logo-home

Performance

Welcome To my Store
My Goal is to help you achieve your desired grades by providing credible study materials
I'm happy to help you with quality documents On this page you will find quality study guides, Exams assignments, Research papers and Test Banks all verified correct . you'll find past and recent revised and verified study materials .
Stay here and You'll find everything you need to pass !!! . I always ensure my documents are of high standards

Be assured to get good grades and always leave a review after a purchase
Refer a friend
SUCCESS!!!

Community

  • Followers
  • Following

5 Reviews received

8049 items

ICC SAMPLE EXAM QUESTIONS AND ANSWERS WITH SOLUTIONS 2025

(0)
$10.99
0x  sold

A confined space is: a) not meant for continuous employee occupancy b) limited in entry and exit c) large enough so that an employee can enter and perform work d) all of the above - ANSWER d) all of the above Title 8 CCR, section 5157(b) All of the following are not exempt from UST regulations EXCEPT: a) heating oil tanks b) waste oil tanks c) motor vehicle fuel tanks d) aviation fuel tanks - ANSWER a) heating oil tanks Title 23 CCR, section 2621(a)(2) The following is an...

i x
  • Exam (elaborations)
  •  • 7 pages • 
  • by Performance • 
  • uploaded  16-11-2024
Quick View
i x

ICC U2 UST DECOMMISSIONING QUESTIONS AND ANSWERS WITH SOLUTIONS 2025

(0)
$15.49
0x  sold

1. Under ground _______________ storage systems are not longer needed or suitable for product storage must be properly disposed of properly - ANSWER A. Gas B. Oil C. Petroleum D. All of the above Answer. C 2. All work that is completed at the site must be accomplished in accordance with federal, state, and local requirements as well as accepted safety standards. - ANSWER A. True B. False Answer: True. 3. All applicable permits must be obtained prior to beginning any work. - ANSWER A...

i x
  •  Package deal
  • Exam (elaborations)
  •  • 76 pages • 
  • by Performance • 
  • uploaded  16-11-2024
Quick View
i x

ICC PRACTICE QUESTIONS AND ANSWERS WITH SOLUTINS 2025

(0)
$9.99
0x  sold

According to CCR, Title 23 UST Regulations, What is the frequency that the Monitor Certification must be performed? - ANSWER Every 12 months (1year) If visual monitoring is utilized as the means of release detection for single walled tank, it must be conducted on a _______ Basis. - ANSWER Daily The Purpose of spill and overfill protection equipment is to minimize the potential for a release during: - ANSWER Fuel Deliveries Under-Dispenser Containment is required for ______ underground s...

i x
  •  Package deal
  • Exam (elaborations)
  •  • 2 pages • 
  • by Performance • 
  • uploaded  16-11-2024
Quick View
i x

UST questions to study & answers with solutions 2024/25

(0)
$10.49
0x  sold

The regulations to enforce compliance of underground storage tank systems in the state are found in? a.) Code of Federal Regulations, 40 CFR Part 281 b.) California Code of Regulations, Title 23, Chapter 16 c.) Code of Federal Regulations, 40 CFR Part 280 d.) California Code of Regulations, Title 23, Chapter 17 - ANSWER b.) California Code of Regulations; Title 23, Chapter 16 By definition an "underground storage tank system" includes a.) The tank, all connected piping and disp...

i x
  •  Package deal
  • Exam (elaborations)
  •  • 58 pages • 
  • by Performance • 
  • uploaded  16-11-2024
Quick View
i x

SN HRSD certification study guide questions and answers with solutions 2024/25

(0)
$10.49
0x  sold

What can be defined through an HR Template? - ANSWER tasks and approvals What are e-signatures? - ANSWER E-signatures are an image of the signature placed on a document to represent an acknowledgement or approval E-signatures on HR PDF documents are stored as an image on the PDF file. - ANSWER true Select ALL of the HR Task types that are available: - ANSWER Credential, eSignature, URL, HR Service, Submit Catalog items , Submit Order Guide, Sign Document , Mark when complete, Up...

i x
  • Exam (elaborations)
  •  • 18 pages • 
  • by Performance • 
  • uploaded  16-11-2024
Quick View
i x

DATES & TIME LENGTHS UST EXAM QUESTIONS AND ANSWERS WITH SOLUTIONS 2024/25

(0)
$13.39
0x  sold

Under-dispenser containment was required for all UST systems by ___________. a.) December 31, 2003 b.) July 1, 1987 c.) January 1, 1984 d.) January 1, 2000 - ANSWER a.) December 31, 2003CCR Title 23, Sec 2636(g)(C) According to California Law, UST systems installed after July 1, 2003, require a one-time ELD test to ensure that the tank is product tight... a.) If the tank is located within one (1) mile of a public drinking water well b.) If the tank is located within 1000 feet of a publi...

i x
  •  Package deal
  • Exam (elaborations)
  •  • 18 pages • 
  • by Performance • 
  • uploaded  16-11-2024
Quick View
i x

CALIFORNIA UST SERVICE TECHNICIAN PART 2 QUESTIONS AND ANSWERS WITH SOLUTIONS 2024/25

(0)
$9.99
0x  sold

when an automatic tank gauge is utilized for singlewall Tank leak detection it shall generate A post test hard copy data report of the following information EXCEPT: - ANSWER Outside air temperature. Approved cathodic protection methods include? - ANSWER Sacrificial anodes Impressed current systems Cathodic protection systems must be inspected by a certified cathodic protection tester within ___ months of installation - ANSWER 6 UST include the following? - ANSWER 500 gallon waste oil

i x
  •  Package deal
  • Exam (elaborations)
  •  • 2 pages • 
  • by Performance • 
  • uploaded  16-11-2024
Quick View
i x

ICC Service Technician study guide questions & answers with solutions 2024/25

(0)
$12.39
0x  sold

According to CCR, Title 23 UST Regulations, What is the frequency that the Monitor Certification must be performed? - ANSWER Every 12 Months If visual monitoring is utilized as the means of release detection for single walled tank, it must be conducted on a _______ Basis. - ANSWER Daily The Purpose of spill and overfill protection equipment is to minimize the potential for a release during: - ANSWER Fuel Deliveries Which of the following is a potential symptom of toxic petroleum exposur...

i x
  •  Package deal
  • Exam (elaborations)
  •  • 15 pages • 
  • by Performance • 
  • uploaded  16-11-2024
Quick View
i x

CALIFORNIA UST SERVICE TECHNICIAN PART 1 QUESTIONS AND ANSWERS WITH SOLUTIONS 2024/25

(0)
$13.49
0x  sold

July 1 2005, service techs shall possess or work under someone who has a current certification indicating he or she has passed the ? - ANSWER California UST service technician exam ICC cert must be renewed every? - ANSWER 24 months Service techs must posses or be employed by a person who has the appropriate contractors license unless? - ANSWER The individual has a Tank testing licens Service tech is defined by any individual who? - ANSWER Test UST monitoring equipment Trouble shoots U...

i x
  •  Package deal
  • Exam (elaborations)
  •  • 6 pages • 
  • by Performance • 
  • uploaded  16-11-2024
Quick View
i x