What is the calculation used for determining inadvertent interchange? - Correct Answer: Net actual interchange minus net scheduled interchange 
 
Which of the following would be a suitable use for a pseudo-tie? - Correct Answer: Accounting for jointly owned gene...
Preview 1 out of 2 pages
Add to cartNERC QUESTIONS AND CORRECT ANSWERS 
 
What is the calculation used for determining inadvertent interchange? - Correct Answer: Net actual interchange minus net scheduled interchange 
 
Which of the following would be a suitable use for a pseudo-tie? - Correct Answer: Accounting for jointly owned gene...
NERC Test Questions AND Correct Answers 
 
What percentage of load gives a 1 Hz change in an island condition? - Correct Answer: 6-10% (Think 6-10 day island vacation) 
 
If ACE is Zero but system Hz is off, what should a system operator do? - Correct Answer: Nothing! ACE bias and interchange schedu...
Preview 3 out of 22 pages
Add to cartNERC Test Questions AND Correct Answers 
 
What percentage of load gives a 1 Hz change in an island condition? - Correct Answer: 6-10% (Think 6-10 day island vacation) 
 
If ACE is Zero but system Hz is off, what should a system operator do? - Correct Answer: Nothing! ACE bias and interchange schedu...
NERC text questions and Correct Answers 
 
Operating reserve may be provided by which of the following? 
A. LTCs 
B. Capacitor banks 
C. Voltage regulators 
D. Interruptible loads - Correct Answer: D. Interruptible loads 
 
Which of the following is the responsibility of a reserve sharing group (RSG...
Preview 4 out of 32 pages
Add to cartNERC text questions and Correct Answers 
 
Operating reserve may be provided by which of the following? 
A. LTCs 
B. Capacitor banks 
C. Voltage regulators 
D. Interruptible loads - Correct Answer: D. Interruptible loads 
 
Which of the following is the responsibility of a reserve sharing group (RSG...
Additional NERC Test Questions and Correct Answers 
 
1. Balancing Authority A is importing MW and has a tie-Iine flowing into them when the meter fails to zero. Which of the following statements is true? 
A) The Balancing Authority's frequency will drop 
B) The Balancing Authority's generators on...
Preview 3 out of 20 pages
Add to cartAdditional NERC Test Questions and Correct Answers 
 
1. Balancing Authority A is importing MW and has a tie-Iine flowing into them when the meter fails to zero. Which of the following statements is true? 
A) The Balancing Authority's frequency will drop 
B) The Balancing Authority's generators on...
NERC EXAM PREPARATION QUESTIONS AND CORRECT ANSWERS 
 
BAAL DOES NOT APPLY - Correct Answer: According to BAAL requirements of BAL-001, which of the following statements is true when actual frequency is greater than Scheduled Frequency? 
 
Tie Lines - Correct Answer: The ACE equation must include me...
Preview 1 out of 2 pages
Add to cartNERC EXAM PREPARATION QUESTIONS AND CORRECT ANSWERS 
 
BAAL DOES NOT APPLY - Correct Answer: According to BAAL requirements of BAL-001, which of the following statements is true when actual frequency is greater than Scheduled Frequency? 
 
Tie Lines - Correct Answer: The ACE equation must include me...
SOS NERC Prep - RElIABILITY Exam Questions and Correct Answers 
 
The Reliability Coordinator just informed you of a slow time error correction which will begin at the top of the next hour. Your EMS system will not let you change your scheduled frequency. Your Frequency Bias Setting is -100 MW/.1Hz....
Preview 4 out of 76 pages
Add to cartSOS NERC Prep - RElIABILITY Exam Questions and Correct Answers 
 
The Reliability Coordinator just informed you of a slow time error correction which will begin at the top of the next hour. Your EMS system will not let you change your scheduled frequency. Your Frequency Bias Setting is -100 MW/.1Hz....
Correct Answer: B) False 
 
True/False 
 
Analysis type questions are designed to be the least complex from a human cognitive process. 
 
A) True 
B) False - Correct Answer: B) False 
 
True/False 
 
A Transmission Service Provider is an entity that both owns and operates transmission facilities on ...
Preview 3 out of 25 pages
Add to cartCorrect Answer: B) False 
 
True/False 
 
Analysis type questions are designed to be the least complex from a human cognitive process. 
 
