COSC 275 Final Exam Palmer Study
Guide with Complete Solutions
Estimating - Answer️️ -The process of determining the anticipated cost of
materials, labor, and equipment of a proposed project.
Take-off - Answer️️ -The process in which detailed lists are compiled,
based on drawings and s...
COSC 275 Final Exam Palmer Study
Guide with Complete Solutions
Estimating - Answer✔️✔️-The process of determining the anticipated cost of
materials, labor, and equipment of a proposed project.
Take-off - Answer✔️✔️-The process in which detailed lists are compiled,
based on drawings and specifications, of all the material and equipment
necessary to construct a project. The cost estimator uses this list to calculate
how much it will cost to build the project.
Quantities - Answer✔️✔️-Measured amounts of construction items
expressed in their customary units.
Quantification - Answer✔️✔️-In estimating an activity to translate project
scope information into resource quantities suitable for
Quantity survey - Answer✔️✔️-A detailed analysis of material and
equipment required to construct a project.
Area - Answer✔️✔️-A measurement of a given planar region or of the
surface of a solid.
Area method - Answer✔️✔️-A construction cost estimating system
employing unit square foot costs multiplied by the adjusted gross floor
area of a building.
Length - Answer✔️✔️-The longest dimension of an object.
Linear measurement - Answer✔️✔️-A unit or system of units for measuring
length: 12" = 1', 3' = 1 yard, 1 yard = 0.9144 meters, 1 mile
= 5,280 feet.
Dimension - Answer✔️✔️-A distance between two points, lines, or planes.
Specifications - Answer✔️✔️-Documents that define the qualitative
requirements for products, materials, and workmanship upon which the
contract for construction is based.
Drawings - Answer✔️✔️-Graphic illustrations depicting the dimensions,
design, and location of a project. Generally including plans, elevations,
details, diagrams, schedules, and sections.
Addendum - Answer✔️✔️-A document describing an addition, change,
correction, or modification to contract documents. An addendum is issued
by the design professional during the bidding period or prior to the award
of contract, and is the primary method of informing bidders of
modifications to the work during the bidding process. Addenda become
part of the contract documents.
2
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller SophiaBennett. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $9.99. You're not tied to anything after your purchase.