Masterformat - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Masterformat? On this page you'll find 180 study documents about Masterformat.

Page 4 out of 180 results

Sort by

CDT Exam questions and Answers 100%  Correct
  • CDT Exam questions and Answers 100% Correct

  • Exam (elaborations) • 53 pages • 2024
  • Available in package deal
  • CDT Exam questions and Answers 100% Correct Select the entity which is generally assigned the following duties and responsibilities by the Conditions of the Contract: Protection of job site workers and stored materials. A - Architect/Engineer B - Owner C - Contractor D - Varies, as stated in the Supplementary Conditions E - None of the above Reference: PDPG 5.4.1.7 and PDPG 15.12.11; EJCDC C-700 Paras. 7.12 through 7.15; AIA A201 Sections 10.1, 10.2, and 10.4. Also see CCAPG 6.8; CC...
    (0)
  • $17.99
  • + learn more
CDT Exam questions With Correct Answers 100% Solved
  • CDT Exam questions With Correct Answers 100% Solved

  • Exam (elaborations) • 66 pages • 2024
  • Available in package deal
  • CDT Exam questions With Correct Answers 100% Solved Select the entity which is generally assigned the following duties and responsibilities by the Conditions of the Contract: Protection of job site workers and stored materials. A - Architect/Engineer B - Owner C - Contractor D - Varies, as stated in the Supplementary Conditions E - None of the above Reference: PDPG 5.4.1.7 and PDPG 15.12.11; EJCDC C-700 Paras. 7.12 through 7.15; AIA A201 Sections 10.1, 10.2, and 10.4. Also see CCAPG 6....
    (0)
  • $15.49
  • + learn more
CDT Exam Questions With 100% Correct Answers
  • CDT Exam Questions With 100% Correct Answers

  • Exam (elaborations) • 12 pages • 2024
  • Available in package deal
  • CDT Exam Questions With 100% Correct Answers payment bonds - answerThey are usually issued by contractors. The payment bond is referred to as the labor and material payment bond. They are used to guarantee that subcontractors and material suppliers will pay. The payments bounds. Contract bond is known as contract bond, and they are issued by an insurance company or bank to guarantee completion of the project by the contractor. Who acquires and pays for the building permit? - answerThe con...
    (0)
  • $13.49
  • + learn more
 CON 151 Midterm Exam Questions Well Answered Ready To Pass.
  • CON 151 Midterm Exam Questions Well Answered Ready To Pass.

  • Exam (elaborations) • 10 pages • 2024
  • Available in package deal
  • In general, which of the following is NOT a responsibility of the design team? - Answer Hire sub-contractors A project requires the strength of concrete rebar to be at least 60,000 psi. What type of standard is this? - Answer Material Which of the following organizations does NOT produce standards? - Answer BIM Which of the following are covered by zoning codes (select all that apply)? - Answer Maximum height of the building Building location Setback from property lines ...
    (0)
  • $10.09
  • + learn more
COSC 153 Final Exam 1 (100% Verified Solutions).
  • COSC 153 Final Exam 1 (100% Verified Solutions).

  • Exam (elaborations) • 9 pages • 2023
  • Available in package deal
  • COSC 153 Final Exam 1 (100% Verified Solutions). True or False? Regardless of the type of estimate, it's imperative that accuracy is considered down to the dollars and cents. correct answers False What are the typical ways to divide the cost estimate between estimators? Choose all that apply - CSI division - MasterFormat - Uniformat - Assemblies/systems correct answers CSI division MasterFormat Uniformat Assemblies/systems True or False? Reliable Quantity Takeoffs (QTO) take very lit...
    (0)
  • $10.99
  • + learn more
CDT Exam Questions With Correct Answers 100% Solved
  • CDT Exam Questions With Correct Answers 100% Solved

  • Exam (elaborations) • 21 pages • 2024
  • Available in package deal
  • CDT Exam Questions With Correct Answers 100% Solved 1. The method of computation of Contractor's overhead and profits for Change Order prices, where both additions and deletions are involved, is found in the: a) Agreement. b) Conditions of the Contract. c) Division 01. d) Instructions to Bidders. - answerb) Conditions of the Contract. 2. General Requirements are part of: a) Supplementary Conditions. b) Bidding Requirements. c) Specifications. d) Summary of Work. - answerc) Specifica...
    (0)
  • $13.49
  • + learn more
Construction Management Study Guide-Review Questions with correct answers
  • Construction Management Study Guide-Review Questions with correct answers

  • Exam (elaborations) • 18 pages • 2023
  • Available in package deal
  • What two major components make up the contract documents? Correct Answer-Plans --> drawings Specs --> project manual When did architects first use their drawings to communicate design intent? Correct Answer-They built models and drew sketches to help explain to the builders what they wanted done. What does CAD stand for? Correct Answer-Computer Aided Design Typical drawing order in set of plans? Correct Answer-Civil, Architectural, Structural, Mechanical, Electrical Whats the...
    (0)
  • $15.99
  • + learn more
CDT Exam Questions and Answers Already Passed
  • CDT Exam Questions and Answers Already Passed

  • Exam (elaborations) • 38 pages • 2023
  • Available in package deal
  • CDT Exam Questions and Answers Already Passed 1. The method of computation of Contractor's overhead and profits for Change Order prices, where both additions and deletions are involved, is found in the: a) Agreement. b) Conditions of the Contract. c) Division 01. d) Instructions to Bidders. b) Conditions of the Contract. 2. General Requirements are part of: a) Supplementary Conditions. b) Bidding Requirements. c) Specifications. d) Summary of Work. c) Specifications. 3. The three essen...
    (0)
  • $10.99
  • + learn more
CDT Exam questions With Correct Answers 100% Solved
  • CDT Exam questions With Correct Answers 100% Solved

  • Exam (elaborations) • 66 pages • 2024
  • Available in package deal
  • CDT Exam questions With Correct Answers 100% Solved Select the entity which is generally assigned the following duties and responsibilities by the Conditions of the Contract: Protection of job site workers and stored materials. A - Architect/Engineer B - Owner C - Contractor D - Varies, as stated in the Supplementary Conditions E - None of the above Reference: PDPG 5.4.1.7 and PDPG 15.12.11; EJCDC C-700 Paras. 7.12 through 7.15; AIA A201 Sections 10.1, 10.2, and 10.4. Also see CCAPG 6....
    (0)
  • $14.49
  • + learn more
CET 120 Questions and Answers 100%  Solved
  • CET 120 Questions and Answers 100% Solved

  • Exam (elaborations) • 16 pages • 2024
  • Available in package deal
  • CET 120 Questions and Answers 100% Solved The Construction Manager is hired by this entity? The Gen. Contractor In a DBB project method, the gen. Construction contract is between: the contractor and the owner When there is a dispute between the specs and the drawings, what is the proper way to settle the dispute The A/E should intrepret CSI Masterformat Div 1 sections apply broadly to the execution of the work of all the other sections of the specs True A subcontractor is obligat...
    (0)
  • $9.99
  • + learn more