Calebomolo01
On this page, you find all documents, package deals, and flashcards offered by seller calebomolo01.
- 1149
- 0
- 47
Community
- Followers
- Following
3 Reviews received
1201 items
ATR 72 Conditions -1 2024/2025 Questions And Answers 100% correct Verified
Conditions required to engage or disengage Prop Brake (ABCFG)Aircraft on the ground 
Blue hydraulic pressure available on prop brake >2100PSI 
CL on FTR or Fuel S.O. 
Fire handle NOT pulled 
Gust lock engaged 
Conditions required for Green ATPCS ARM Light (ATPP)ATPCS Pb : IN 
TQ: >46% 
PL: >49° 
PWR MGT: TO 
ATPCS TriggerTQ: <18% 
ATPCS cancel (ATPP Reverse)ATPCS Pb : OFF 
TQ: <46% 
PL: <49° 
PWR MGT: Not in TO 
Takeoff Inhibit Armed (ABBNP)Aircraft on the Ground 
Both power ...
- Exam (elaborations)
- • 4 pages •
Conditions required to engage or disengage Prop Brake (ABCFG)Aircraft on the ground 
Blue hydraulic pressure available on prop brake >2100PSI 
CL on FTR or Fuel S.O. 
Fire handle NOT pulled 
Gust lock engaged 
Conditions required for Green ATPCS ARM Light (ATPP)ATPCS Pb : IN 
TQ: >46% 
PL: >49° 
PWR MGT: TO 
ATPCS TriggerTQ: <18% 
ATPCS cancel (ATPP Reverse)ATPCS Pb : OFF 
TQ: <46% 
PL: <49° 
PWR MGT: Not in TO 
Takeoff Inhibit Armed (ABBNP)Aircraft on the Ground 
Both power ...
ATR 72- 600 Electrical System 2024/2025 Questions And Answers 100% correct Verified
What current do the majority of the systems use? DC. 
How are the DC Starter Starter/Generators Powered? By the HP Compressor through the 
Aux Gear Box. 
What is the DC generator's rated delivery power? 21KW 
(400A) 
27-31V 
30V nominal 
What does the Generator Control Unit. (GCU) provide? (5) - Fault Detection 
- Over/ Under Voltage 
- Over/Under Speed 
- Generator Overload 
- Current Limiting. 
What does the Bus Power Control Unit (BPCU)
- Exam (elaborations)
- • 4 pages •
What current do the majority of the systems use? DC. 
How are the DC Starter Starter/Generators Powered? By the HP Compressor through the 
Aux Gear Box. 
What is the DC generator's rated delivery power? 21KW 
(400A) 
27-31V 
30V nominal 
What does the Generator Control Unit. (GCU) provide? (5) - Fault Detection 
- Over/ Under Voltage 
- Over/Under Speed 
- Generator Overload 
- Current Limiting. 
What does the Bus Power Control Unit (BPCU)
ATR 72/42 600/500 engine overview 2024/2025 Questions And Answers 100% correct Verified
Reduction Gear Box Items Prop brake 
Prop pump and over speed governor 
ACW generator 
Aux feather pump 
Propeller Valve Module 
Fuel Cooled Oil Cooler 
Accessory Gear Box DC starter/generator 
HP fuel pump 
Engine oil pumps 
Power Plant Overview Aircraft fitted with 
- two Pratt & Whitney, PW 127 E (42-500) 
- two, six blades propellers (Hamilton 568F) 
It's a free turbine engine, composed of 3 concentric shafts and spools: 
- The shaft of the HP spool composed of the HP turbine and the HP com...
- Exam (elaborations)
- • 6 pages •
Reduction Gear Box Items Prop brake 
Prop pump and over speed governor 
ACW generator 
Aux feather pump 
Propeller Valve Module 
Fuel Cooled Oil Cooler 
Accessory Gear Box DC starter/generator 
HP fuel pump 
Engine oil pumps 
Power Plant Overview Aircraft fitted with 
- two Pratt & Whitney, PW 127 E (42-500) 
- two, six blades propellers (Hamilton 568F) 
It's a free turbine engine, composed of 3 concentric shafts and spools: 
- The shaft of the HP spool composed of the HP turbine and the HP com...
