Masterformat - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Masterformat? On this page you'll find 180 study documents about Masterformat.
Page 2 out of 180 results
Sort by
-
COSC 275 EXAM 2 PALMER QUESTIONS & ANSWERS SCORED A+ TO PASS!!
- Exam (elaborations) • 6 pages • 2024
- Available in package deal
-
- $7.99
- + learn more
Girder - Answer-A large principal beam of steel, reinforced concrete, wood, or a combination of these, 
used to support other structural members at isolated points along its length 
Anchor Bolt - Answer-A threaded bolt, usually embeded in a foundation, for sealing a sill, framework, or 
machinery 
Beam - Answer-A structural member that primarily resists loads applied laterally to the axis 
Column - Answer-A long, relatively slender, supporting pillar. A column is usually loaded axially in 
compr...
-
Level 1 Module 10 Basic Electrical Construction Drawings Exam 2023 with complete solution
- Exam (elaborations) • 3 pages • 2023
- Available in package deal
-
- $11.49
- 1x sold
- + learn more
Level 1 Module 10 Basic Electrical Construction Drawings Exam 2023 with complete solution 
 
A cutaway view of a building or object is known as a(n)______. 
Sectional drawing 
What is the total connected load of Circuit A-1 if each of the Type C lighting fixtures in the figure above has a total lamp and ballast load of 150VA? 
1,200VA 
In which division of the MasterFormat is electronic safety covered? 
Division 28 
A section line on a drawing shows 
The location of the section on the plan 
On e...
-
COSC 253 EXAM 2 (Simms) || All Correct.
- Exam (elaborations) • 8 pages • 2024
- Available in package deal
-
- $11.09
- + learn more
MasterFormat Division 6 correct answers Wood, Plastics, and Composites 
 
Tree Structure correct answers Bark: Outermost protective layer (A: dead, B: living) 
Cambium layer (C): Source of new cells 
Sapwood (D): Living cells that store and transport nutrients 
Heartwood (E): Dead cells that contribute to structural strength 
Pith (F): Innermost, first year's growth 
Annual growth rings (G): Result from differences in rate of tree growth and density of cells, from spring to summer 
 
Softwoods ...
-
COSC 253 - Concrete - Exam 1 || Already Graded A+.
- Exam (elaborations) • 17 pages • 2024
- Available in package deal
-
- $12.89
- + learn more
Concrete Timeline correct answers 1. *200BC-100AD*: Romans 
2. *1824*: Portland Cement 
3. *1850s*:Reinforcement 
4. *1872*: Portland Cement comes to US 
5. *1920s*: Pre-stressing Concrete 
 
Who invented concrete? correct answers The Romans 
 
The Romans correct answers • used longer spans in sitecast concrete 
• the Pantheon built by the Romans around 50AD had a concrete dome that spans 150 feet. 
• Longer spans in concrete are achieved by using very thin layers 
 
What is meant by "spa...
-
CDT exam Questions with Correct Answers (solved)
- Exam (elaborations) • 16 pages • 2024
- Available in package deal
-
- $15.49
- + learn more
CDT exam Questions with Correct 
Answers (solved) 
1. The method of computation of Contractor's overhead and profits for Change Order 
prices, where both additions and deletions are involved, is found in the: 
a) Agreement. 
b) Conditions of the Contract. 
c) Division 01. 
d) Instructions to Bidders. - CORRECT ANSWER-b) Conditions of the Contract. 
2. General Requirements are part of: 
a) Supplementary Conditions. 
b) Bidding Requirements. 
c) Specifications. 
d) Summary of Work. - CORRECT AN...
Get paid weekly? You can!
-
CSI CDT Exam Questions 2024 Marking Scheme 100% Verified
- Exam (elaborations) • 12 pages • 2024
-
- $12.89
- + learn more
CSI CDT Exam Questions 2024 Marking Scheme 100% Verified 
 
 
In a Design/Build project, there is a contractual relationship established between: - Answer -The Owner and single party, Typically a Contractor associated with an A/EnnnFF 040 
 
For the Public sector, Which method is normally followed for the award of a contract? - Answer -Competitive Bidding nnFF 040 
 
The Construction Manager is normally hired by? - Answer -The Owner nnFF 040 
 
The form of contract usually most dif...
-
CDT Exam Practice Questions With 100% Correct Answers
- Exam (elaborations) • 21 pages • 2024
- Available in package deal
-
- $13.49
- + learn more
CDT Exam Practice Questions With 100% 
Correct Answers 
What are the four project teams? 
a. Owner, Facilities, Architect, CM/A 
b. Contractor, Supplier, AHJ, A/E 
c. Owner, Design, Contractor, Supplier 
d. A/E, Subs, AHJ, Facilities Manager - answerc. Owner, Design, Contractor, Supplier 
What are the Stages of the Facility Life Cycle? 
a. Project Conception, Design, Procurement, Construction 
b. Project Conception, Design, Construction Documents, Procurement, Construction, Facility 
Management ...
-
FE CONCEPT QUESTIONS AND ANSWERS
- Exam (elaborations) • 18 pages • 2024
-
- $12.59
- + learn more
which of the following is the Program Evaluation and Review Technique (PERT) used? - Answer-PERT is used to monitor the progress and predict the completion time for large projects. 
-construction projects 
-computer programming assignments 
-preparation of bids and proposals 
 
Which of the following duties would normally be a responsibility of the estimating department within a general contractor's organization? - Answer-The estimation process does not include tracking costs or recording actu...
-
COSC 253 FINAL EXAM REVIEW || WITH 100% VERIFIED SOLUTIONS.
- Exam (elaborations) • 17 pages • 2024
- Available in package deal
-
- $12.79
- + learn more
A _____________________ code requirement contains detailed information, is simpler to implement, and provides certainty for designers and builders. 
descriptive 
prescriptive 
performance 
functioning correct answers prescriptive 
 
Which statement below is correct regarding the construction manager project delivery method? 
It is best suited for simple, straight forward projects 
The CM is involved in the project prior to construction 
The CM has very limited influence on the project 
It elimin...
-
CDT Exam Practice Questions With 100% Correct Answers
- Exam (elaborations) • 21 pages • 2024
- Available in package deal
-
- $13.49
- + learn more
CDT Exam Practice Questions With 100% 
Correct Answers 
What are the four project teams? 
a. Owner, Facilities, Architect, CM/A 
b. Contractor, Supplier, AHJ, A/E 
c. Owner, Design, Contractor, Supplier 
d. A/E, Subs, AHJ, Facilities Manager - answerc. Owner, Design, Contractor, Supplier 
What are the Stages of the Facility Life Cycle? 
a. Project Conception, Design, Procurement, Construction 
b. Project Conception, Design, Construction Documents, Procurement, Construction, Facility 
Management ...
That summary you just bought made someone very happy. Also get paid weekly? Sell your study resources on Stuvia! Discover all about earning on Stuvia