in package deal
  • NERC Prep Exam Questions and Answers Latest Graded A+. What Energy Alert Level would the following example be categorized as? "A Balancing Authority, Reserve Sharing Group, or Load Serving Entity foresees, or is experiencing conditions where all available resources are committed to meet firm load, firm transactions, etc, and requests an Energy Emergency Alert." NERC Prep - Bal, Int, & Trans Exam Questions and Answers Graded A+ a. Energy Emergency Alert Level IV b. Energy Emergency Al...
    (0)
  • $16.49
  • + learn more
NERC Exam Questions With 100% Correct Answers Latest Updated 2024 (Graded A+)
  • NERC Exam Questions With 100% Correct Answers Latest Updated 2024 (Graded A+)

  • Exam (elaborations) • 22 pages • 2024
  • NERC Exam Questions With 100% Correct Answers Latest Updated 2024 (Graded A+) What group can approve a change in the Disturbance Recovery Period for an Interconnection? a. NERC Interconnection Working Group b. NERC Operating Committee c. NERC Regional Council d. NERC Disturbance Analysis Working Group c. Check targets and equipment - What is the first thing an operator should do after a relay operation? a. Check power system stabilizers b. Notify adjacent Transmission and Balancing area...
    (0)
  • $17.49
  • + learn more
NERC test Questions with 100% Correct Solutions| Graded A+
  • NERC test Questions with 100% Correct Solutions| Graded A+

  • Exam (elaborations) • 30 pages • 2023
  • Operating reserve may be provided by which of the following? A. LTCs B. Capacitor banks C. Voltage regulators D. Interruptible loads - D. Interruptible loads Which of the following is the responsibility of a reserve sharing group (RSG)? A. Complying with DCS as if it was a single control area B. Proving regulation service for neighboring RSGs C. Ensuring each control area in the group maintains 50% blackstart capability D. Complying with the control performance standards as if it w...
    (0)
  • $11.99
  • + learn more
NERC text questions and Correct Answers
  • NERC text questions and Correct Answers

  • Exam (elaborations) • 32 pages • 2024
  • Available in package deal
  • NERC text questions and Correct Answers Operating reserve may be provided by which of the following? A. LTCs B. Capacitor banks C. Voltage regulators D. Interruptible loads - Correct Answer: D. Interruptible loads Which of the following is the responsibility of a reserve sharing group (RSG)? A. Complying with DCS as if it was a single control area B. Proving regulation service for neighboring RSGs C. Ensuring each control area in the group maintains 50% blackstart capability D. Com...
    (0)
  • $12.99
  • + learn more
NERC book quiz with correct answers graded A+
  • NERC book quiz with correct answers graded A+

  • Exam (elaborations) • 18 pages • 2023
  • NERC book quiz with correct answers graded A+ You are an external BA with a frequency bais of 20 MW/.1 Hz that sees a frequency of 60.02 due to a large loss of load in the contingent BA. If your generator governor control systems responded to the frequency deviation approximately how much of a generation change would you BA experience? - Answer -4MW Net actual interchange minus Net scheduled interchange is what? - Answer Inadvertent interchange Suppose your interconnection operators at ...
    (0)
  • $9.99
  • + learn more
NERC BI - RELIABILITY AND FUNCTION WITH 100% CORRECT ANSWERS ALREADY GRADED A+
  • NERC BI - RELIABILITY AND FUNCTION WITH 100% CORRECT ANSWERS ALREADY GRADED A+

  • Exam (elaborations) • 18 pages • 2023
  • Available in package deal
  • FERC The Energy Regulatory Commission; energy authority and governing body NERC The North American Electric Reliability Corporation, certified as the "electric reliability organization" for the continental United States, compliance monitoring FERC functions Regulates transmission of electric, gas and oil Review mergers and acquisitions and corporate transactions by electric companies Protection of high voltage reliability through reliability standards Enforcement of r...
    (0)
  • $14.49
  • + learn more