Masterformat - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Masterformat? On this page you'll find 180 study documents about Masterformat.
Page 4 out of 180 results
Sort by
-
CDT Exam questions and Answers 100% Correct
- Exam (elaborations) • 53 pages • 2024
- Available in package deal
-
- $17.99
- + learn more
CDT Exam questions and Answers 100% 
Correct 
Select the entity which is generally assigned the following duties and responsibilities by 
the Conditions of the Contract: Protection of job site workers and stored materials. 
A - Architect/Engineer 
B - Owner 
C - Contractor 
D - Varies, as stated in the Supplementary Conditions 
E - None of the above 
Reference: PDPG 5.4.1.7 and PDPG 15.12.11; EJCDC C-700 Paras. 7.12 through 
7.15; AIA A201 Sections 10.1, 10.2, and 10.4. Also see CCAPG 6.8; CC...
-
CDT Exam questions With Correct Answers 100% Solved
- Exam (elaborations) • 66 pages • 2024
- Available in package deal
-
- $15.49
- + learn more
CDT Exam questions With Correct 
Answers 100% Solved 
Select the entity which is generally assigned the following duties and responsibilities by the 
Conditions of the Contract: Protection of job site workers and stored materials. 
A - Architect/Engineer 
B - Owner 
C - Contractor 
D - Varies, as stated in the Supplementary Conditions 
E - None of the above 
Reference: PDPG 5.4.1.7 and PDPG 15.12.11; EJCDC C-700 Paras. 7.12 through 7.15; AIA 
A201 Sections 10.1, 10.2, and 10.4. Also see CCAPG 6....
-
CDT Exam Questions With 100% Correct Answers
- Exam (elaborations) • 12 pages • 2024
- Available in package deal
-
- $13.49
- + learn more
CDT Exam Questions With 100% Correct 
Answers 
payment bonds - answerThey are usually issued by contractors. The payment bond is 
referred to as the labor and material payment bond. They are used to guarantee that 
subcontractors and material suppliers will pay. The payments bounds. Contract bond is known as 
contract bond, and they are issued by an insurance company or bank to guarantee completion of 
the project by the contractor. 
Who acquires and pays for the building permit? - answerThe con...
-
CON 151 Midterm Exam Questions Well Answered Ready To Pass.
- Exam (elaborations) • 10 pages • 2024
- Available in package deal
-
- $10.09
- + learn more
In general, which of the following is NOT a responsibility of the design team? - Answer Hire sub-contractors 
 
A project requires the strength of concrete rebar to be at least 60,000 psi. What type of standard is this? - Answer Material 
 
Which of the following organizations does NOT produce standards? - Answer BIM 
 
Which of the following are covered by zoning codes (select all that apply)? - Answer Maximum height of the building 
Building location 
Setback from property lines 
 ...
-
COSC 153 Final Exam 1 (100% Verified Solutions).
- Exam (elaborations) • 9 pages • 2023
- Available in package deal
-
- $10.99
- + learn more
COSC 153 Final Exam 1 (100% Verified Solutions). 
True or False? Regardless of the type of estimate, it's imperative that accuracy is considered 
down to the dollars and cents. correct answers False 
What are the typical ways to divide the cost estimate between estimators? Choose all that apply 
- CSI division 
- MasterFormat 
- Uniformat 
- Assemblies/systems correct answers CSI division 
MasterFormat 
Uniformat 
Assemblies/systems 
True or False? Reliable Quantity Takeoffs (QTO) take very lit...
As you read this, a fellow student has made another $4.70
-
CDT Exam Questions With Correct Answers 100% Solved
- Exam (elaborations) • 21 pages • 2024
- Available in package deal
-
- $13.49
- + learn more
CDT Exam Questions With Correct Answers 
100% Solved 
1. The method of computation of Contractor's overhead and profits for Change Order prices, 
where both additions and deletions are involved, is found in the: 
a) Agreement. 
b) Conditions of the Contract. 
c) Division 01. 
d) Instructions to Bidders. - answerb) Conditions of the Contract. 
2. General Requirements are part of: 
a) Supplementary Conditions. 
b) Bidding Requirements. 
c) Specifications. 
d) Summary of Work. - answerc) Specifica...
-
Construction Management Study Guide-Review Questions with correct answers
- Exam (elaborations) • 18 pages • 2023
- Available in package deal
-
- $15.99
- + learn more
What two major components make up the contract documents? Correct Answer-Plans --> drawings 
Specs --> project manual 
 
When did architects first use their drawings to communicate design intent? Correct Answer-They built models and drew sketches to help explain to the builders what they wanted done. 
 
What does CAD stand for? Correct Answer-Computer Aided Design 
 
Typical drawing order in set of plans? Correct Answer-Civil, Architectural, Structural, Mechanical, Electrical 
 
Whats the...
-
CDT Exam Questions and Answers Already Passed
- Exam (elaborations) • 38 pages • 2023
- Available in package deal
-
- $10.99
- + learn more
CDT Exam Questions and Answers Already Passed 
1. The method of computation of Contractor's overhead and profits for Change Order prices, where both additions and deletions are involved, is found in the: 
a) Agreement. 
b) Conditions of the Contract. 
c) Division 01. d) Instructions to Bidders. b) Conditions of the Contract. 
2. General Requirements are part of: 
a) Supplementary Conditions. 
b) Bidding Requirements. 
c) Specifications. d) Summary of Work. c) Specifications. 
3. The three essen...
-
CDT Exam questions With Correct Answers 100% Solved
- Exam (elaborations) • 66 pages • 2024
- Available in package deal
-
- $14.49
- + learn more
CDT Exam questions With Correct 
Answers 100% Solved 
Select the entity which is generally assigned the following duties and responsibilities by the 
Conditions of the Contract: Protection of job site workers and stored materials. 
A - Architect/Engineer 
B - Owner 
C - Contractor 
D - Varies, as stated in the Supplementary Conditions 
E - None of the above 
Reference: PDPG 5.4.1.7 and PDPG 15.12.11; EJCDC C-700 Paras. 7.12 through 7.15; AIA 
A201 Sections 10.1, 10.2, and 10.4. Also see CCAPG 6....
-
CET 120 Questions and Answers 100% Solved
- Exam (elaborations) • 16 pages • 2024
- Available in package deal
-
- $9.99
- + learn more
CET 120 Questions and Answers 100% 
 
Solved 
 
The Construction Manager is hired by this entity? 
The Gen. Contractor 
In a DBB project method, the gen. Construction contract is between: 
the contractor and the owner 
When there is a dispute between the specs and the drawings, what is the proper way to settle the 
dispute 
The A/E should intrepret 
CSI Masterformat Div 1 sections apply broadly to the execution of the work of all the other 
sections of the specs 
True 
A subcontractor is obligat...
How did he do that? By selling his study resources on Stuvia. Try it yourself! Discover all about earning on Stuvia