CMGT 4100 Test 1 Questions & Answers(RATED A+)
What info is addressed in the planning and scheduling process? - ANSWER-Planning- "what" is going to be done, "how", "where", and by "whom" 
-Scheduling- determining time needed to complete a project 
 
Who developed the bar chart - ANSWERHenry Gantt 
 
Is A-O-A (or ADM) a version of CPM scheduling? - ANSWERYes 
 
What is the difference in determinist and probabilistic durations? Which does A-O-A use? Which does PERT use? - ANSWER-Deterministic schedules - specific durations dates, and t...
- Package deal
- Exam (elaborations)
- • 4 pages •
What info is addressed in the planning and scheduling process? - ANSWER-Planning- "what" is going to be done, "how", "where", and by "whom" 
-Scheduling- determining time needed to complete a project 
 
Who developed the bar chart - ANSWERHenry Gantt 
 
Is A-O-A (or ADM) a version of CPM scheduling? - ANSWERYes 
 
What is the difference in determinist and probabilistic durations? Which does A-O-A use? Which does PERT use? - ANSWER-Deterministic schedules - specific durations dates, and t...
Chapter 11 (Project Risk Management) Questions & Answers(RATED A+)
Project Risk Management - ANSWERThe processes of conducting risk management planning, identification, analysis, response planning, and controlling risk on a project. ***The objectives are to increase the probability and impact of positive events and decrease the probability and impact of negative events. 
 
What are the six process for Project Risk Management? - ANSWERPlan Risk Management, Identify Risks, Perform Qualitative Risk Analysis, Perform Quantitative Risk Analysis, Plan Risk Responses,...
- Package deal
- Exam (elaborations)
- • 5 pages •
Project Risk Management - ANSWERThe processes of conducting risk management planning, identification, analysis, response planning, and controlling risk on a project. ***The objectives are to increase the probability and impact of positive events and decrease the probability and impact of negative events. 
 
What are the six process for Project Risk Management? - ANSWERPlan Risk Management, Identify Risks, Perform Qualitative Risk Analysis, Perform Quantitative Risk Analysis, Plan Risk Responses,...
CM 410 Final Exam Questions & Answers 100% Correct
*5 types of bonds* - ANSWERBid bond 
Performance bond 
Payment bond 
Warranty bond 
Green bond 
 
*A101* - ANSWERLUMP sum contract 
 
*A111* - ANSWERCOST OF THE WORK PLUS FEE 
 
*A121 CMc* - ANSWERCM @ Risk 
 
*A131 CMc* - ANSWERCM @ Management 
 
A141 - ANSWERDesign-build 
 
*A201* - ANSWERGeneral Conditions 
 
A401 - ANSWERAgreement between contractor and sub 
 
All Risk Insurance - ANSWERInsurance that covers loss caused by all perils except those specifically excluded in the contract. 
Cove...
- Package deal
- Exam (elaborations)
- • 8 pages •
*5 types of bonds* - ANSWERBid bond 
Performance bond 
Payment bond 
Warranty bond 
Green bond 
 
*A101* - ANSWERLUMP sum contract 
 
*A111* - ANSWERCOST OF THE WORK PLUS FEE 
 
*A121 CMc* - ANSWERCM @ Risk 
 
*A131 CMc* - ANSWERCM @ Management 
 
A141 - ANSWERDesign-build 
 
*A201* - ANSWERGeneral Conditions 
 
A401 - ANSWERAgreement between contractor and sub 
 
All Risk Insurance - ANSWERInsurance that covers loss caused by all perils except those specifically excluded in the contract. 
Cove...
EXAM #2 CMGT 235 Questions & Answers(RATED A+)
Circuit - ANSWERis a complete path (when ON) for current to take that includes electrical control devices, circuit protection, conductors, and load(s) 
 
static electricity - ANSWERis an electrical charge at rest 
 
semiconductor - ANSWERis an electronic device that has electrical conductivity between that of a conductor (high conductivity) and that of an insulator (low conductivity) 
 
if a fire should occur, the first thing an individual must do is _______ - ANSWERprovide an alarm 
 
Ground Fa...
- Package deal
- Exam (elaborations)
- • 41 pages •
Circuit - ANSWERis a complete path (when ON) for current to take that includes electrical control devices, circuit protection, conductors, and load(s) 
 
static electricity - ANSWERis an electrical charge at rest 
 
semiconductor - ANSWERis an electronic device that has electrical conductivity between that of a conductor (high conductivity) and that of an insulator (low conductivity) 
 
if a fire should occur, the first thing an individual must do is _______ - ANSWERprovide an alarm 
 
Ground Fa...
SeMS Test 2 Questions With Correct Answers
New standard for ICAO annex 17 - ANSWER- ensure that landside areas are identified 
- ensure that measures are established to mitigate the risk and deter possible attacks; 
- coordinate measures between departments and agencies and identify appropriate responsibilities in the national civil aviation security program 
 
landside - ANSWERParts of an airport that are adjacent terrain and buildings that are not airside, as identified by states and relative entities in their security programs 
 
Targ...
- Package deal
- Exam (elaborations)
- • 3 pages •
New standard for ICAO annex 17 - ANSWER- ensure that landside areas are identified 
- ensure that measures are established to mitigate the risk and deter possible attacks; 
- coordinate measures between departments and agencies and identify appropriate responsibilities in the national civil aviation security program 
 
landside - ANSWERParts of an airport that are adjacent terrain and buildings that are not airside, as identified by states and relative entities in their security programs 
 
Targ...
2014/12/08 Management Module 3.2 Management Types Correct 100%(RATED A)
People - ANSWERHuman Resources main focus is: 
 
Modeling and prototyping - ANSWERIn which phase of a product design does manufacturing check tooling and engineering to refine design-related issues? 
 
