Aci final exam - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Aci final exam? On this page you'll find 223 study documents about Aci final exam.

Page 2 out of 223 results

Sort by

Reinforced Concrete Design Final Exam 2024 Questions and Answers (Graded A)
  • Reinforced Concrete Design Final Exam 2024 Questions and Answers (Graded A)

  • Exam (elaborations) • 8 pages • 2024
  • Reinforced Concrete Design Final Exam 2024 Questions and Answers (Graded A) Reinforced Concrete Design Final Exam 2024 Questions and Answers (Graded A) Reinforced Concrete Design Final Exam 2024 Questions and Answers (Graded A) fy - ANSWER-In ACI 318, the effective moment of inertia is a function of all of the following parameters except _______. It stitches the cracks together to maintain concrete capacity and also participates as part of a truss-type mechanism to carry the load f...
    (0)
  • $10.99
  • + learn more
ACI- Concrete Field-Testing Technician - Grade 1 Exam Questions And Answers
  • ACI- Concrete Field-Testing Technician - Grade 1 Exam Questions And Answers

  • Exam (elaborations) • 30 pages • 2024
  • Available in package deal
  • ACI- Concrete Field-Testing Technician - Grade 1 Exam Questions And Answers Q1. Start molding specimens for strength tests within 30 minutes after fabricating the composite sample. A. True B. False - ANS B. False ASTM C172 -Para (4.1.2) - Start molding. specimens for strength tests within 15 min after fabricating the composite sample. Q2. The maximum allowable time between obtaining the first and last portions of the composite sample may not exceed 5 minutes. A. True B....
    (0)
  • $13.99
  • + learn more
Study Exam for ACI CertificationConcrete Field Testing Technician Grade  1 CP-1 (12) 2024 Updated
  • Study Exam for ACI CertificationConcrete Field Testing Technician Grade 1 CP-1 (12) 2024 Updated

  • Exam (elaborations) • 13 pages • 2024
  • Study Exam for ACI CertificationConcrete Field Testing Technician Grade 1 CP-1 (12) 2024 Updated ASTM C1064 - CORRECT ANSWER-Standard Test Method For Temperature of Freshly Mixed Hydraulic-Cement Concrete The sensor of the temperature measuring device shall be submerged a minimum of ______ inches into the freshly mixed concrete. - CORRECT ANSWER-3" The temperature measuring device shall have a capacity of measuring temperature of freshly mixed concrete to ± ______ °F throughout a ...
    (0)
  • $14.49
  • + learn more
ACI Certification Exam Questions With Verified Answers Latest UPDATED 2024/2025 | Scored A+
  • ACI Certification Exam Questions With Verified Answers Latest UPDATED 2024/2025 | Scored A+

  • Exam (elaborations) • 19 pages • 2024
  • Available in package deal
  • ACI Certification Exam Questions With Verified Answers Latest UPDATED 2024/2025 | Scored A+. ASTM C1064 Answer - Standard Test Method For Temperature of Freshly Mixed Hydraulic-Cement Concrete The sensor of the temperature measuring device shall be submerged a minimum of ______ inches into the freshly mixed concrete. Answer - 3" The temperature measuring device shall have a capacity of measuring temperature of freshly mixed concrete to ± ______ °F throughout a range of ____________. Answ...
    (0)
  • $14.99
  • + learn more
ACI- Concrete Field-Testing Technician - Grade 1 Exam | Questions and Correct Answers | Latest Update 2024/2025
  • ACI- Concrete Field-Testing Technician - Grade 1 Exam | Questions and Correct Answers | Latest Update 2024/2025

  • Exam (elaborations) • 61 pages • 2024
  • Available in package deal
  • ACI- Concrete Field-Testing Technician - Grade 1 Exam | Questions and Correct Answers | Latest Update 2024/2025 Q1. Start molding specimens for strength tests within 30 minutes after fabricating the composite sample. A. True B. False - Answer -B. False ASTM C172 -Para (4.1.2) - Start molding. specimens for strength tests within 15 min after fabricating the composite sample. Q2. The maximum allowable time between obtaining the first and last portions of the composite sample may not ex...
    (0)
  • $11.99
  • + learn more
ACI Concrete Field Testing Technician- Grade I Exam 2023/2024 Questions and with Correct Answers.
  • ACI Concrete Field Testing Technician- Grade I Exam 2023/2024 Questions and with Correct Answers.

  • Exam (elaborations) • 15 pages • 2024
  • ACI Concrete Field Testing Technician- Grade I Exam 2023/2024 Questions and with Correct Answers. The sensor of the temperature measuring device shall be submerged a minimum of _____ in. [_____mm] into the freshly mixed concrete. - ANSWER 3 in. [75 mm] The temperature measuring device shall have a capacity of measuring temperature of freshly mixed concrete to +- _____ degrees F [+- _____ C] throughout a range of _____. - ANSWER 1 degree F [0.5 C], 30 degrees F to 120 F [0 C to 50 C] The te...
    (0)
  • $12.99
  • + learn more
ACI Written Exam Questions and Answers Already Passed
  • ACI Written Exam Questions and Answers Already Passed

  • Exam (elaborations) • 20 pages • 2024
  • Available in package deal
  • ACI Written Exam Questions and Answers Already Passed The sensor of the temperature measureing device shall be submerged a minimum of ____ in 3 (75mm) The temperature measureing device shall have a capacity of measuring temperature of freshly mixed conrcrete to +-_____ degrees F throught a range of _____ 1(.5 degrees C), 30-120 (0- 50 degrees C) The temperature measuring device shall be calibrated____, or whenever there is a question of _____ annually, accuracy The temp of concr...
    (0)
  • $9.99
  • + learn more
ACI Certification Exam Questions With Verified Answers, Latest 2024/2025 | Scored A+
  • ACI Certification Exam Questions With Verified Answers, Latest 2024/2025 | Scored A+

  • Exam (elaborations) • 19 pages • 2024
  • Available in package deal
  • ACI Certification Exam Questions With Verified Answers, Latest 2024/2025 | Scored A+. The sensor of the temperature measuring device shall be submerged a minimum of ______ inches into the freshly mixed concrete. Answer - 3" The temperature measuring device shall have a capacity of measuring temperature of freshly mixed concrete to ± ______ °F throughout a range of ____________. Answer - 1 degree, 30 degrees to 120 degrees The temperature measuring device shall be calibrated ______ , or w...
    (0)
  • $14.49
  • + learn more
Concrete ACI Exam Questions And Answers Graded A+
  • Concrete ACI Exam Questions And Answers Graded A+

  • Exam (elaborations) • 15 pages • 2024
  • Concrete ACI Exam Questions And Answers Graded A+ What must be done if the concrete drops below the top of the Slump mold while the top layer is being rodded? Add additional concrete to keep an excess of concrete above the top of the mold at all times Rod each layer ___ times uniformly over the cross section with the rounded end of the rod. 25 The slump mold is filled in _____ layers. 3 layers True or false the slump mold should be in a dry condition before beginning the test?...
    (0)
  • $10.69
  • + learn more