ATR 72-600 Limitations 2024/2025 Questions And Answers 100% correct Verified
Reserve Take Off Power Set S. E.SE Only 10 min. TQ100%, ITT- 800, NH 103.2%, NL 
104.2%, NP 101% Oil 55-66psi, Oil Temp 0-125 
Take Off Power SetMax 5 min, TQ 90%, ITT 800, 840 20 sec, NH 101.9%, NL101.4%, 
NP101%, Oil Press 55-65, Oil Temp 0-125 
Max Continuous Pwr90.9TQ, 800 ITT, 103.2%NH, 104.2%NL, 101%NP, 55-65PSI Oil, Oil 
Temp 0-125oC 
Ground IdleNH-66% mini, Oil Press 40mini up to 75%NH 
ITT MAX'sReserve T/O 800c T/O -30=740, 15+ = 765, Start 5 sec = 950, Other 800, up to 
840 for 20 sec...
- Exam (elaborations)
- • 5 pages •
Reserve Take Off Power Set S. E.SE Only 10 min. TQ100%, ITT- 800, NH 103.2%, NL 
104.2%, NP 101% Oil 55-66psi, Oil Temp 0-125 
Take Off Power SetMax 5 min, TQ 90%, ITT 800, 840 20 sec, NH 101.9%, NL101.4%, 
NP101%, Oil Press 55-65, Oil Temp 0-125 
Max Continuous Pwr90.9TQ, 800 ITT, 103.2%NH, 104.2%NL, 101%NP, 55-65PSI Oil, Oil 
Temp 0-125oC 
Ground IdleNH-66% mini, Oil Press 40mini up to 75%NH 
ITT MAX'sReserve T/O 800c T/O -30=740, 15+ = 765, Start 5 sec = 950, Other 800, up to 
840 for 20 sec...
API Questions And Answers 100% correct Verified
API Questions And Answers 100% correct Verified
All Content 580 STUDY EXAM
- Package deal
- • 5 items •
- API 580 All Content Questions And Answers 100% correct Verified • Exam (elaborations)
- API 580 STUDY EXAM Questions And Answers 100% correct Verified • Exam (elaborations)
- API 580 Questions And Answers 100% correct Verified • Exam (elaborations)
- API 580 Questions And Answers 100% correct Verified • Exam (elaborations)
- API 580 (2016) Study Exam - (Referenced) - Questions And Answers 100% correct Verified • Exam (elaborations)
API Questions And Answers 100% correct Verified
All Content 580 STUDY EXAM
API 580 (2016) Study Exam - (Referenced) - Questions And Answers 100% correct Verified
What is the RBI process capable of generating? (Sec. Gen. P. viii)(a) A ranking by relative 
risk of all equipment evaluated 
(b) A detailed description of the inspection plan to be employed for each equipment item 
(c) A description of any other risk mitigation activities, such as repairs, replacements, or safety 
equipment upgrades, equipment redesign or maintenance, IOWs, and controls on operating 
conditions 
(d) The expected risk levels of all equipment after the inspection plan and other r...
- Exam (elaborations)
- • 13 pages •
What is the RBI process capable of generating? (Sec. Gen. P. viii)(a) A ranking by relative 
risk of all equipment evaluated 
(b) A detailed description of the inspection plan to be employed for each equipment item 
(c) A description of any other risk mitigation activities, such as repairs, replacements, or safety 
equipment upgrades, equipment redesign or maintenance, IOWs, and controls on operating 
conditions 
(d) The expected risk levels of all equipment after the inspection plan and other r...
