Power-horse Library
HELLO Dear ones
On this Account you will find all Study related Materials ,EXAMS, STUDY GUIDES, CASES,NOTEBOOKS and many more.
well come as we study for Excellency.
- 3622
- 0
- 255
Community
- Followers
- Following
22 Reviews received
3883 items
NCCCO test #3 CORRECT QUESTIONS & ANSWERS(GRADED A+)
The crane is out of level, you release the swing break, the boom swings downhill, your: - ANSWER Load radius increases 
 
Blocking can be placed under the ends of tracks to: - ANSWER Increase the cranes stability when Operating over front or back 
 
What quadrant produces the least amount of ground pressure on a lattice crawler: - ANSWER Side 
 
On lattice boom crane's fitted with power load Lowering , a heavy load should be lowered by using the: - ANSWER Power Load-lowering feature and the foo...
- Package deal
- Exam (elaborations)
- • 8 pages •
The crane is out of level, you release the swing break, the boom swings downhill, your: - ANSWER Load radius increases 
 
Blocking can be placed under the ends of tracks to: - ANSWER Increase the cranes stability when Operating over front or back 
 
What quadrant produces the least amount of ground pressure on a lattice crawler: - ANSWER Side 
 
On lattice boom crane's fitted with power load Lowering , a heavy load should be lowered by using the: - ANSWER Power Load-lowering feature and the foo...
Crane practice test #3 QUESTIONS & SOLUTIONS!
If the operator is setting up the crane alone, which of the following is required? 
A. Overhead power lines must be at least 10ft over the boom 
B. Wind speed cannot exceed on the Beaufort 
C. The red cones designating the work zone must be set up 
D. Stabilizers shall be visible to the operator when extending and setting - ANSWER D. Stabilizers shall be visible to the operator when extending and setting 
 
Before the boom is un-stowed from the transport position which of the following is mos...
- Package deal
- Exam (elaborations)
- • 15 pages •
If the operator is setting up the crane alone, which of the following is required? 
A. Overhead power lines must be at least 10ft over the boom 
B. Wind speed cannot exceed on the Beaufort 
C. The red cones designating the work zone must be set up 
D. Stabilizers shall be visible to the operator when extending and setting - ANSWER D. Stabilizers shall be visible to the operator when extending and setting 
 
Before the boom is un-stowed from the transport position which of the following is mos...
NCCCO tower crane flashcards COMPLETE QUESTIONS AND SOLUTIONS(LATEST UPDATE 2024)
Splices in rall tracks shall have - ANSWER Smooth Joints 
 
Hydraulic systems should have their proper fluid level checked - ANSWER Daily 
 
If power fails during operations, the following shouldn't apply - ANSWER Do your best to finish moving load where it was designated to go 
 
If load is undetermined who is to find out if load weight does not exceed crane rating at radius at which the load is to be lifted - ANSWER Person responsible for lift 
 
Where should climbing instructions be kept - A...
- Package deal
- Exam (elaborations)
- • 19 pages •
Splices in rall tracks shall have - ANSWER Smooth Joints 
 
Hydraulic systems should have their proper fluid level checked - ANSWER Daily 
 
If power fails during operations, the following shouldn't apply - ANSWER Do your best to finish moving load where it was designated to go 
 
If load is undetermined who is to find out if load weight does not exceed crane rating at radius at which the load is to be lifted - ANSWER Person responsible for lift 
 
Where should climbing instructions be kept - A...
NCCCO Practice QUESTIONS & CORRECT ANSWERS(GRADED A+)
Crane configuration includes: 
A. reeving, boom length, counterweight, on outriggers, on rubbers, extensions or jibs stowed or mounted, off sets, wire rope type or construction 
B. hoist drum speeds, line pull, wire rope size and rigging 
C. load charts, LMI, axle weights and center of gravity 
D. drum rotation indicator, anti-two block, axle lock outs, and positive house lock - ANSWER A 
 
How does the operator determine the manufacturers recommended rope for the crane? 
A. count the sheav...
- Package deal
- Exam (elaborations)
- • 10 pages •
Crane configuration includes: 
A. reeving, boom length, counterweight, on outriggers, on rubbers, extensions or jibs stowed or mounted, off sets, wire rope type or construction 
B. hoist drum speeds, line pull, wire rope size and rigging 
C. load charts, LMI, axle weights and center of gravity 
D. drum rotation indicator, anti-two block, axle lock outs, and positive house lock - ANSWER A 
 
How does the operator determine the manufacturers recommended rope for the crane? 
A. count the sheav...
NCCCO Questions Test 1 CORRECT 100%.
Where is the best location for leveling a crane? - ANSWER Upperworks 
 
When determining the "gross load" the best method is: - ANSWER Get an accurate load weight and add the rigging. 
 
By order of hitch strength, which is the correct answer? - ANSWER Basket, vertical, choker 
 
What is the purpose of using a jib? - ANSWER Increase height 
 
When taking a side strain on a boom, what concerns the operator most? - ANSWER Boom damage 
 
You should always have at least how many wraps on a hoist d...
- Package deal
- Exam (elaborations)
- • 6 pages •
Where is the best location for leveling a crane? - ANSWER Upperworks 
 
When determining the "gross load" the best method is: - ANSWER Get an accurate load weight and add the rigging. 
 
