Nerc rc exam actual exam - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Nerc rc exam actual exam? On this page you'll find 21 study documents about Nerc rc exam actual exam.
Page 2 out of 21 results
Sort by
-
SOS NERC RELIABILITY EXAM QUESTIONS WITH ANSWERS LATEST 2023-2024
- Exam (elaborations) • 69 pages • 2023
- Available in package deal
-
- $16.49
- + learn more
Metered Data included in the calculation of ACE are: dynamic schedules, pseudo 
ties, actual frequency, and all __________. 
A) Tie lines readings 
B) Generators output 
C) Scheduled frequency indications 
SOS NERC RELIABILITY EXAM QUESTIONS & 
ANSWERS LATEST GRADED A+ 
D) Transformer load - A) Tie lines readings 
Balancing Authority A is currently reading a system frequency of 60.00 Hz. Its Net 
Actual Interchange is +100 MW and its Net Scheduled Interchange is +200 MW. If 
Balancing Authority...
-
NERC PREP Exam Questions and Answers Latest Updated 2024/2025 | 100% Correct
- Exam (elaborations) • 54 pages • 2024
-
Available in package deal
-
- $16.49
- + learn more
If a 500 kV transmission line with a surge impedance loading of 800 MW is 
currently loaded at 1400 MW, which of the following events would most likely 
occur? 
a. Generator MVAR output would increase 
b. All system capacitors would trip off-line 
c. Generator MVAR output would decrease 
d. All automatic reactors would connect to the system - a. Generator MVAR output 
would increase 
2. When system conditions are such that emergency procedures are expected to be 
implemented, which of the follow...
-
NERC RELIABILITY EXAM QUESTIONS WITH ANSWERS LATEST 2023-2024 SCORE A+
- Exam (elaborations) • 69 pages • 2023
- Available in package deal
-
- $14.99
- + learn more
NERC RELIABILITY EXAM QUESTIONS WITH ANSWERS LATEST SCORE A+. Metered Data included in the calculation of ACE are: dynamic schedules, pseudo 
ties, actual frequency, and all __________. 
A) Tie lines readings 
B) Generators output 
C) Scheduled frequency indications 
SOS NERC RELIABILITY EXAM QUESTIONS & 
ANSWERS LATEST GRADED A+ 
D) Transformer load - A) Tie lines readings 
Balancing Authority A is currently reading a system frequency of 60.00 Hz. Its Net 
Actual Interchange is +100 MW and it...
-
NERC RELIABILITY EXAM QUESTIONS WITH CORRECT ANSWERS LATEST UPDATED 2024 (GRADED A+)
- Exam (elaborations) • 69 pages • 2024
-
- $17.49
- + learn more
NERC RELIABILITY EXAM QUESTIONS WITH CORRECT ANSWERS LATEST UPDATED 2024 (GRADED A+) The Reliability Coordinator just informed you of a slow time error correction 
which will begin at the top of the next hour. Your EMS system will not let you 
change your scheduled frequency. Your Frequency Bias Setting is -100 MW/.1Hz. 
What action should you take? 
A) Increase Net Interchange Schedule by 20 MWs. 
B) Inform the Reliability Coordinator that you cannot participate in the time error 
correction. 
...
-
NERC RC Exam Questions and Answers 100% Pass | Graded A+ | Latest Update
- Exam (elaborations) • 25 pages • 2024
-
- $10.49
- + learn more
NERC RC Exam Questions and Answers 
100% Pass | Graded A+ | Latest Update 
What is ACE? - (NIa - NIs) - 10β(fa - fs) - Ime 
Calculated every 6 seconds 
Uses Tie line Frequency Bias 
What is Tie line deviation? - Largest offset to ACE 
What is NIA? - Net Interchange Actual (sum of all tie-line values) 
What is NIS? - Net Interchange Scheduled (sum of all interchange 
schedules) 
What is the multiplier for frequency bias? - 10 
What is β? - Frequency bias - represented as negative number in ACE ...
Fear of missing out? Then don’t!
-
SOS NERC RELIABILITY EXAM QUESTIONS & ANSWERS LATEST 2023-2024 GRADED A+
- Exam (elaborations) • 69 pages • 2023
-
Available in package deal
-
- $15.49
- + learn more
SOS NERC RELIABILITY EXAM QUESTIONS & ANSWERS LATEST GRADED A+. The Reliability Coordinator just informed you of a slow time error correction 
which will begin at the top of the next hour. Your EMS system will not let you 
change your scheduled frequency. Your Frequency Bias Setting is -100 MW/.1Hz. 
What action should you take? 
A) Increase Net Interchange Schedule by 20 MWs. 
B) Inform the Reliability Coordinator that you cannot participate in the time error 
correction. 
C) Decrease Net Inte...
-
SOS NERC Prep - Reliability Exam questions with complete solution 2023
- Exam (elaborations) • 54 pages • 2023
- Available in package deal
-
- $30.49
- + learn more
SOS NERC Prep - Reliability Exam questions with complete solution 2023The Reliability Coordinator just informed you of a slow time error correction which will begin at the top of the next hour. Your EMS system will not let you change your scheduled frequency. Your Frequency Bias Setting is -100 MW/.1Hz. What action should you take? 
 
A) Increase Net Interchange Schedule by 20 MWs. 
 
B) Inform the Reliability Coordinator that you cannot participate in the time error correction. 
 
C) Decrease N...
-
NERC RC Exam Questions With Correct Answers
- Exam (elaborations) • 14 pages • 2024
-
- $12.49
- + learn more
NERC RC Exam Questions With Correct 
Answers 
What is ACE? - answer(NIa - NIs) - 10β(fa - fs) - Ime 
Calculated every 6 seconds 
Uses Tie line Frequency Bias 
What is Tie line deviation? - answerLargest offset to ACE 
What is NIA? - answerNet Interchange Actual (sum of all tie-line values) 
What is NIS? - answerNet Interchange Scheduled (sum of all interchange schedules) 
What is the multiplier for frequency bias? - answer10 
What is β? - answerFrequency bias - represented as negative number i...
-
NERC Test Exam Questions And 100% Correct Answers
- Exam (elaborations) • 17 pages • 2024
-
Available in package deal
-
- $11.49
- + learn more
NERC Test Exam Questions And 100% Correct Answers 
What percentage of load gives a 1 Hz change in an island condition? - Correct Answer 6-10% (Think 6-10 day island vacation) 
 
If ACE is Zero but system Hz is off, what should a system operator do? - Correct Answer Nothing! ACE bias and interchange schedule will improve frequency 
 
If ACE is Zero, why not adjust generation to help frequency? - Correct Answer Could overload equipment, this is a NERC violation 
 
When restoring from blackout ...
-
nal Assessment Nerc Exam 100% Correct Answers
- Exam (elaborations) • 54 pages • 2024
-
Available in package deal
-
- $11.49
- + learn more
Final Assessment Nerc Exam 100% Correct Answers 
When using a dynamic schedule and the energy profile in an hour is >250 MW and the actual hourly integration deviates from the hourly energy profile by ____ the tag must be modified. 
A. 100 MW 
B. 10% 
C. 50 MW 
D. 25% - Correct Answer B. 10% 
 
Dry steam plants, flash steam plants, and binary cycle power plants are the three main types of what kind of generating plant? 
A. Nuclear generators 
B. Combustion turbine generators 
C. Geothermal ...
Do you wonder why so many students wear nice clothes, have money to spare and enjoy tons of free time? Well, they sell on Stuvia! Imagine your study notes being downloaded a dozen times for $15 each. Every. Single. Day. Discover all about earning on Stuvia