NERC Practice Set 3 Questions with complete solution 2023 b. Perform power flow study in preparation of opening Line 1 - correct answer Your system is experiencing heavy loading and low voltage . What is the first response for a System Operator ? a) Take lines out of service b) Put c...

[Show more]

Preview 2 out of 5  pages

  • August 2, 2023
  • 5
  • 2023/2024
  • Exam (elaborations)
  • Questions & answers
  • NERC Practice Set 3
  • NERC Practice Set 3
avatar-seller
Academia199
NERC Practice Set 3 Questions with complete solution 2023
b. Perform power flow study in preparation of opening Line 1 - correct answer Your system is experiencing heavy loading and low voltage . What is the first response for a System Operator ?
a) Take lines out of service
b) Put capacitors in service
c) Put reactors in service
d) Lower loads - correct answer b) Put capacitors in service
Which of the following action is appropriate for mitigating heavy power transfer on a transmission line ?
a) Put parallel line in service
b) Put a capacitor in service
c) Put a reactor in service
d) Increase generation - correct answer a) Put parallel line in service
Line A is a 100 mile 500kV transmission line. Line B is a 10 mile 500 kV transmission line. Both lines are lightly loaded. Line B is contributing 3.2MVAR to the bus. How much MVAR will line A contribute to the bus ?
a) 10 times 3.2 MVAR
b) Less than 3.2 MVAR
c) Equal to 3.2 MVAR
d) More than 3.2 MVAR - correct answer d) More than 3.2 MVAR
What are the effects of transmission line loading above its surge impedance loading ?
a) The line acts like a capacitor
b) The line acts like a reactor
c) The line ceases to function
d) The line's losses decrease - correct answer b) The line acts like a reactor
After a forced outage , a contingency analysis study shows that one more outage will cause an IROL violation . There is a parallel line out for maintenance that can be returned within a 4 hours window if requested . What must be done first to mitigate this condition ?
a) Put the parallel line in service with protection
b) Put the parallel line in service without protection c) Take the protective tripping off the line
d) Call the RC and formulate an Operating Plan - correct answer d) Call the RC and formulate an Operating Plan
A transformer rated at 100 MVA has 80 MW flowing through it. How many MVARS could flow through it without exceeding its rating?
a) 80 MVAR
b) 60 MVAR
c) 50 MVAR
d) 20 MVAR - correct answer b) 60 MVAR
A system operator notices that frequency has dropped to 59.95 Hz and his Balancing Area's ACE is near zero . The Balancing Authority has plenty of generation to help restore the Interconnection Frequency . Which statement best describes the appropriate
action?
a) Increase generation to improve his CPS score
b) Notify the deficient BA to sell them power
c) Take units off of AGC
d) Ensure that generators are providing governor response - correct answer d) Ensure that generators are providing governor response
A transmission path is rated at 550 MVA and has 500 MW and 55 MVAR of power flowing on the line. What action is required of the system operator ?
a) The line has exceeded its rating is beyond its rating and power flow must be reduce
b) The line will trip if not removed from service
c) No action beyond continued monitoring is required
d) Reconfiguration is needed to lower the reactive power flow - correct answer c) No action beyond continued monitoring is required
If two heavily loaded transmission lines into a Balancing Authority area trip resulting in that area being islanded , what is the likely impact to Interconnection frequency?
a) Interconnection frequency will remain the same
b) Interconnection frequency will likely increase
c) Interconnection frequency will likely decrease
d) The island will have its own frequency - correct answer b) Interconnection frequency will likely increase
11. Which transmission line type will likely produce more reactive power ?
a) Underground cable
b) Lightly loaded short overhead line
c) Loaded tie - line

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Academia199. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $11.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

81298 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$11.99
  • (0)
  Add to cart