CYB 210 (CYB-210)

Southern New Hampshire University

Here are the best resources to pass CYB 210 (CYB-210). Find CYB 210 (CYB-210) study guides, notes, assignments, and much more.

Page 4 out of 41 results

Sort by

CYB-210 Computer Networking Project Two Network Diagram and Rationale.
  • CYB-210 Computer Networking Project Two Network Diagram and Rationale.

  • Essay • 7 pages • 2023
  • Available in package deal
  • CYB-210 Computer Networking Project Two Network Diagram and Rationale. Network Diagram The pre-existing network configuration was separated into two segments, being Subnet1 and Subnet2. Network 3 has Server_Network3 without the DHCP and DNS services implementation on it. Once the acquires company came aboard and a new network is added, Network3, some changes and requirements to a new network were necessary. Since the addition of the hardware of the new company can not be fully trusted, th...
    (0)
  • $9.59
  • + learn more
CYB-210 7-2 Project One Network Diagram and Rationale.
  • CYB-210 7-2 Project One Network Diagram and Rationale.

  • Essay • 7 pages • 2023
  • Available in package deal
  • CYB-210 7-2 Project One Network Diagram and Rationale. Network Design Rationale 1. New Ip Configuration to combine existing subnets Subnet1 and Subnet2 were merged to form Network A. The secondary router from Subnet two was required, and a new configuration was built using 192.168.1.1 as the gateway. All clients were assigned a static IP within the given scope. Additionally, the now unused port FA 1/0 was closed on the Subnet_Router per security best practice. To confirm communication fun...
    (0)
  • $9.69
  • + learn more
CYB-210 Computer Networking Project Two Network Diagram and Rationale.
  • CYB-210 Computer Networking Project Two Network Diagram and Rationale.

  • Other • 7 pages • 2023
  • Available in package deal
  • CYB-210 Computer Networking Project Two Network Diagram and Rationale. Network Diagram The pre-existing network configuration was separated into two segments, being Subnet1 and Subnet2. Network 3 has Server_Network3 without the DHCP and DNS services implementation on it. Once the acquires company came aboard and a new network is added, Network3, some changes and requirements to a new network were necessary. Since the addition of the hardware of the new company can not be fully trusted, th...
    (0)
  • $8.99
  • + learn more
CYB-210 7-2 Project One Network Diagram and Rationale.
  • CYB-210 7-2 Project One Network Diagram and Rationale.

  • Essay • 7 pages • 2023
  • Available in package deal
  • CYB-210 7-2 Project One Network Diagram and Rationale. Network Design Rationale 1. New Ip Configuration to combine existing subnets Subnet1 and Subnet2 were merged to form Network A. The secondary router from Subnet two was required, and a new configuration was built using 192.168.1.1 as the gateway. All clients were assigned a static IP within the given scope. Additionally, the now unused port FA 1/0 was closed on the Subnet_Router per security best practice. To confirm communication fun...
    (0)
  • $7.99
  • + learn more
CYB-210 Computer Networking Project Two Network Diagram and Rationale.
  • CYB-210 Computer Networking Project Two Network Diagram and Rationale.

  • Essay • 7 pages • 2023
  • Available in package deal
  • CYB-210 Computer Networking Project Two Network Diagram and Rationale. Network Diagram The pre-existing network configuration was separated into two segments, being Subnet1 and Subnet2. Network 3 has Server_Network3 without the DHCP and DNS services implementation on it. Once the acquires company came aboard and a new network is added, Network3, some changes and requirements to a new network were necessary. Since the addition of the hardware of the new company can not be fully trusted, th...
    (0)
  • $8.49
  • + learn more
CYB-210 7-2 Project One Network Diagram and Rationale.
  • CYB-210 7-2 Project One Network Diagram and Rationale.

  • Essay • 7 pages • 2023
  • Available in package deal
  • CYB-210 7-2 Project One Network Diagram and Rationale. Network Design Rationale 1. New Ip Configuration to combine existing subnets Subnet1 and Subnet2 were merged to form Network A. The secondary router from Subnet two was required, and a new configuration was built using 192.168.1.1 as the gateway. All clients were assigned a static IP within the given scope. Additionally, the now unused port FA 1/0 was closed on the Subnet_Router per security best practice. To confirm communication fun...
    (0)
  • $9.69
  • + learn more
CYB-210 7-2 Project One Network Diagram and Rationale
  • CYB-210 7-2 Project One Network Diagram and Rationale

  • Essay • 7 pages • 2022
  • Available in package deal
  • CYB-210 7-2 Project One Network Diagram and Rationale Includes screenshots Only for research and reference use.
    (5)
  • $5.98
  • 24x sold
  • + learn more
CYB-210 6-2 Project One Network Modification Brief
  • CYB-210 6-2 Project One Network Modification Brief

  • Essay • 11 pages • 2022
  • Available in package deal
  • CYB-210 6-2 Project One Network Modification Brief Only for reference or research
    (1)
  • $5.98
  • 7x sold
  • + learn more
CYB-210 Module 5-2 Packet Tracer Analysis
  • CYB-210 Module 5-2 Packet Tracer Analysis

  • Essay • 8 pages • 2022
  • Available in package deal
  • CYB-210 Module 5-2 Packet Tracer Analysis. The reference essay follows rubric requirements and contains screenshots and short step notations. Should be used for research and reference only.
    (2)
  • $5.48
  • 2x sold
  • + learn more