Api 1169 study test - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Api 1169 study test? On this page you'll find 55 study documents about Api 1169 study test.
Page 3 out of 55 results
Sort by
-
API 1169 Study Test Questions Test RM 3 Latest Update Graded A+
- Exam (elaborations) • 25 pages • 2024
-
- $14.99
- + learn more
One main category variable of pressure test planning that an operator must consider is the 
_________________. purpose 
Field beveling of pipe ends by manual oxygen cutting is acceptable if authorized by the 
company. True 
Location of casings cathode protection external anodes, and utility crossings should all be 
recorded on the. as-built drawings 
Releasing air or water pressure through valves, at a test head, after the testing of a pipe is called 
a____________. blow down
-
API 1169 Study Test Questions Test RM#1 Correct 100%
- Exam (elaborations) • 14 pages • 2023
-
- $10.99
- + learn more
According to FERC, environmental Inspectors shall have _____________ status in regards to all other craft inspectors. - Answer Equal 
 
According to Title 49 CFR 195, any new pipe with a diameter greater than ___________ inches must be marked with the specification, the SMYS/Grade, and pipe size. - Answer 4.5 
 
This legislation covers hazardous substance, site contamination, and cleanup - Answer Comprehensive environmental recovery, compensation, and liability act. 
 
A blueprint showing the ex...
-
API 1169 Study Test Questions Test RM 2 Already Passed
- Exam (elaborations) • 16 pages • 2024
-
- $7.99
- + learn more
According to OSHA a "protective system" is defined as: Method of protecting employees 
from cave-ins. 
Design and development inputs shall be identified and reviewed for? Accuracy, 
completeness and lack of conflict 
The Excavator calls the One Call Center prior to excavation at least Two working days nor 
more than ten working days
-
API 1169 Study test questions test RM#3 Questions & Answers| Passed
- Exam (elaborations) • 16 pages • 2024
-
- $12.49
- + learn more
According to Title 49, CFR 195, Subpart E: Carbon dioxide pipelines may use inert gas or carbon dioxide 
as the test medium if the maximum hoop stress during the test does not exceed________________ 
percent of specified minimum yield strength and other conditions are met. - 80% 
CFR 195.559 states that coating material for external corrosion control (under CFR 195.557) 
must__________________? - Have enough strength to resist damage due to handling and soil 
stress & have sufficient adhesion to...
-
API 1169. study test questions test
- Exam (elaborations) • 13 pages • 2024
-
- $10.99
- + learn more
API 1169. study test questions test RM#1 
According to FERC, environmental Inspectors shall have _____________ status in regards to all other craft inspectors. 
Equal 
 
 
According to Title 49 CFR 195, any new pipe with a diameter greater than ___________ inches must be marked with the specification, the SMYS/Grade, and pipe size. 
4.5 
 
 
This legislation covers hazardous substance, site contamination, and cleanup 
Comprehensive environmental recovery, compensation, and liability act. 
 
 
A ...
Too much month left at the end of the money?
-
API 1169 Study Guide (Part 1) With Correct Answers
- Exam (elaborations) • 9 pages • 2024
-
- $12.04
- + learn more
API 1169 Study Guide (Part 1) With Correct Answers. 
API 1110, Section 3.4 
 
A deadweight tester or an equivalent pressure sensing device should have a certificate of calibration that is not more than One year old at the start of testing or calibrated in accordance with the manufacturers recommendations. 
 
One year old 
 
 
 
API 1110, Section 3.6 
 
Before pressure testing begins, a Pressure Test Procedure with explanatory notes and data should be prepared. 
 
Pressure Test Procedure 
 
 
 
A...
-
API 1169. study test questions test RM#1
- Exam (elaborations) • 13 pages • 2024
-
- $10.49
- + learn more
API 1169. study test questions test RM#1 
According to FERC, environmental Inspectors shall have _____________ status in regards to all other craft inspectors. 
Equal 
 
 
According to Title 49 CFR 195, any new pipe with a diameter greater than ___________ inches must be marked with the specification, the SMYS/Grade, and pipe size. 
4.5 
 
 
This legislation covers hazardous substance, site contamination, and cleanup 
Comprehensive environmental recovery, compensation, and liability act. 
 
 
A ...
-
API 1169 (API 1169 terms and study questions)
- Exam (elaborations) • 11 pages • 2024
-
- $11.09
- + learn more
API 1169 (API 1169 terms and study questions) 
Which of the following equipment may NOT be required for a pressure test? 
internal line clamps 
 
 
before testing begins, a ________ with explanatory notes and data should be prepared 
pressure test procedure 
 
 
the pressure testing of newly constructed liquid pipelines and replaced segments of existing pipelinesshould be performed in accordance with 
ASME B31.4, 49 Code of Federal Regulations, Part 195 and any other applicable governmental 
re...
-
API 1169. Study test questions test
- Exam (elaborations) • 8 pages • 2024
-
- $10.99
- + learn more
API 1169. Study test questions test RM#2 
According to OSHA a "protective system" is defined as: 
Method of protecting employees from cave-ins. 
 
 
Design and development inputs shall be identified and reviewed for? 
Accuracy, completeness and lack of conflict 
 
 
The Excavator calls the One Call Center prior to excavation at least 
Two working days nor more than ten working days 
 
 
Encroachment Area is the area where the ground disturbance occurs within: 
50 feet of the centerline of the...
-
Api 1169. Study Test Questions Rm#1 With Verified Solution 2024
- Exam (elaborations) • 11 pages • 2024
-
- $11.49
- + learn more
Api 1169. Study Test Questions Rm#1 With Verified Solution 2024
$6.50 for your textbook summary multiplied by 100 fellow students... Do the math: that's a lot of money! Don't be a thief of your own wallet and start uploading yours now. Discover all about earning on Stuvia