NCCER CORE FINAL | 100% Correct Answers | Verified | Latest 2024 Version
Which of these is a true statement regarding safety? - Safety is a learned behavior and attitude. 
A measure of the probability, consequences, and exposure related to an event is referred to as _____. - 
Risk 
When placing a ladder against a platform or roof, the top of the ladder should extend above the point 
where the ladder touches the platform or roof by at least _____. - 3 feet 
One of the most common grounding systems used for protection against accidental electrical shock is 
the _____. ...
- Exam (elaborations)
- • 5 pages •
Which of these is a true statement regarding safety? - Safety is a learned behavior and attitude. 
A measure of the probability, consequences, and exposure related to an event is referred to as _____. - 
Risk 
When placing a ladder against a platform or roof, the top of the ladder should extend above the point 
where the ladder touches the platform or roof by at least _____. - 3 feet 
One of the most common grounding systems used for protection against accidental electrical shock is 
the _____. ...
NCCCO Tower Crane Tests | 100% Correct Answers | Verified | Latest 2024 Version
Splices in rail tracks shall have - Smooth Joints 
Hydraulic systems should have their proper fluid level checked - Daily 
If power fails during operations, the following shouldn't apply - Do your best to finish moving load 
where it was designated to go 
If load is undetermined who is to find out if load weight does not exceed crane rating at radius at which 
the load is to be lifted - Person responsible for lift 
Where should climbing instructions be kept - ON Site 
All climbing operations sh...
- Exam (elaborations)
- • 13 pages •
Splices in rail tracks shall have - Smooth Joints 
Hydraulic systems should have their proper fluid level checked - Daily 
If power fails during operations, the following shouldn't apply - Do your best to finish moving load 
where it was designated to go 
If load is undetermined who is to find out if load weight does not exceed crane rating at radius at which 
the load is to be lifted - Person responsible for lift 
Where should climbing instructions be kept - ON Site 
All climbing operations sh...
NCCCO TEST 2 | 100% Correct Answers | Verified | Latest 2024 Version
When making a multiple crane lift, it is important for the operator to understand that: - The weight 
may increase if the other crane lands the load 
If a crane is not set-up level and the operator swings a load from the high side to the low side, the load 
radius will: - Increase 
Most crane manufacturers reduce load capacity for duty-cycle operations because: - Side loading 
forces may occur 
On who's recommendations should a preventative maintenance program be set-up? - Crane 
manufacturer 
...
- Exam (elaborations)
- • 4 pages •
When making a multiple crane lift, it is important for the operator to understand that: - The weight 
may increase if the other crane lands the load 
If a crane is not set-up level and the operator swings a load from the high side to the low side, the load 
radius will: - Increase 
Most crane manufacturers reduce load capacity for duty-cycle operations because: - Side loading 
forces may occur 
On who's recommendations should a preventative maintenance program be set-up? - Crane 
manufacturer 
...
NCCCO Rigger 1 Study Questions | 100% Correct Answers | Verified | Latest 2024 Version
1. A wire rope that is a 6x19 classification could have how many wires per strand? - 15 through 26 
wires per strand 
2. How often should a synthetic web sling be inspected? - Each day before use 
3. Which considerations should be given to suspend lifting operations with a mobile crane? - Winds 
in excess of 35 mph 
4. What is the term that best describes surface wear on a wire rope sling to rubbing or sliding? - 
Abrasion 
5. Which of the following defects discovered during an inspection would ...
- Exam (elaborations)
- • 6 pages •
1. A wire rope that is a 6x19 classification could have how many wires per strand? - 15 through 26 
wires per strand 
2. How often should a synthetic web sling be inspected? - Each day before use 
3. Which considerations should be given to suspend lifting operations with a mobile crane? - Winds 
in excess of 35 mph 
4. What is the term that best describes surface wear on a wire rope sling to rubbing or sliding? - 
Abrasion 
5. Which of the following defects discovered during an inspection would ...
NCCCO Questions Test 1 | 100% Correct Answers | Verified | Latest 2024 Version
Where is the best location for leveling a crane? - Upperworks 
When determining the "gross load" the best method is: - Get an accurate load weight and add the 
rigging. 
By order of hitch strength, which is the correct answer? - Basket, vertical, choker 
What is the purpose of using a jib? - Increase height 
When taking a side strain on a boom, what concerns the operator most? - Boom damage 
You should always have at least how many wraps on a hoist drum? - 2 
On a load chart, values above the ...
- Exam (elaborations)
- • 4 pages •
Where is the best location for leveling a crane? - Upperworks 
When determining the "gross load" the best method is: - Get an accurate load weight and add the 
rigging. 
By order of hitch strength, which is the correct answer? - Basket, vertical, choker 
What is the purpose of using a jib? - Increase height 
When taking a side strain on a boom, what concerns the operator most? - Boom damage 
You should always have at least how many wraps on a hoist drum? - 2 
On a load chart, values above the ...
NCCCO MOBILE CRANE Tests | 100% Correct Answers | Verified | Latest 2024 Version
1. What action does a signal person intend the operator to perform if he extends his arm at shoulder 
height, makes a fist with his hand, and sticks his/her thumb up? 
a. Boom down 
b. Swing 
c. Boom up 
d. Extend boom - c. 