HR - ANSWERWhat is the abbreviation for Human Resources? 
 
Promotion plans - ANSWERWhat type of plan does Human Resources assist in developing that encourages employee growth within a company? 
 
Follow a product through its lifecycle - ANSWERProduct managers often have to: 
 
Processes that crea...
- Package deal
- Exam (elaborations)
- • 2 pages •
People - ANSWERHuman Resources main focus is: 
 
Modeling and prototyping - ANSWERIn which phase of a product design does manufacturing check tooling and engineering to refine design-related issues? 
 
HR - ANSWERWhat is the abbreviation for Human Resources? 
 
Promotion plans - ANSWERWhat type of plan does Human Resources assist in developing that encourages employee growth within a company? 
 
Follow a product through its lifecycle - ANSWERProduct managers often have to: 
 
Processes that crea...
Week 6 pretest Questions & Answers Correct 100%(GRADED A)
After working through two iterations with your Agile team, you've noticed that velocity is a bit lower than anticipated. During a daily stand-up meeting, one of the impediments that your team identifies is that process seems bulky and more time consuming than it needs to be. What would you suggest as a good way for the team to analyze the team processes for areas of improvement? - ANSWERValue Stream Map 
 
Sally is performing expected monetary value analysis on a newly identified risk. She has ...
- Package deal
- Exam (elaborations)
- • 2 pages •
After working through two iterations with your Agile team, you've noticed that velocity is a bit lower than anticipated. During a daily stand-up meeting, one of the impediments that your team identifies is that process seems bulky and more time consuming than it needs to be. What would you suggest as a good way for the team to analyze the team processes for areas of improvement? - ANSWERValue Stream Map 
 
Sally is performing expected monetary value analysis on a newly identified risk. She has ...
CMGT 4100 Final Exam Correct 100%(RATED A)
· advantages of bar charts ( - ANSWERsimple to prepare) (simple to read) 
 
· what advantages does a network diagram have over a bar chart - ANSWER- logic or relationships of activities 
 
· purpose of resource allocation- - ANSWERties back to efficiency making sure each activity get the needed resources 
 
· Whats something we haven't leveled- - ANSWERtime you can level equipment materials labor but not really time 
 
· When you accelerate a project what happens to - ANSWERdirect cost- in...
- Package deal
- Exam (elaborations)
- • 1 pages •
· advantages of bar charts ( - ANSWERsimple to prepare) (simple to read) 
 
· what advantages does a network diagram have over a bar chart - ANSWER- logic or relationships of activities 
 
· purpose of resource allocation- - ANSWERties back to efficiency making sure each activity get the needed resources 
 
· Whats something we haven't leveled- - ANSWERtime you can level equipment materials labor but not really time 
 
· When you accelerate a project what happens to - ANSWERdirect cost- in...
cmst 410 exam 1 Questions & Answers(RATED A+)
Examples of ways to be a family - ANSWER- nuclear 
- grandparent-grandchild 
-adopted children 
 
The Constitutive Function - ANSWERCommunication constructs and reflects family relationships 
 
family members use communication to create..... - ANSWERshared meaning and culture 
 
Relationships are ever changing because they are not _________ - ANSWERstatic 
 
multigenerational communication patterns - ANSWERhow we communicate is passed down through generations 
 
Compensation - ANSWERwhen you did...
- Package deal
- Exam (elaborations)
- • 5 pages •
Examples of ways to be a family - ANSWER- nuclear 
- grandparent-grandchild 
-adopted children 
 
The Constitutive Function - ANSWERCommunication constructs and reflects family relationships 
 
family members use communication to create..... - ANSWERshared meaning and culture 
 
Relationships are ever changing because they are not _________ - ANSWERstatic 
 
multigenerational communication patterns - ANSWERhow we communicate is passed down through generations 
 
Compensation - ANSWERwhen you did...
cmgt exam 3 Questions & Answers
Two purposes for foam wood laminate flooring underlaymentare: - ANSWERWaterproofing and Sound Dampening 
 
casement windows - ANSWERopen like a door 
 
single hung window - ANSWERopen up (sashe) 
 
Sliding window - ANSWERsashe opens right to left 
 
Fixed Window - ANSWERdoes not open 
 
Two types of steep roof coverings - ANSWERwood shingles and asphalt shingles 
 
Insulated glass units - ANSWERresidential windows in northern ontario 
 
Patterned Glass - ANSWERA public wash room window 
 
Temper...
- Package deal
- Exam (elaborations)
- • 1 pages •
Two purposes for foam wood laminate flooring underlaymentare: - ANSWERWaterproofing and Sound Dampening 
 
casement windows - ANSWERopen like a door 
 
single hung window - ANSWERopen up (sashe) 
 
Sliding window - ANSWERsashe opens right to left 
 
Fixed Window - ANSWERdoes not open 
 
Two types of steep roof coverings - ANSWERwood shingles and asphalt shingles 
 
Insulated glass units - ANSWERresidential windows in northern ontario 
 
Patterned Glass - ANSWERA public wash room window 
 
Temper...
OSHA 10-Hour Construction Final Exam Questions and Answers 100% Correct
TCDHA Orofacial Exam 2024 Questions and Answers 100% Verified
TCDHA Radiography Theory Midterm Review Questions and Answers (Graded A)
OSHA-10 Final Exam 2024 Questions and Answers (Graded A)
ISSA CPR AND AED EXAM QUESTIONS AND ANSWERS 100% CORRECT(RATED A+)