Cmgt 410 - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Cmgt 410? On this page you'll find 64 study documents about Cmgt 410.
Page 3 out of 64 results
Sort by
-
CMGT 410 Midterm #2 100% Correct!!
- Exam (elaborations) • 2 pages • 2024
-
- $10.99
- + learn more
Soldier Pile Walls are very strong and so they never require tiebacks - ANSWERFalse 
 
Soil nails are typically mechanically tensioned. - ANSWERFalse 
 
Helical, or mechanical, tieback anchors are usually the most economical retaining wall tieback. - ANSWERFalse 
 
Ground freezing is an effective way of cutting off water. - ANSWERTrue 
 
Triple fluid jet grouting systems use air and water to erode the soil and yield a higher quality of soil-cement mix. - ANSWERTrue 
 
Thru-point / tie-point conn...
-
CMGT 4100 Final Exam Questions and Answers 100% Verified
- Exam (elaborations) • 1 pages • 2024
-
- $12.49
- + learn more
CMGT 4100 Final Exam Questions and 
Answers 100% Verified 
advantages of bar charts ( - CORRECT ANSWER-simple to prepare) (simple to read) 
•	Crert how many durations - CORRECT ANSWER-one
-
CMGT 410: Project Planning and Implementation Post Test | 105 Questions with 100% Correct Answers | Verified | Latest Update 2024
- Exam (elaborations) • 12 pages • 2023
-
- $14.49
- + learn more
Which of the following is not a part of active listening? - Thinking about what you are going to do or 
say next 
All of the following are examples of special causes, except for which one? - Measurement errors 
Is Scrum an Agile methodology? - No. Scrum is a framework. 
When the customer is thinking and explaining something one way and the team takes it in a different 
way. This is referred to as which of the following? - The gulf of misunderstanding 
Which of the following are parts of the 13 c...
-
CMGT 410 - WEEK 5 - Apply: Post-Test EXAM 100+ QUESTIONS AND COMPLETE SOLUTIONS 2023.
- Exam (elaborations) • 41 pages • 2024
-
- $12.00
- + learn more
CMGT 410 - WEEK 5 - Apply: Post-Test EXAM 100+ QUESTIONS AND COMPLETE SOLUTIONS 2023. CMGT 410 - Wk 5 - Apply: Post-Test 1. All of the following are included in an Agile project charter, except for which one? a) Detailed project scope b) Expected ROI c) Signature and date d) Project goals and objectives: a) Detailed project scope 2. Agile team members have identified a risk in a project and are not able to resolve it due to lack of expertise. You, as a Agile project manager, decided to contract ...
-
CMGT 410 Exams Questions & Answers 100% Correct!!
- Exam (elaborations) • 2 pages • 2024
-
- $10.99
- + learn more
Scrum - ANSWERA framework within which people can address complex adaptive problems, while productively and creatively delivering products of the highest possible value. 
 
Agile - ANSWERThe ability to adapt and change directions as needed. 
 
Self-organization model - ANSWERA model that optimizes the flexibility of decision making and the courage to be creative 
 
Product Owner - ANSWERA Scrum team member whose main job is to maximize the value of the product and the value of the work of the de...
Too much month left at the end of the money?
-
CMGT 4100 Test 1 Questions & Answers(RATED A+)
- Exam (elaborations) • 4 pages • 2024
-
- $11.99
- + learn more
What info is addressed in the planning and scheduling process? - ANSWER-Planning- "what" is going to be done, "how", "where", and by "whom" 
-Scheduling- determining time needed to complete a project 
 
Who developed the bar chart - ANSWERHenry Gantt 
 
Is A-O-A (or ADM) a version of CPM scheduling? - ANSWERYes 
 
What is the difference in determinist and probabilistic durations? Which does A-O-A use? Which does PERT use? - ANSWER-Deterministic schedules - specific durations dates, and t...
-
CMGT 4100- Test 1 - Ch: 1,2,3,4,5 Questions & Answers 100% Correct
- Exam (elaborations) • 11 pages • 2024
- Available in package deal
-
- $14.99
- + learn more
What is a project? - ANSWERA temporary endeavor undertaken to create a unique product, service, or result 
 
Every project has: - ANSWER- A start and finish point 
 
-A deliverable 
 
Project Planning: - ANSWERthe process of choosing the one method and order of work to be adopted for a project from all the various ways and sequences in which it could be done." 
 
Project planning elements include: - ANSWERscope, design and alternate designs, cost, time, finance, land, procurement, operations, e...
-
CMGT 410: Temp Structures Mid Term Questions & Answers 100% Correct!!
- Exam (elaborations) • 3 pages • 2024
-
- $10.99
- + learn more
True - ANSWERTemporary structures are generally considered means and methods and so the engineer of record is almost always responsible for the design of the temporary structure. 
 
True - ANSWERIf Federal OSHA regulations and State OSHA regulations are inconsistent with each other, you can choose to follow whichever one is most convenient for your project. 
 
False - ANSWERAll parts of a temporary structure must be removed at the end of a project. 
 
True - ANSWERWhen it comes to installing tem...
-
CMGT 410 - WEEK 5 - Apply: Post-Test EXAM 100+
- Exam (elaborations) • 38 pages • 2024
-
- $13.00
- + learn more
CMGT 410 - WEEK 5 - Apply: Post-Test EXAM 100+
-
CMGT 4100 Final Exam Correct 100%(RATED A+)
- Exam (elaborations) • 1 pages • 2024
- Available in package deal
-
- $14.49
- + learn more
CMGT 4100 Final Exam Correct 100%(RATED A+)CMGT 4100 Final Exam Correct 100%(RATED A+)CMGT 4100 Final Exam Correct 100%(RATED A+)CMGT 4100 Final Exam Correct 100%(RATED A+)CMGT 4100 Final Exam Correct 100%(RATED A+)CMGT 4100 Final Exam Correct 100%(RATED A+)CMGT 4100 Final Exam Correct 100%(RATED A+)CMGT 4100 Final Exam Correct 100%(RATED A+)
$6.50 for your textbook summary multiplied by 100 fellow students... Do the math: that's a lot of money! Don't be a thief of your own wallet and start uploading yours now. Discover all about earning on Stuvia