A) True 
B) False - Correct Answer: B) False 
 
True/False 
 
A Transmission Service Provider is an entity that both owns and operates transmission facilities on ...
NERC PREP TEST 101 Questions and Correct Answers 
 
1. If a 500 kV transmission line with a surge impedance loading of 800 MW is currently loaded at 1400 MW, which of the following events would most likely occur? 
 
a. Generator MVAR output would increase 
b. All system capacitors would trip off-lin...
Preview 4 out of 55 pages
Add to cartNERC PREP TEST 101 Questions and Correct Answers 
 
1. If a 500 kV transmission line with a surge impedance loading of 800 MW is currently loaded at 1400 MW, which of the following events would most likely occur? 
 
a. Generator MVAR output would increase 
b. All system capacitors would trip off-lin...
NERC Prep - Bal, Int, & Trans Test Questions and Correct Answers 
 
b. NERC Operating Committee - Correct Answer: What group can approve a change in the Disturbance Recovery Period for an Interconnection? 
 a. NERC Interconnection Working Group 
 b. NERC Operating Committee 
 c. NERC Regional Counci...
Preview 3 out of 17 pages
Add to cartNERC Prep - Bal, Int, & Trans Test Questions and Correct Answers 
 
b. NERC Operating Committee - Correct Answer: What group can approve a change in the Disturbance Recovery Period for an Interconnection? 
 a. NERC Interconnection Working Group 
 b. NERC Operating Committee 
 c. NERC Regional Counci...
NERC RC Exam Questions and Correct Answers 
 
Common standard time period for station battery to handle outage of AC power to chargers - Correct Answer: 8-12 hours 
 
Time to restore data exchange redundancy when redundancy testing by RC/TOP/BA deemed unsuccessful - Correct Answer: 2 hours 
 
Transi...
Preview 2 out of 9 pages
Add to cartNERC RC Exam Questions and Correct Answers 
 
Common standard time period for station battery to handle outage of AC power to chargers - Correct Answer: 8-12 hours 
 
Time to restore data exchange redundancy when redundancy testing by RC/TOP/BA deemed unsuccessful - Correct Answer: 2 hours 
 
Transi...
NERC Transmission Practice Test Questions and Correct Answers 
 
Which type of relay operates on the premise of comparing the flow in and out of the area of protection? - Correct Answer: Differential relay 
 
Underfrequency load shedding is set-up so that which of the following does NOT occur? - Cor...
Preview 1 out of 2 pages
Add to cartNERC Transmission Practice Test Questions and Correct Answers 
 
Which type of relay operates on the premise of comparing the flow in and out of the area of protection? - Correct Answer: Differential relay 
 
Underfrequency load shedding is set-up so that which of the following does NOT occur? - Cor...
NERC Test Questions with Correct Answers 
 
What percentage of load gives a 1 Hz change in an island condition? - Correct Answer: 6-10% (Think 6-10 day island vacation) 
 
If ACE is Zero but system Hz is off, what should a system operator do? - Correct Answer: Nothing! ACE bias and interchange sched...
Preview 3 out of 22 pages
Add to cartNERC Test Questions with Correct Answers 
 
What percentage of load gives a 1 Hz change in an island condition? - Correct Answer: 6-10% (Think 6-10 day island vacation) 
 
If ACE is Zero but system Hz is off, what should a system operator do? - Correct Answer: Nothing! ACE bias and interchange sched...
NERC Test Questions with Correct Answers 
 
What percentage of load gives a 1 Hz change in an island condition? - Correct Answer: 6-10% (Think 6-10 day island vacation) 
 
If ACE is Zero but system Hz is off, what should a system operator do? - Correct Answer: Nothing! ACE bias and interchange sched...
Preview 2 out of 8 pages
Add to cartNERC Test Questions with Correct Answers 
 
What percentage of load gives a 1 Hz change in an island condition? - Correct Answer: 6-10% (Think 6-10 day island vacation) 
 
If ACE is Zero but system Hz is off, what should a system operator do? - Correct Answer: Nothing! ACE bias and interchange sched...
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Stuvia is a marketplace, so you are not buying this document from us, but from seller Dants. Stuvia facilitates payment to the seller.
No, you only buy these notes for $30.49. You're not tied to anything after your purchase.