Cosc 275 exam 1 - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Cosc 275 exam 1? On this page you'll find 34 study documents about Cosc 275 exam 1.

Page 3 out of 34 results

Sort by

COSC 275 Palmer: Exam 1 Notes 2024
  • COSC 275 Palmer: Exam 1 Notes 2024

  • Exam (elaborations) • 8 pages • 2024
  • COSC 275 Palmer: Exam 1 Notes 2024 Estimating - Correct Answer️️ -The Process of determining the anticipated cost of material, labor and equipment of a proposed project. Take-off - Correct Answer️️ -The process in which detailed lists are compiled, based on drawings and specifications, of all the materials and equipment necessary to construct a project. The cost estimator uses this list to calculate how much it will cost to build the project. Quantities - Correct Answer️️ -Mea...
    (0)
  • $12.49
  • + learn more
COSC 275 Exam 2 Palmer | Questions and Answers | Latest Update | 2024/2025  | Graded A+
  • COSC 275 Exam 2 Palmer | Questions and Answers | Latest Update | 2024/2025 | Graded A+

  • Exam (elaborations) • 15 pages • 2024
  • COSC 275 Exam 2 Palmer | Questions and Answers | Latest Update | 2024/2025 | Graded A+ 1 kg= ___ lbs 2.2046 1 sq M= ___ sq ft 10.764 1"= ___ millimeters 25.40 4 types of envelope construction Tilt Wall Stud with veneer Masonry Glass A 10' W18x48 Beam weighs how much? (in tons) 10x48 = 480 lbs 480/2000 = .24 tons Air Barrier A component of the envelop system that prohibits air leakage into a building and reduces the risk of condensation build up. House wrap and flui...
    (0)
  • $10.01
  • + learn more
COSC 275 Final Exam Palmer | Latest Version | 2024/2025 | Rated A+
  • COSC 275 Final Exam Palmer | Latest Version | 2024/2025 | Rated A+

  • Exam (elaborations) • 18 pages • 2024
  • COSC 275 Final Exam Palmer | Latest Version | 2024/2025 | Rated A+ (Finish x Thickness)/27 CY of Concrete 20/80 rule 80% of time is used for 20% of take-off 30 amps with 2 breakers ex. 30/2 43,560 1 acre of land = ? SF Active soil Soil that swells when it comes in contact with water. Addendum A document describing an addition, change, correction, or modification to contract documents. An addendum is issued by the design professional during the bidding period or prior to the ...
    (0)
  • $10.01
  • + learn more
COSC 275 - Exam 2 | Latest Update |  2024/2025 | Graded A+
  • COSC 275 - Exam 2 | Latest Update | 2024/2025 | Graded A+

  • Exam (elaborations) • 12 pages • 2024
  • COSC 275 - Exam 2 | Latest Update | 2024/2025 | Graded A+ Metal joist weight is given by ____, _____ does not give weight Manufacturer, Designation Metal Decking Metal decking is used for ___ and ___ applications Floor and Roof What 3 things can Metal decking have installed on top of it? (1) Concrete poured , (2) Insulation, (3) Built up roofing Metal decking is taken off by ____ or ____ Square foot or Square One square of roofing is how many square feet? 100 square feet Est...
    (0)
  • $10.01
  • + learn more
COSC 275 Final Exam Palmer Questions and Answers 100% Pass
  • COSC 275 Final Exam Palmer Questions and Answers 100% Pass

  • Exam (elaborations) • 11 pages • 2024
  • Available in package deal
  • COSC 275 Final Exam Palmer Questions and Answers 100% Pass Estimating - Correct Answer️️ -The process of determining the anticipated cost of materials, labor, and equipment of a proposed project. Take-off - Correct Answer️️ -The process in which detailed lists are compiled, based on drawings and specifications, of all the material and equipment necessary to construct a project. The cost estimator uses this list to calculate how much it will cost to build the project. Quantities -...
    (0)
  • $12.49
  • + learn more
COSC 275 Exam 2 Palmer Study Guide with Complete Solutions
  • COSC 275 Exam 2 Palmer Study Guide with Complete Solutions

  • Exam (elaborations) • 7 pages • 2024
  • Available in package deal
  • COSC 275 Exam 2 Palmer Study Guide with Complete Solutions Measures - Answer️️ -1" = 25.40 milimeters 1 sq. M(m^2) = 10.764 sq. ft or = 1.196 sq. yd. 1 kg = 2.2046 lbs Geometric Formula: Circle - Answer️️ -Circumference =2r*pi Area = pi*r^2 Geometric Formula: Triangle - Answer️️ -Area: B*1/2H Masterformat 2004: 00 - Answer️️ -Procurement and Contracting Requirements Masterformat 2004: 01 - Answer️️ -General Requirements Masterformat 2004: 02 - Answer️️ -Ex...
    (0)
  • $9.99
  • + learn more
COSC 275 Exam 2 Palmer | Latest Update | 2024/2025 | Already Passed
  • COSC 275 Exam 2 Palmer | Latest Update | 2024/2025 | Already Passed

  • Exam (elaborations) • 9 pages • 2024
  • COSC 275 Exam 2 Palmer | Latest Update | 2024/2025 | Already Passed Air Barrier A component of the envelop system that prohibits air leakage into a building and reduces the risk of condensation build up. House wrap and fluid applied barriers are examples. Anchor Bolt A threaded bolt, usually embeded in a foundation, for sealing a sill, framework, or machinery Beam A structural member that primarily resists loads applied laterally to the axis Bond Breaker A material used to prevent...
    (0)
  • $10.01
  • + learn more
COSC 275 Workman Final Exam With Complete Solution
  • COSC 275 Workman Final Exam With Complete Solution

  • Exam (elaborations) • 11 pages • 2024
  • Available in package deal
  • COSC 275 Workman Final Exam With Complete Solution...
    (0)
  • $10.99
  • + learn more
COSC 275 Final Exam Palmer Study Guide with Complete Solutions
  • COSC 275 Final Exam Palmer Study Guide with Complete Solutions

  • Exam (elaborations) • 14 pages • 2024
  • Available in package deal
    (0)
  • $9.99
  • + learn more
COSC 275 Exam 2 Palmer Questions and Answers 100% Pass
  • COSC 275 Exam 2 Palmer Questions and Answers 100% Pass

  • Exam (elaborations) • 6 pages • 2024
  • COSC 275 Exam 2 Palmer Questions and Answers 100% Pass Measures - Correct Answer️️ -1" = 25.40 milimeters 1 sq. M(m^2) = 10.764 sq. ft or = 1.196 sq. yd. 1 kg = 2.2046 lbs Geometric Formula: Circle - Correct Answer️️ -Circumference =2r*pi Area = pi*r^2 Geometric Formula: Triangle - Correct Answer️️ -Area: B*1/2H Masterformat 2004: 00 - Correct Answer️️ -Procurement and Contracting Requirements Masterformat 2004: 01 - Correct Answer️️ -General Requirements Maste...
    (0)
  • $11.49
  • + learn more