By order of hitch strength, which is the correct answer? - ANSWER Basket, vertical, choker 
 
What is the purpose of using a jib? - ANSWER Increase height 
 
When taking a side strain on a boom, what concerns the operator most? - ANSWER Boom damage 
 
You should always have at least how many wraps on a hoist d...
NCCCO TEST 2|| 50 QUESTIONS|| CORRECT ANSWERS|| LATEST UPDATE 2024.
When making a multiple crane lift, it is important for the operator to understand that: - ANSWER The weight may increase if the other crane lands the load 
 
If a crane is not set-up level and the operator swings a load from the high side to the low side, the load radius will: - ANSWER Increase 
 
Most crane manufacturers reduce load capacity for duty-cycle operations because: - ANSWER Side loading forces may occur 
 
On who's recommendations should a preventative maintenance program be set-up?...
- Exam (elaborations)
- • 6 pages •
When making a multiple crane lift, it is important for the operator to understand that: - ANSWER The weight may increase if the other crane lands the load 
 
If a crane is not set-up level and the operator swings a load from the high side to the low side, the load radius will: - ANSWER Increase 
 
Most crane manufacturers reduce load capacity for duty-cycle operations because: - ANSWER Side loading forces may occur 
 
On who's recommendations should a preventative maintenance program be set-up?...
Mobile Crane Operator Core Review Questions & ANSWERS(RATED A+)
Distribute over a larger area. - ANSWER What is the purpose of placing mats or cribbing under outrigger floats? 
 
Upperworks. - ANSWER Where is the best location for leveling a crane? 
 
there is no weight of the crane bearing on any tires - ANSWER Before leveling a mobile crane on outriggers, an operator should ensure: 
 
Operating a mobile crane with a long boom, on uneven ground, what support condition should be considered? - ANSWER Keeping a 90° angle between cylinder rod and pad. 
 
Opera...
- Package deal
- Exam (elaborations)
- • 25 pages •
Distribute over a larger area. - ANSWER What is the purpose of placing mats or cribbing under outrigger floats? 
 
Upperworks. - ANSWER Where is the best location for leveling a crane? 
 
there is no weight of the crane bearing on any tires - ANSWER Before leveling a mobile crane on outriggers, an operator should ensure: 
 
Operating a mobile crane with a long boom, on uneven ground, what support condition should be considered? - ANSWER Keeping a 90° angle between cylinder rod and pad. 
 
Opera...
NCCCO Core Questions & correct answers(graded A+)
The term "Superstructure or Upper works" refers to the area of the crane: - ANSWER Above the swing circle 
 
A crane must be level within _______% for the load chart ratings to be valid? - ANSWER 1% 
 
On what principle is crane stability based? - ANSWER Leverage 
 
What would be the effect of moving the tipping axis closer to the cranes center of gravity? - ANSWER Reduced stability 
 
Which of the following matches the appropriate load chart to a particular crane? - ANSWER Serial number 
 
Wh...
- Package deal
- Exam (elaborations)
- • 18 pages •
The term "Superstructure or Upper works" refers to the area of the crane: - ANSWER Above the swing circle 
 
A crane must be level within _______% for the load chart ratings to be valid? - ANSWER 1% 
 
On what principle is crane stability based? - ANSWER Leverage 
 
What would be the effect of moving the tipping axis closer to the cranes center of gravity? - ANSWER Reduced stability 
 
Which of the following matches the appropriate load chart to a particular crane? - ANSWER Serial number 
 
Wh...
NCCCO Practice Test 100% accurate.
To provide protection in the crane's work area, barriers MUST be erected in accessible areas: 
A. Within machinery housing 
C. Within maximum radius 
D. In landing area - ANSWER B.Within the equipment's rotating structure 
 
All of the following can cause a two-block condition EXCEPT: 
A. Extending the boom 
B. Lowering the boom 
C. Hoisting up with the winch - ANSWER D. Raising the boom 
 
When rotation of the load may be hazardous, the operator must 
B. Use a longer radius 
C. Caution ...
- Package deal
- Exam (elaborations)
- • 5 pages •
To provide protection in the crane's work area, barriers MUST be erected in accessible areas: 
A. Within machinery housing 
C. Within maximum radius 
D. In landing area - ANSWER B.Within the equipment's rotating structure 
 
All of the following can cause a two-block condition EXCEPT: 
A. Extending the boom 
B. Lowering the boom 
C. Hoisting up with the winch - ANSWER D. Raising the boom 
 
When rotation of the load may be hazardous, the operator must 
B. Use a longer radius 
C. Caution ...
NCCCO Lattice Boom General Knowledge correct 100%
The part of the load chart governed by stability is based on what percentage of capacity while a crawler crane is working over the side quadrant? - ANSWER A. 75% 
 
The most unstable working quadrant for a crawler crane is the; - ANSWER Side 
 
The lattice boom is designed to take winds of up to 20 mph. from the side plus a full rated load, plus a direct side load equal to what percent of the rated load? - ANSWER 2% 
 
What type of capacity is listed on a crane load chart? - ANSWER Static 
 
If ...
- Package deal
- Exam (elaborations)
- • 7 pages •
The part of the load chart governed by stability is based on what percentage of capacity while a crawler crane is working over the side quadrant? - ANSWER A. 75% 
 
The most unstable working quadrant for a crawler crane is the; - ANSWER Side 
 
The lattice boom is designed to take winds of up to 20 mph. from the side plus a full rated load, plus a direct side load equal to what percent of the rated load? - ANSWER 2% 
 
What type of capacity is listed on a crane load chart? - ANSWER Static 
 
If ...
LOUISIANA CLAIM ADJUSTER SERIES 204 HOMEOWNER INSURANCE EXAM SOLVED 100%
State Of Texas Security officer Level 2 non-commissioned Exam Questions With Correct Answers
State of Texas Security Level II Certification Questions With Correct Answers
MACS 609 CERTIFICATION EXAM QUESTIONS & ANSWERS CORRECT 100%
Michigan Builders License Exam Questions With Correct Answers