2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in order 
for the gross ratings in the load chart to remain valid? 
a. 1% 
b. 2% 
c. 5% 
d. 8% - a. 
3. The load line of the crane you're operating contacts an energized power line. ...
- Exam (elaborations)
- • 16 pages •
1. What action does a signal person intend the operator to perform if he extends his arm at shoulder 
height, makes a fist with his hand, and sticks his/her thumb up? 
a. Boom down 
b. Swing 
c. Boom up 
d. Extend boom - c. 
2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in order 
for the gross ratings in the load chart to remain valid? 
a. 1% 
b. 2% 
c. 5% 
d. 8% - a. 
3. The load line of the crane you're operating contacts an energized power line. ...
NCCCO MOBILE CRANE TESTS 2024 | 100% Correct Answers | Verified | Latest 2024 Version
1. What action does a signal person intend the operator to perform if he extends his arm at shoulder 
height, makes a fist with his hand, and sticks his/her thumb up? 
a. Boom down 
b. Swing 
c. Boom up 
d. Extend boom - c. 
2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in order 
for the gross ratings in the load chart to remain valid? 
a. 1% 
b. 2% 
c. 5% 
d. 8% - a. 
3. The load line of the crane you're operating contacts an energized power line. ...
- Exam (elaborations)
- • 16 pages •
1. What action does a signal person intend the operator to perform if he extends his arm at shoulder 
height, makes a fist with his hand, and sticks his/her thumb up? 
a. Boom down 
b. Swing 
c. Boom up 
d. Extend boom - c. 
2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in order 
for the gross ratings in the load chart to remain valid? 
a. 1% 
b. 2% 
c. 5% 
d. 8% - a. 
3. The load line of the crane you're operating contacts an energized power line. ...
NCCCO Lattice Boom General Knowledge | 100% Correct Answers | Verified | Latest 2024 Version
The lattice boom is designed to take winds of up to 20 mph. from the side plus a full rated load, plus a 
direct side load equal to what percent of the rated load? - 2% 
The part of the load chart governed by stability is based on what percentage of capacity while a crawler 
crane is working over the side quadrant? - A. 75% 
The most unstable working quadrant for a crawler crane is the; - Side 
What type of capacity is listed on a crane load chart? - Static 
If the manufacture of a particular cr...
- Exam (elaborations)
- • 6 pages •
The lattice boom is designed to take winds of up to 20 mph. from the side plus a full rated load, plus a 
direct side load equal to what percent of the rated load? - 2% 
The part of the load chart governed by stability is based on what percentage of capacity while a crawler 
crane is working over the side quadrant? - A. 75% 
The most unstable working quadrant for a crawler crane is the; - Side 
What type of capacity is listed on a crane load chart? - Static 
If the manufacture of a particular cr...
NCCCO Final Test | 100% Correct Answers | Verified | Latest 2024 Version
Which area do truck cranes without a 5th outrigger generally have no lifting capacity unless the 
manufacturer states otherwise? - The front 
What is the definition of "operating radius?" - The distance from the center of rotation of the crane 
to the center of gravity of the load 
What applies to the capacities below the bold line shown on a load chart? - They are based on the 
stability of the crane 
In which quadrant are rough terrain crane capacities generally greater? - Over the front 
Wh...
- Exam (elaborations)
- • 5 pages •
Which area do truck cranes without a 5th outrigger generally have no lifting capacity unless the 
manufacturer states otherwise? - The front 
What is the definition of "operating radius?" - The distance from the center of rotation of the crane 
to the center of gravity of the load 
What applies to the capacities below the bold line shown on a load chart? - They are based on the 
stability of the crane 
In which quadrant are rough terrain crane capacities generally greater? - Over the front 
Wh...
NCCCO CORE Questions | 100% Correct Answers | Verified | Latest 2024 Version
Before leveling a mobile crane on outriggers, an operator should ensure: - there is no weight of the 
crane bearing on any tires 
Operating a mobile crane with a long boom, on uneven ground, what support condition should be 
considered? - Keeping 90 degree angle between cylinder rod and pad 
What is the primary purpose fir a rooster sheave or auxiliary boom point sheave? - Separate the 
boom hoist lines 
How many randomly broken wires in a lay length must there be on a mobile cranes hoist line, ...
- Exam (elaborations)
- • 11 pages •
Before leveling a mobile crane on outriggers, an operator should ensure: - there is no weight of the 
crane bearing on any tires 
Operating a mobile crane with a long boom, on uneven ground, what support condition should be 
considered? - Keeping 90 degree angle between cylinder rod and pad 
What is the primary purpose fir a rooster sheave or auxiliary boom point sheave? - Separate the 
boom hoist lines 
How many randomly broken wires in a lay length must there be on a mobile cranes hoist line, ...
ARM 401 Final Exam 2024 Questions & Answers | 100% Correct | Verified
None of the questions were on the test take . This was a waste of money and time, truly.
Dysrhythmia – Basic A
trash
FTCE HEALTH K-12 QUESTIONS AND ANSWERS 100% PASS
Very pleased with the study material. Thank you kindly. Highly recommend.
NCSO Exam 100% Correct Answers | Verified | Latest 2024 Version
Intro to Explosive Safety Management for Safety Pros (Cert) (AMMO 107) Exam 2023