logo-home

Calebomolo01

On this page, you find all documents, package deals, and flashcards offered by seller calebomolo01.

Community

  • Followers
  • Following

3 Reviews received

1201 items

ATR 72 Conditions -1 2024/2025 Questions And Answers 100% correct Verified

(0)
$7.99
0x  sold

Conditions required to engage or disengage Prop Brake (ABCFG)Aircraft on the ground Blue hydraulic pressure available on prop brake >2100PSI CL on FTR or Fuel S.O. Fire handle NOT pulled Gust lock engaged Conditions required for Green ATPCS ARM Light (ATPP)ATPCS Pb : IN TQ: >46% PL: >49° PWR MGT: TO ATPCS TriggerTQ: <18% ATPCS cancel (ATPP Reverse)ATPCS Pb : OFF TQ: <46% PL: <49° PWR MGT: Not in TO Takeoff Inhibit Armed (ABBNP)Aircraft on the Ground Both power ...

i x
  • Exam (elaborations)
  •  • 4 pages • 
  • by calebomolo01 • 
  • uploaded  16-02-2024
Quick View
i x

ATR 72- 600 Electrical System 2024/2025 Questions And Answers 100% correct Verified

(0)
$7.99
0x  sold

What current do the majority of the systems use? DC. How are the DC Starter Starter/Generators Powered? By the HP Compressor through the Aux Gear Box. What is the DC generator's rated delivery power? 21KW (400A) 27-31V 30V nominal What does the Generator Control Unit. (GCU) provide? (5) - Fault Detection - Over/ Under Voltage - Over/Under Speed - Generator Overload - Current Limiting. What does the Bus Power Control Unit (BPCU)

i x
  • Exam (elaborations)
  •  • 4 pages • 
  • by calebomolo01 • 
  • uploaded  16-02-2024
Quick View
i x

ATR 72/42 600/500 engine overview 2024/2025 Questions And Answers 100% correct Verified

(0)
$7.99
0x  sold

Reduction Gear Box Items Prop brake Prop pump and over speed governor ACW generator Aux feather pump Propeller Valve Module Fuel Cooled Oil Cooler Accessory Gear Box DC starter/generator HP fuel pump Engine oil pumps Power Plant Overview Aircraft fitted with - two Pratt & Whitney, PW 127 E (42-500) - two, six blades propellers (Hamilton 568F) It's a free turbine engine, composed of 3 concentric shafts and spools: - The shaft of the HP spool composed of the HP turbine and the HP com...

i x
  • Exam (elaborations)
  •  • 6 pages • 
  • by calebomolo01 • 
  • uploaded  16-02-2024
Quick View
i x

ATR 72-600 Limitations 2024/2025 Questions And Answers 100% correct Verified

(0)
$10.49
0x  sold

Reserve Take Off Power Set S. E.SE Only 10 min. TQ100%, ITT- 800, NH 103.2%, NL 104.2%, NP 101% Oil 55-66psi, Oil Temp 0-125 Take Off Power SetMax 5 min, TQ 90%, ITT 800, 840 20 sec, NH 101.9%, NL101.4%, NP101%, Oil Press 55-65, Oil Temp 0-125 Max Continuous Pwr90.9TQ, 800 ITT, 103.2%NH, 104.2%NL, 101%NP, 55-65PSI Oil, Oil Temp 0-125oC Ground IdleNH-66% mini, Oil Press 40mini up to 75%NH ITT MAX'sReserve T/O 800c T/O -30=740, 15+ = 765, Start 5 sec = 950, Other 800, up to 840 for 20 sec...

i x
  • Exam (elaborations)
  •  • 5 pages • 
  • by calebomolo01 • 
  • uploaded  16-02-2024
Quick View
i x

API 580 (2016) Study Exam - (Referenced) - Questions And Answers 100% correct Verified

(0)
$8.99
0x  sold

What is the RBI process capable of generating? (Sec. Gen. P. viii)(a) A ranking by relative risk of all equipment evaluated (b) A detailed description of the inspection plan to be employed for each equipment item (c) A description of any other risk mitigation activities, such as repairs, replacements, or safety equipment upgrades, equipment redesign or maintenance, IOWs, and controls on operating conditions (d) The expected risk levels of all equipment after the inspection plan and other r...

i x
  • Exam (elaborations)
  •  • 13 pages • 
  • by calebomolo01 • 
  • uploaded  16-02-2024
Quick View
i x

API 580 Flash Cards Questions And Answers 100% correct Verified

(0)
$7.99
0x  sold

The following will cover the functional failures except: -Heat exchanger tube failure -Pressure relief device failure -Rotating equipment failure -Static equipment failure due to process environment-Static equipment failure due to process environment Aqueous chloride solution is carried into a sensitive stainless steel vessel, the ______________ mechanism takes very rapidly depending on temperature.chloride stress corrosion cracking _______ depict ways in which the system failures repres...

i x
  • Exam (elaborations)
  •  • 6 pages • 
  • by calebomolo01 • 
  • uploaded  16-02-2024
Quick View
i x

API 580 (2016) Study Exam - (Referenced) - Questions And Answers 100% correct Verified

(0)
$7.99
0x  sold

What is the RBI process capable of generating? (Sec. Gen. P. viii)(a) A ranking by relative risk of all equipment evaluated (b) A detailed description of the inspection plan to be employed for each equipment item (c) A description of any other risk mitigation activities, such as repairs, replacements, or safety equipment upgrades, equipment redesign or maintenance, IOWs, and controls on operating conditions (d) The expected risk levels of all equipment after the inspection plan and other r...

i x
  •  Package deal
  • Exam (elaborations)
  •  • 13 pages • 
  • by calebomolo01 • 
  • uploaded  16-02-2024
Quick View
i x

API 580 Questions And Answers 100% correct Verified

(0)
$9.49
0x  sold

engineering judgmentThe basis for a qualitative probability of failure analysis is: damage mechanisms and inspection effectivenessRegardless of whether a more qualitative or a quantitative analysis is used, the POF is determined by two main considerations: materials of constructionCombinations of process conditions and _____________________ for each equipment item should be evaluated to identify active and credible damage mechanisms: Risk criteriaExchange or sharing of information about ris...

i x
  •  Package deal
  • Exam (elaborations)
  •  • 14 pages • 
  • by calebomolo01 • 
  • uploaded  16-02-2024
Quick View
i x

API 580 Questions And Answers 100% correct Verified

(0)
$7.99
0x  sold

Excessive inspections can have what effect on risk level: May cause the risk level to increase RBI is focused on a systematic determination of What type risk? Relative Risk RBI is a substitute for? HAZOP Study PHA MI Programs None Answer: None Risk Criteria is? Terms of reference by which the significance of risk is assessed Can include associated costs and benefits, socio-economic and environmental aspects, legal and statutory reqs Implementation of RBI plans will? Provide an overall ...

i x
  •  Package deal
  • Exam (elaborations)
  •  • 7 pages • 
  • by calebomolo01 • 
  • uploaded  16-02-2024
Quick View
i x