API 580 Flash Cards Questions And Answers 100% correct Verified
The following will cover the functional failures except: 
-Heat exchanger tube failure 
-Pressure relief device failure 
-Rotating equipment failure 
-Static equipment failure due to process environment-Static equipment failure due to process 
environment 
Aqueous chloride solution is carried into a sensitive stainless steel vessel, the ______________ 
mechanism takes very rapidly depending on temperature.chloride stress corrosion cracking 
_______ depict ways in which the system failures repres...
- Exam (elaborations)
- • 6 pages •
The following will cover the functional failures except: 
-Heat exchanger tube failure 
-Pressure relief device failure 
-Rotating equipment failure 
-Static equipment failure due to process environment-Static equipment failure due to process 
environment 
Aqueous chloride solution is carried into a sensitive stainless steel vessel, the ______________ 
mechanism takes very rapidly depending on temperature.chloride stress corrosion cracking 
_______ depict ways in which the system failures repres...
API 580 (2016) Study Exam - (Referenced) - Questions And Answers 100% correct Verified
What is the RBI process capable of generating? (Sec. Gen. P. viii)(a) A ranking by relative 
risk of all equipment evaluated 
(b) A detailed description of the inspection plan to be employed for each equipment item 
(c) A description of any other risk mitigation activities, such as repairs, replacements, or safety 
equipment upgrades, equipment redesign or maintenance, IOWs, and controls on operating 
conditions 
(d) The expected risk levels of all equipment after the inspection plan and other r...
- Package deal
- Exam (elaborations)
- • 13 pages •
What is the RBI process capable of generating? (Sec. Gen. P. viii)(a) A ranking by relative 
risk of all equipment evaluated 
(b) A detailed description of the inspection plan to be employed for each equipment item 
(c) A description of any other risk mitigation activities, such as repairs, replacements, or safety 
equipment upgrades, equipment redesign or maintenance, IOWs, and controls on operating 
conditions 
(d) The expected risk levels of all equipment after the inspection plan and other r...
API 580 Questions And Answers 100% correct Verified
engineering judgmentThe basis for a qualitative probability of failure analysis is: 
damage mechanisms and inspection effectivenessRegardless of whether a more qualitative or 
a quantitative analysis is used, the POF is determined by two main considerations: 
materials of constructionCombinations of process conditions and _____________________ 
for each equipment item should be evaluated to identify active and credible damage mechanisms: 
Risk criteriaExchange or sharing of information about ris...
- Package deal
- Exam (elaborations)
- • 14 pages •
engineering judgmentThe basis for a qualitative probability of failure analysis is: 
damage mechanisms and inspection effectivenessRegardless of whether a more qualitative or 
a quantitative analysis is used, the POF is determined by two main considerations: 
materials of constructionCombinations of process conditions and _____________________ 
for each equipment item should be evaluated to identify active and credible damage mechanisms: 
Risk criteriaExchange or sharing of information about ris...
API 580 Questions And Answers 100% correct Verified
Excessive inspections can have what effect on risk level: May cause the risk level to increase 
RBI is focused on a systematic determination of What type risk? Relative Risk 
RBI is a substitute for? HAZOP Study 
PHA 
MI Programs 
None 
Answer: None 
Risk Criteria is? Terms of reference by which the significance of risk is assessed 
Can include 
associated costs and benefits, socio-economic and environmental aspects, legal and statutory reqs 
Implementation of RBI plans will? Provide an overall ...
- Package deal
- Exam (elaborations)
- • 7 pages •
Excessive inspections can have what effect on risk level: May cause the risk level to increase 
RBI is focused on a systematic determination of What type risk? Relative Risk 
RBI is a substitute for? HAZOP Study 
PHA 
MI Programs 
None 
Answer: None 
Risk Criteria is? Terms of reference by which the significance of risk is assessed 
Can include 
associated costs and benefits, socio-economic and environmental aspects, legal and statutory reqs 
Implementation of RBI plans will? Provide an overall ...
PLATO Edmentum US Government End of Semester Test: 32/32 Correct! questions and Answers 100% Correct
Swift River- ATI 2023/2024 updated Questions and Answers 100% Correct
swift river med surg pt scenarios 2023/2024 updated Questions and Answers 100% Correct