Nerc time limits - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Nerc time limits? On this page you'll find 80 study documents about Nerc time limits.
Page 2 out of 80 results
Sort by
-
NERC PREP TEST 101 Questions With Correct Answers
- Exam (elaborations) • 57 pages • 2024
- Available in package deal
-
- $13.49
- + learn more
1. If a 500 kV transmission line with a surge impedance loading of 800 MW is currently loaded at 1400 MW, which of the following events would most likely occur? 
 
a. Generator MVAR output would increase 
b. All system capacitors would trip off-line 
c. Generator MVAR output would decrease 
d. All automatic reactors would connect to the system - Answer a. Generator MVAR output would increase 
 
2. When system conditions are such that emergency procedures are expected to be implemented, which of ...
-
PJM Generation Dispatcher Exam Practice Questions with Verified Answers
- Exam (elaborations) • 10 pages • 2024
- Available in package deal
-
- $9.99
- + learn more
PJM Generation Dispatcher Exam 
Practice Questions with Verified 
 
Answers 
 
An EXCITER on a traditional generator does what? Voltage regulation (AVR) if you change 
the excitation current, you change the voltage. 
 
ECO Min, ECO Max, and EMERG Max are genrator _________________. Limits 
 
When synchronizing to the interconnection, what needs to be synchronized? Frequency, 
Voltage, and phase angle. 
 
GMD (GeoMagnetic Disturbance) procedure is implemented when? 10A or greater is 
measured by ...
-
NERC Certification Exam | Actual questions and answers 2023/24
- Exam (elaborations) • 15 pages • 2023
- Available in package deal
-
- $9.99
- + learn more
NERC Certification Exam | Actual questions and answers 2023/24 
 
True/False 
 
According to the NERC Functional Model, there is no difference between the function and the entity. 
 
A) True 
B) False - B) False 
True/False 
 
Analysis type questions are designed to be the least complex from a human cognitive process. 
 
A) True 
B) False - B) False 
True/False 
 
A Transmission Service Provider is an entity that both owns and operates transmission facilities on the Bulk Electric System. 
 
A)...
-
NERC PREP TEST 101 QUESTIONS AND ANSWERS (100% CORRECT SOLUTIONS)
- Exam (elaborations) • 73 pages • 2023
-
Available in package deal
-
- $11.49
- + learn more
1. If a 500 kV transmission line with a surge impedance loading of 800 MW is currently loaded at 1400 MW, which of the following events would most likely occur? 
 
a. Generator MVAR output would increase 
b. All system capacitors would trip off-line 
c. Generator MVAR output would decrease 
d. All automatic reactors would connect to the system 
a. Generator MVAR output would increase 
 
 
2. When system conditions are such that emergency procedures are expected to be implemented, which of the fo...
-
NERC Certification Exam | latest 2023/24 with full solution
- Exam (elaborations) • 15 pages • 2023
-
- $9.99
- + learn more
NERC Certification Exam | latest 2023/24 with full solution 
 
True/False 
 
According to the NERC Functional Model, there is no difference between the function and the entity. 
 
A) True 
B) False - B) False 
True/False 
 
Analysis type questions are designed to be the least complex from a human cognitive process. 
 
A) True 
B) False - B) False 
True/False 
 
A Transmission Service Provider is an entity that both owns and operates transmission facilities on the Bulk Electric System. 
 
A) Tr...
Fear of missing out? Then don’t!
-
PJM Test Questions - Answered (Complete Solutions)
- Exam (elaborations) • 22 pages • 2024
- Available in package deal
-
- $23.99
- + learn more
PJM Test Questions - Answered (Complete Solutions) Which of the following statements are true concerning delays in restoring power to offline generation? a. the unit could suffer turbine shaft damage b. fuel oil for the unit could congeal c. startup time for the unit will be reduced d. the battery life used to maintain critical systems may run out During system restoration, you re-energize a fairly long distribution load circuit that has been off for several hours and notice that the loading i...
-
NERC book quiz Questions and Answers (100% Correct Elaborations)
- Exam (elaborations) • 29 pages • 2023
-
Available in package deal
-
- $10.49
- + learn more
You are an external BA with a frequency bais of 20 MW/.1 Hz that sees a frequency of 60.02 due to a large loss of load in the contingent BA. If your generator governor control systems responded to the frequency deviation approximately how much of a generation change would you BA experience? 
-4MW 
 
 
Net actual interchange minus Net scheduled interchange is what? 
Inadvertent interchange 
 
 
Suppose your interconnection operators at 59.97 Hz from one minute after midnight to noon and operate a...
-
NERC Standards| 120 questions| with complete solutions
- Exam (elaborations) • 15 pages • 2024
- Available in package deal
-
- $10.49
- + learn more
NERC Standards| 120 questions| with complete solutions 
How Many Active Standards are in BAL (Resource and Demand Balancing) Answer-There are 8 Active Standards Listed Below: 
BAL-001-2 Real Power Balancing Control Performance Related Information Subject to Enforcement 
BAL-001-TRE-1 Primary Frequency Response in the ERCOT Region Related Information Subject to Enforcement 
BAL-002-3 Disturbance Control Standard - Contingency Reserve for Recovery from a Balancing Contingency Event Subject to Enfo...
-
NERC Practice Test Questions With Verified Answers
- Exam (elaborations) • 24 pages • 2024
- Available in package deal
-
- $12.99
- + learn more
A transmission line is operating with a voltage phase angle different of 30 degrees between the sending Vs and the receiving bus Vr. If the receiving end load is suddenly increased, the voltage phase angle difference will be? - Answer The phase angle will increase. When load is increased phase angle will increase. 
 
A load has a power factor of 0.9 lagging. If the load draws 100 MVA, what is the MW draw? - Answer 90 pf= mw/mva 
 
The high side of a delta-wye connection transformer is connected ...
-
NERC Practice Text Questions And Answers 100% Verified.
- Exam (elaborations) • 19 pages • 2024
-
- $12.49
- + learn more
NERC Practice Text Questions And Answers 100% Verified. 
 
 
 
A transmission line is operating with a voltage phase angle different of 30 degrees between the sending Vs and the receiving bus Vr. If the receiving end load is suddenly increased, the voltage phase angle difference will be? - correct answer.The phase angle will increase. When load is increased phase angle will increase. 
 
A load has a power factor of 0.9 lagging. If the load draws 100 MVA, what is the MW draw? - correct answer.9...
Do you wonder why so many students wear nice clothes, have money to spare and enjoy tons of free time? Well, they sell on Stuvia! Imagine your study notes being downloaded a dozen times for $15 each. Every. Single. Day. Discover all about earning on Stuvia