Hvac final exam 5 - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Hvac final exam 5? On this page you'll find 70 study documents about Hvac final exam 5.

Page 3 out of 70 results

Sort by

IICRC - Commercial Drying Specialist Exam | Questions & 100% Correct Answers  (Verified) | Latest Update | Grade A+
  • IICRC - Commercial Drying Specialist Exam | Questions & 100% Correct Answers (Verified) | Latest Update | Grade A+

  • Exam (elaborations) • 52 pages • 2024
  • IICRC - Commercial Drying Specialist Exam | Questions & 100% Correct Answers (Verified) | Latest Update | Grade A+ The principles of restoration as described by the S500 on a restoration project are... Correct Answer: 1) Provide for the safety & Health of Workers and Occupants 2) Inspect and Document the Project (initial / ongoing inspection / final inspection) 3) Mitigate further Damage (control the spread of contaminants, control the spread of water) 4) Clean & Dry Affected Areas 5...
    (0)
  • $13.49
  • + learn more
NCCER Module 2 Exam Questions and Answers 100% pass
  • NCCER Module 2 Exam Questions and Answers 100% pass

  • Exam (elaborations) • 23 pages • 2024
  • Available in package deal
  • NCCER Module 2 Exam Questions and Answers 100% pass An estimator is preparing a bid for a home remodeling project. She has determined that the new garage needs 324 feet of 2x10 lumber; the new rec room requires 430 feet; and the new upstairs bonus room needs 283 feet. How many feet of 2x10 lumber will be needed? - Answer- 1,037 feet A plumbing contractor bid the rough-in work for a new three story office building based an estimate of 850 hours of a journey-level plumber's time on the job....
    (0)
  • $12.49
  • + learn more
HVAC 1 Final Exam Review Correct 100%(Graded A+)
  • HVAC 1 Final Exam Review Correct 100%(Graded A+)

  • Exam (elaborations) • 4 pages • 2024
  • HVAC 1 Final Exam Review Correct 100%Spiral wound gaskets are primarily used on - ANSWER high temperature high pressure systems lip type seals are used primarily - ANSWER on rotating shafts The side force applied at right angles to a bearing and shaft such as that applied from a pulley is called a - ANSWER radial load A type of anti-friction bearing is a - ANSWER ball bearing If there is darkened, yet still oily grease present on a failed bearing, a likely cause of failure is - ANSWE...
    (0)
  • $9.99
  • + learn more
HVAC Journeyman's Study Set Exam  Final Questions and Answers
  • HVAC Journeyman's Study Set Exam Final Questions and Answers

  • Exam (elaborations) • 24 pages • 2024
  • Available in package deal
  • HVAC Journeyman's Study Set Exam Final Questions and Answers The maximum horizontal length of a single-wall connector shall be ____ percent of the height of the chimney or vent. - CORRECT ANSWER-75% Grease filters shall be installed at an angle of not less that ____ degrees from the horizontal and shall be equipped with a drip tray beneath the lower edge of the filters - CORRECT ANSWER-45 A device that will automatically shut off the fuel supply to a main burner or group of burners ...
    (0)
  • $16.49
  • + learn more
NCIDQ IDFX Model Exam Questions with Answers Latest 2024-2025 9100% Solved)
  • NCIDQ IDFX Model Exam Questions with Answers Latest 2024-2025 9100% Solved)

  • Exam (elaborations) • 34 pages • 2024
  • NCIDQ IDFX Model Exam Questions with Answers Latest % Solved) An interior designer has determined the required gross occupant area required for a client planning to lease space in an office building. Using the Building Owners and Managers Association (BOMA) standard ANSI/BOMA Z65.1, Office Buildings: Standard Methods of Measurement, which of the following would be used to determine the amount of lease space the client will be paying for? (A) building efficiency ratio (B) building load fact...
    (0)
  • $14.99
  • + learn more
Hvac Journeyman Final Exam Review Practice Test 2024.
  • Hvac Journeyman Final Exam Review Practice Test 2024.

  • Exam (elaborations) • 13 pages • 2024
  • Hvac Journeyman Final Exam Review Practice Test 2024. Defects on gas piping or fittings shall be _____.(A) repaired(B) replaced or repaired and retested(C) repaired by a certified welder(D) ignored, as the operating pressure is much less than the air test. - CORRECT ANSWER B. Fitting shall be replaced or repaired and retested. UMC Section 1316.4.3 Every absorption refrigerating system supported from the ground shall rest on a concrete slab extending not less than _____ the adjoining ground l...
    (0)
  • $10.99
  • + learn more
Mold Remediation Contractor TX State exam, With Complete Solution 2024.
  • Mold Remediation Contractor TX State exam, With Complete Solution 2024.

  • Exam (elaborations) • 13 pages • 2024
  • Mold Remediation Contractor TX State exam, With Complete Solution 2024. Can mold be found anywhere? yes, they can grow on virtually any organic substance (food) What is needed for mold to to grow? moisture and oxygen must be present What is the key to mold control? Moisture control According to the EPA, what is the ideal RH? 30 - 50% (below 60%) If water is detected how quickly should it be cleaned and dried to prevent mold growth? within 48 hours What are the EPA regulations for mold...
    (0)
  • $11.99
  • + learn more
HVAC Journeyman Test Final Exam  Questions with Answers Verified
  • HVAC Journeyman Test Final Exam Questions with Answers Verified

  • Exam (elaborations) • 2 pages • 2024
  • Available in package deal
  • HVAC Journeyman Test Final Exam Questions with Answers Verified Sensible Heat - CORRECT ANSWER-Heat that can be Measured Specific Heat - CORRECT ANSWER-The Amount of Heat Required to Raise 1 LB of a Substance 1*F Latent Heat - CORRECT ANSWER-Heat used to cause change of state. BTU - CORRECT ANSWER-amount of heat required to raise 1LB of water 1*F One Ton of Refrigeration - CORRECT ANSWER-2000 x 144 x 24,288,000 Btu/24hours, and 12,000 Btu/hr A Room Thermostat Should be Mounted - CORR...
    (0)
  • $9.99
  • + learn more
NCCER Module 2 Exam Questions and Answers 100% pass
  • NCCER Module 2 Exam Questions and Answers 100% pass

  • Exam (elaborations) • 23 pages • 2024
  • NCCER Module 2 Exam Questions and Answers 100% pass An estimator is preparing a bid for a home remodeling project. She has determined that the new garage needs 324 feet of 2x10 lumber; the new rec room requires 430 feet; and the new upstairs bonus room needs 283 feet. How many feet of 2x10 lumber will be needed? - Answer- 1,037 feet A plumbing contractor bid the rough-in work for a new three story office building based an estimate of 850 hours of a journey-level plumber's time on the job....
    (0)
  • $12.49
  • + learn more
NCCER Module 2 Exam Questions and Answers 100% pass
  • NCCER Module 2 Exam Questions and Answers 100% pass

  • Exam (elaborations) • 23 pages • 2024
  • NCCER Module 2 Exam Questions and Answers 100% pass An estimator is preparing a bid for a home remodeling project. She has determined that the new garage needs 324 feet of 2x10 lumber; the new rec room requires 430 feet; and the new upstairs bonus room needs 283 feet. How many feet of 2x10 lumber will be needed? - Answer- 1,037 feet A plumbing contractor bid the rough-in work for a new three story office building based an estimate of 850 hours of a journey-level plumber's time on the job....
    (0)
  • $13.49
  • + learn more