logo-home

Academicmaterials

On this page, you find all documents, package deals, and flashcards offered by seller ACADEMICMATERIALS.

Community

  • Followers
  • Following

45 Reviews received

9869 items

Boat Operations / Crane Questions and Answers Fully Solved 100%

(0)
$7.99
0x  sold

Name all cranes onboard LPD 25? - Answer-Articulating knuckle boom Crane , Sideport cargo Crane , Well deck bridge Crane , Aviation bridge Crane , Aviation maintenance Crane What is the purpose of the coxswain? - Answer-Responsible for maintaining the order on board , and all navigational equipment What are the minimum required positions for a boat crew? - Answer-5 , Coxswain , Boat officer , Engineer , Bow hook , Sar swimmer What is the max personnel capacity for the RHIBS? - Answer-26 f...

i x
  • Exam (elaborations)
  •  • 2 pages • 
  • by ACADEMICMATERIALS • 
  • uploaded  20-11-2024
Quick View
i x

Overhead Crane Test Questions and Answers Fully Solved 100%

(0)
$7.99
0x  sold

According to OSHA, how many wraps must be left on the hoist drum of an overhead crane with the hook at its lowest position? - Answer-3 wraps Before leaving an overhead crane unattended, attached loads should be? - Answerlowered to the floor A floor weight limitation is posted at 700 pounds per square foot maximum. Before lowering a load down onto this floor that is calculated at 900 pounds per square foot, what must be done? - Answer-install cribbing to increase surface bearing area An obj...

i x
  • Exam (elaborations)
  •  • 7 pages • 
  • by ACADEMICMATERIALS • 
  • uploaded  20-11-2024
Quick View
i x

Mobile Crane Questions Test #1 Questions and Answers Fully Solved 100%

(0)
$7.99
0x  sold

If replacing the hoist line wire rope on a crane, how do you determine the size or type of wire rope to use? - Answer-Use manufacturer's operators manual or load chart. When working near powerlines when is a signal person required? - Answer-When crane moves within booms length of powerlines. The term "Upperworks" or "Superstructure" refers to the area of the crane: - AnswerAbove the turntable. When taking a side strain on a boom, what concerns the operator most? - AnswerBoom ...

i x
  • Exam (elaborations)
  •  • 4 pages • 
  • by ACADEMICMATERIALS • 
  • uploaded  20-11-2024
Quick View
i x

Crane practice test #3 Questions & Answers Latest Update

(0)
$7.99
0x  sold

ancillary lifting attachments capacities A. Are always the same as the crane capacity B. May be less than the crane rating C. Do not matter in calculating capacity D. Area added to net load to determine gross load - Answer-B Who has the authority to determine that overhead power line are de-energized? A. The crane owner B. The job supervisor C. The power utility D. The crane operator - Answer-C Prior to setting up the crane for a lift, what is one thing the operator should do? A. Fill...

i x
  • Exam (elaborations)
  •  • 8 pages • 
  • by ACADEMICMATERIALS • 
  • uploaded  20-11-2024
Quick View
i x

CATEGORY 3 NON-CAB OPERATED TEST QUESTIONS & ANSWERS

(0)
$7.99
0x  sold

What is the bridge crane communications hand signal pictured, with the palms up, fingers closed; thumb pointing in the direction of motion, and jerking horizontally? - ️️Trolley travel Is it necessary for the operator to see the load or work area? - ️️Not if there is a designated signal person who is in control of the lift and is in view of the operator, or if the signal giver is in constant radio contact with the operator. Components that control, restrain, or position the load, a...

i x
  • Exam (elaborations)
  •  • 6 pages • 
  • by ACADEMICMATERIALS • 
  • uploaded  20-11-2024
Quick View
i x

Mobile Crane NCCER Study Guide Questions and Answers Fully Solved 100%

(0)
$7.99
0x  sold

When making a multiple crane lift it is important for the operator to understand that - Answer-the weight may increase if the other crane lands the load first If the crane's jib is offset 5 degrees as opposed to an original 15 degrees and the boom angle remains constant you would expect the load radius to do what? - Answer-To be reduced When operating truck cranes what is the most unstable allowable quadrant of operation? - Answer-Side When working near power lines when is a signal per...

i x
  • Exam (elaborations)
  •  • 4 pages • 
  • by ACADEMICMATERIALS • 
  • uploaded  20-11-2024
Quick View
i x

Tower Crane Questions and Answers Graded A+ 2025 Update

(0)
$7.99
0x  sold

Slings shall be removed from service if hooks are cracked or have been opened more than_______ percent of the normal throat opening measured at the narrowest point. - Answer-15 What is the minimum allowable distance from the crane and power lines under 50 kV? - Answer-10 ft According to ASME B30.3 when working near powerlines where should caution stickers be installed? - Answer-Operator station and at the base of the crane According to OSHA a frequent inspection is: - Answer-Daily to mont...

i x
  • Exam (elaborations)
  •  • 8 pages • 
  • by ACADEMICMATERIALS • 
  • uploaded  20-11-2024
Quick View
i x

American Crane School (Core Practice Test 1) Questions and Answers Fully Solved 100%

(0)
$7.99
0x  sold

You are lifting a load directly under the hook. As you put tension on it and the load lifts from the ground it swings away from the crane. What caused the increase in load radius as should have been anticipated before the lift took place? - Answer-Boom deflection A crane that is set up properly should have the tires off the supporting surface and the blocking under the float pads should be what? - Answer-Sufficient to support the crane and the load Which matches the appropriate load chart ...

i x
  • Exam (elaborations)
  •  • 4 pages • 
  • by ACADEMICMATERIALS • 
  • uploaded  20-11-2024
Quick View
i x

American Crane School (Core Practice Test 3) (2025 )Latest Questions With Passed Solutions!!

(0)
$7.99
0x  sold

What is the acceptable maximum number of broken wires at an end connecting before standing wire rope must be replaced? - Answer-Maximum number is 1 According to ANSI B30.5, the minimum distance the flange of the drum shall extend over the top layer of wire rope is? - Answer-1/2 an inch In what case is someone allowed to make modifications to the crane? - Answer-When manufacturer approves it in writing When leaving telescopic boom cranes unattended overnight or for longer periods, the boom...

i x
  • Exam (elaborations)
  •  • 4 pages • 
  • by ACADEMICMATERIALS • 
  • uploaded  20-11-2024
Quick View
i x

American Crane School (Core Practice Test 2) Questions with Answers (All Answers Correct)

(0)
$7.99
0x  sold

Examples of a duty cycle operation high speed steel erection, magnet operations, clamshell operations and? - Answer-High volume concrete placement When preforming a pick and carry operation, an operator should keep the boom? - Answer-In line with the direction of travel When operating a crane that does not have the telescopic boom sections extended equally, which of the sections would likely become overloaded? - Answer-The longest section Based only on permissible line pull of 13,920 lbs,...

i x
  • Exam (elaborations)
  •  • 4 pages • 
  • by ACADEMICMATERIALS • 
  • uploaded  20-11-2024
Quick View
i x