Concr - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Concr? On this page you'll find 2071 study documents about Concr.
Page 3 out of 2.071 results
Sort by
-
ACI Certification - Concrete Field Testing Technician - Grade 1 - Test Sample Written Exam Questions - CP-1(17) with 100% Correct Answers
- Exam (elaborations) • 3 pages • 2024
- Available in package deal
-
- $10.49
- 1x sold
- + learn more
ACI Certification - Concrete Field Testing 
Technician - Grade 1 - Test Sample Written 
Exam Questions - CP-1(17) with 100% 
Correct Answers 
The Method of determining air content of concrete containing lightweight aggregate is 
the pressure method. True or False? - Answer- False 
When making a test cylinder from concrete being used in construction, the field 
technician must also measure the slump of the concrete. True or False? - Answer- True 
While the technician is checking the slump of the ...
-
ACI Concrete Bundled Exams with Complete Solution | Verified | Guaranteed Success
- Package deal • 8 items • 2023
-
- $38.49
- 1x sold
- + learn more
ACI Concrete Bundled Exams with Complete Solution | Verified | Guaranteed Success
-
Concrete Batch Plant Operator Exam (FDOT) Questions And Answers 2023
- Exam (elaborations) • 4 pages • 2023
-
Available in package deal
-
- $11.49
- 1x sold
- + learn more
Concrete Batch Plant Operator Exam (FDOT) Questions And Answers 2023 
 
Concrete Batch Plant Operator Exam (FDOT) Questions And Answers 2023
-
2024 ACI CONCRETE TRANSPORTATION CONSTRUCTION INSPECTOR STANDARDS TEST EXAM
- Exam (elaborations) • 2 pages • 2024
-
- $11.49
- 1x sold
- + learn more
2024 ACI CONCRETE TRANSPORTATION 
CONSTRUCTION INSPECTOR STANDARDS TEST 
EXAM
-
CONCRETE BATCH PLANT OPERATOR EXAM (FDOT) | QUESTIONS & ANSWERS (VERIFIED) | LATEST UPDATE | GRADED A+
- Exam (elaborations) • 8 pages • 2024
-
- $11.49
- 1x sold
- + learn more
1 
CONCRETE BATCH PLANT OPERATOR 
EXAM (FDOT) | QUESTIONS & 
ANSWERS (VERIFIED) | LATEST 
UPDATE | GRADED A+ 
Stockpiles of aggregate shall be maintained in a well-drained condition in order to: 
Correct Answer: Minimize Free Water Content 
Coarse aggregate stockpiles must be sprinkled for at lest how many hours prior to batch 
for FDOT? 
Correct Answer: 24 
Free moisture of the aggregate means: 
Correct Answer: Moister on the surface of an aggregate that is above and beyond 
the absorbed m...
As you read this, a fellow student has made another $4.70
-
Concrete Batch Plant Operator EXAM 2024-2025 QUESTIONS AND ANSWERS 100 % PASS SOLUTION A+ GRADE
- Exam (elaborations) • 6 pages • 2024
-
- $10.99
- 1x sold
- + learn more
Concrete Batch Plant Operator EXAM QUESTIONS AND ANSWERS 100 % PASS SOLUTION A+ GRADE
-
CSLB Concrete C8 License Practice Test | 100% correct answers with explanation
- Exam (elaborations) • 9 pages • 2022
- Available in package deal
-
- $7.49
- 5x sold
- + learn more
The maximum size of the conduit or pipe shall NOT exceed _______ of the thickness of the concrete. - Answer - 1/3 Which of the following tests for concrete is conducted at the site/field? - Answer - Color Test Explanation: Rest of the above are laboratory tests. If the concrete compressive strength specified is less than 3600 psi, it has the option of being tested at 28 days and is able to accept the concrete if it attains ___________ percentage of the minimum required strength. - Answer - 85...
-
CSLB Concrete C8 License Practice Test #2 Already Passed
- Exam (elaborations) • 21 pages • 2023
-
Available in package deal
-
- $9.49
- 1x sold
- + learn more
CSLB Concrete C8 License Practice Test #2 Already Passed 
The maximum size of the conduit or pipe shall NOT exceed _______ of the thickness of the concrete. 1/3 
Which of the following tests for concrete is conducted at the site/field? Color Test 
Explanation: Rest of the above are laboratory tests. 
If the concrete compressive strength specified is less than 3600 psi, it has the option of being tested at 28 days and is able to accept the concrete if it attains ___________ percentage of the mini...
-
Concrete Bundled Exams with complete solution
- Package deal • 6 items • 2023
-
- $30.49
- 1x sold
- + learn more
CSM Test 4 Steel and Concrete Exam 2023 with complete solution
Concrete Exam 1 Latest 2023 with complete solution
CONCRETE TEST ALL POSSIBLE QUESTIONS AND ANSWERS 2023 WITH COMPLETE SOLUTION
Tilt-Up Concrete Test new update 2023 answered 100%
Concrete Test 2023 Questions and Answers with complete solution
-
ACI- CONCRETE FIELD-TESTING TECHNICIAN - GRADE 1
- Exam (elaborations) • 29 pages • 2024
-
- $12.99
- + learn more
Q1. Start molding specimens for strength tests within 30 minutes after fabricating the composite sample. 
 
A. True 
B. False - Answer-B. False 
 
 ASTM C172 -Para (4.1.2) - Start molding. 
specimens for strength tests within 15 min after fabricating the 
composite sample. 
 
Q2. The maximum allowable time between obtaining the first and last portions of the composite sample may not exceed 5 minutes. 
 
A. True 
B. False - Answer-B. False 
 
ASTM C172 - Para (4.1)- The elapsed time shall not e...
How did he do that? By selling his study resources on Stuvia. Try it yourself! Discover all about earning on Stuvia