Academicmaterials
On this page, you find all documents, package deals, and flashcards offered by seller ACADEMICMATERIALS.
- 9031
- 0
- 824
Community
- Followers
- Following
45 Reviews received
9869 items
Boat Operations / Crane Questions and Answers Fully Solved 100%
Name all cranes onboard LPD 25? - Answer-Articulating knuckle boom Crane , Sideport 
cargo Crane , Well deck bridge Crane , Aviation bridge Crane , Aviation maintenance 
Crane 
What is the purpose of the coxswain? - Answer-Responsible for maintaining the order 
on board , and all navigational equipment 
What are the minimum required positions for a boat crew? - Answer-5 , Coxswain , Boat 
officer , Engineer , Bow hook , Sar swimmer 
What is the max personnel capacity for the RHIBS? - Answer-26 f...
- Exam (elaborations)
- • 2 pages •
Name all cranes onboard LPD 25? - Answer-Articulating knuckle boom Crane , Sideport 
cargo Crane , Well deck bridge Crane , Aviation bridge Crane , Aviation maintenance 
Crane 
What is the purpose of the coxswain? - Answer-Responsible for maintaining the order 
on board , and all navigational equipment 
What are the minimum required positions for a boat crew? - Answer-5 , Coxswain , Boat 
officer , Engineer , Bow hook , Sar swimmer 
What is the max personnel capacity for the RHIBS? - Answer-26 f...
Overhead Crane Test Questions and Answers Fully Solved 100%
According to OSHA, how many wraps must be left on the hoist drum of an overhead 
crane with the hook at its lowest position? - Answer-3 wraps 
Before leaving an overhead crane unattended, attached loads should be? - Answerlowered to the floor 
A floor weight limitation is posted at 700 pounds per square foot maximum. Before 
lowering a load down onto this floor that is calculated at 900 pounds per square foot, 
what must be done? - Answer-install cribbing to increase surface bearing area 
An obj...
- Exam (elaborations)
- • 7 pages •
According to OSHA, how many wraps must be left on the hoist drum of an overhead 
crane with the hook at its lowest position? - Answer-3 wraps 
Before leaving an overhead crane unattended, attached loads should be? - Answerlowered to the floor 
A floor weight limitation is posted at 700 pounds per square foot maximum. Before 
lowering a load down onto this floor that is calculated at 900 pounds per square foot, 
what must be done? - Answer-install cribbing to increase surface bearing area 
An obj...
Mobile Crane Questions Test #1 Questions and Answers Fully Solved 100%
If replacing the hoist line wire rope on a crane, how do you determine the size or type of 
wire rope to use? - Answer-Use manufacturer's operators manual or load chart. 
When working near powerlines when is a signal person required? - Answer-When crane 
moves within booms length of powerlines. 
The term "Upperworks" or "Superstructure" refers to the area of the crane: - AnswerAbove the turntable. 
When taking a side strain on a boom, what concerns the operator most? - AnswerBoom ...
- Exam (elaborations)
- • 4 pages •
If replacing the hoist line wire rope on a crane, how do you determine the size or type of 
wire rope to use? - Answer-Use manufacturer's operators manual or load chart. 
When working near powerlines when is a signal person required? - Answer-When crane 
moves within booms length of powerlines. 
The term "Upperworks" or "Superstructure" refers to the area of the crane: - AnswerAbove the turntable. 
When taking a side strain on a boom, what concerns the operator most? - AnswerBoom ...
Crane practice test #3 Questions & Answers Latest Update
ancillary lifting attachments capacities 
A. Are always the same as the crane capacity 
B. May be less than the crane rating 
C. Do not matter in calculating capacity 
D. Area added to net load to determine gross load - Answer-B 
Who has the authority to determine that overhead power line are de-energized? 
A. The crane owner 
B. The job supervisor 
C. The power utility 
D. The crane operator - Answer-C 
Prior to setting up the crane for a lift, what is one thing the operator should do? 
