CSE 360 test 1, from book well solved
- Exam (elaborations) • 17 pages • 2024
-
Available in package deal
-
- $17.99
- + learn more
CSE 360 test 1, from book 
many software failures are consequence of these two factors. - correct answer 1. increasing system complexity. 
 
2. Failure to use software engineering methods 
 
Two kinds of software product. - correct answer 1. Generic products 
 
2. Customized(or bespoke) software 
 
Two key phrases in Software engineering - correct answer 1. Engineering discipline 
 
2. All aspects of software production 
 
Software engineering is important for two reasons - correct answer 1. Mor...
-
CSE 360 Test 2 questions well answered graded A+
- Exam (elaborations) • 14 pages • 2024
-
Available in package deal
-
- $15.99
- + learn more
CSE 360 Test 2requirements engineering - correct answer process of establishing services that customer requires from system and constraints under which services operate and are developed 
 
user requirements - correct answer statements in natural language plus diagrams of services written for customers 
 
system requirements - correct answer structure document setting out descriptions of system's functions, services, and operational constraints 
 
functional requirements - correct answer statem...
-
CSE 360(questions with correct answers)graded A+
- Exam (elaborations) • 18 pages • 2024
-
Available in package deal
-
- $17.99
- + learn more
CSE 360External perspective - correct answer An external perspective, where you model the context or environment of the system. 
 
Interaction perspective - correct answer An interaction perspective, where you model the interactions between a system and its environment, or between the components of a system. 
 
Structural perspective - correct answer A structural perspective, where you model the organization of a system or the structure of the data that is processed by the system. 
 
Behavioral ...
-
cse360 final review updated to pass
- Exam (elaborations) • 8 pages • 2024
-
Available in package deal
-
- $12.99
- + learn more
cse360 final reviewSoftware deteriorates due to... - correct answer Changes that degrade the code structure, changes that degrade the design, changes that potentially incorporate more bugs 
 
What are the two broader categories of software products? - correct answer Generic products, customized products 
 
Which of the following is not a major software process activity? - correct answer Software testing 
 
During the lectures, we have discussed software engineering as a four layered technology.....
-
IS 360 - Ch.1 questions n answers
- Exam (elaborations) • 2 pages • 2024
-
Available in package deal
-
- $9.99
- + learn more
IS 360 - Ch.1Software that lays dormant until some specific condition is met is a Trojan horse. - correct answer False 
 
The Health Insurance Portability and Accountability Act of 1996 requires government agencies to identify sensitive systems, conduct computer security training, and develop computer security plans. - correct answer False 
 
The type of hacking that involves breaking into telephone systems is called sneaking. - correct answer False 
 
Confidentiality, integrity, and availabilit...
Want to regain your expenses?
-
IT 360 exam 3 (10,11,12)fully solved graded A+
- Exam (elaborations) • 5 pages • 2024
-
Available in package deal
-
- $11.99
- + learn more
IT 360 exam 3 (10,11,12)E-commerce refers simply to the use of the Internet and the Web to transact business - correct answer True 
 
Retail consumer e-commerce is growing at single-digit rates - correct answer False 
 
The Internet shrinks information asymmetry - correct answer True 
 
All previous mass media in modern history, including the printing press, use a broadcast model where content is created in a central location by experts - correct answer True 
 
Disintermediation provides major b...
-
CSC 360 Midterm Review updated
- Exam (elaborations) • 19 pages • 2024
-
Available in package deal
-
- $17.99
- + learn more
CSC 360 Midterm ReviewNetworking is about information exchange. To billions of online devices, we should fully connect 
all these devices with n(n-1)/2 links, where n is the number of online devices. - correct answer False 
 
Internet is internet. - correct answer False 
 
There are many Internet on earth. - correct answer False 
 
We have many internets. - correct answer True 
 
Internet includes: - correct answer End systems 
Hosts 
Communication Links 
Routers 
Protocols 
 
1 bps = 1Bps - cor...
-
CSE360 Arizona State University -CSE 360 - Exam 1 questions with answers
- Exam (elaborations) • 5 pages • 2024
-
Available in package deal
-
- $12.99
- + learn more
CSE 360 - Exam 1Process - correct answer a structured set of activities required to develop a software system. Think of it like an "object" 
 
Process Model - correct answer A simplified representation of the activities and relationships in a process, think of it like a "class" 
 
Elements/Activities - correct answer 1. Requirements 
2. Modeling/Design 
3. Construction 
4. Testing 
5. Deployment/Delivery 
 
Types of Processes - correct answer 1. Plan-based methods (classical) 
2. Agile metho...
-
CSE 360 Exam 1 (Arizona State University)questions with answers
- Exam (elaborations) • 20 pages • 2024
-
Available in package deal
-
- $17.99
- + learn more
CSE 360 Exam 1 (Arizona State University)Software - 1 - correct answer instructions (computer programs) that when executed provide desired features, function, and performance 
 
Software - 2 - correct answer data structures that enable the programs to adequately manipulate information 
 
Software - 3 - correct answer documentation that describes the operation and use of the programs 
 
"Software Engineering" Origin - correct answer 1968 - Fortran, assembly, etc.: limited, problems were diff - ...
-
CSE 360 Exam 1 slides questions with correct answers rated A+
- Exam (elaborations) • 18 pages • 2024
-
Available in package deal
-
- $17.99
- + learn more
CSE 360 Exam 1 slidesWhat is Software Project Management? - correct answer .Concerned with activities involved in making sure 
that software is delivered on time and in accordance with the requirements of the organizations developing 
and procuring the software. 
• Project management is needed because software development is always subject to budget and schedule constraints that are set by the organization developing the software. 
 
What is the success criteria? - correct answer Deliver the s...