A. Fill...
- Exam (elaborations)
- • 8 pages •
ancillary lifting attachments capacities 
A. Are always the same as the crane capacity 
B. May be less than the crane rating 
C. Do not matter in calculating capacity 
D. Area added to net load to determine gross load - Answer-B 
Who has the authority to determine that overhead power line are de-energized? 
A. The crane owner 
B. The job supervisor 
C. The power utility 
D. The crane operator - Answer-C 
Prior to setting up the crane for a lift, what is one thing the operator should do? 
A. Fill...
CATEGORY 3 NON-CAB OPERATED TEST QUESTIONS & ANSWERS
What is the bridge crane communications hand signal pictured, with the palms up, 
fingers closed; thumb pointing in the direction of motion, and jerking horizontally? - 
️️Trolley travel 
Is it necessary for the operator to see the load or work area? - ️️Not if there is a 
designated signal person who is in control of the lift and is in view of the operator, or if 
the signal giver is in constant radio contact with the operator. 
Components that control, restrain, or position the load, a...
- Exam (elaborations)
- • 6 pages •
What is the bridge crane communications hand signal pictured, with the palms up, 
fingers closed; thumb pointing in the direction of motion, and jerking horizontally? - 
️️Trolley travel 
Is it necessary for the operator to see the load or work area? - ️️Not if there is a 
designated signal person who is in control of the lift and is in view of the operator, or if 
the signal giver is in constant radio contact with the operator. 
Components that control, restrain, or position the load, a...
Mobile Crane NCCER Study Guide Questions and Answers Fully Solved 100%
When making a multiple crane lift it is important for the operator to understand that - 
Answer-the weight may increase if the other crane lands the load first 
If the crane's jib is offset 5 degrees as opposed to an original 15 degrees and the boom 
angle remains constant you would expect the load radius to do what? - Answer-To be 
reduced 
When operating truck cranes what is the most unstable allowable quadrant of 
operation? - Answer-Side 
When working near power lines when is a signal per...
- Exam (elaborations)
- • 4 pages •
When making a multiple crane lift it is important for the operator to understand that - 
Answer-the weight may increase if the other crane lands the load first 
If the crane's jib is offset 5 degrees as opposed to an original 15 degrees and the boom 
angle remains constant you would expect the load radius to do what? - Answer-To be 
reduced 
When operating truck cranes what is the most unstable allowable quadrant of 
operation? - Answer-Side 
When working near power lines when is a signal per...
Tower Crane Questions and Answers Graded A+ 2025 Update
Slings shall be removed from service if hooks are cracked or have been opened more 
than_______ percent of the normal throat opening measured at the narrowest point. - 
Answer-15 
What is the minimum allowable distance from the crane and power lines under 50 kV? - 
Answer-10 ft 
According to ASME B30.3 when working near powerlines where should caution stickers 
be installed? - Answer-Operator station and at the base of the crane 
According to OSHA a frequent inspection is: - Answer-Daily to mont...
- Exam (elaborations)
- • 8 pages •
Slings shall be removed from service if hooks are cracked or have been opened more 
than_______ percent of the normal throat opening measured at the narrowest point. - 
Answer-15 
What is the minimum allowable distance from the crane and power lines under 50 kV? - 
Answer-10 ft 
According to ASME B30.3 when working near powerlines where should caution stickers 
be installed? - Answer-Operator station and at the base of the crane 
According to OSHA a frequent inspection is: - Answer-Daily to mont...
American Crane School (Core Practice Test 1) Questions and Answers Fully Solved 100%
You are lifting a load directly under the hook. As you put tension on it and the load lifts 
from the ground it swings away from the crane. What caused the increase in load radius 
as should have been anticipated before the lift took place? - Answer-Boom deflection 
A crane that is set up properly should have the tires off the supporting surface and the 
blocking under the float pads should be what? - Answer-Sufficient to support the crane 
and the load 
Which matches the appropriate load chart ...
- Exam (elaborations)
- • 4 pages •
You are lifting a load directly under the hook. As you put tension on it and the load lifts 
from the ground it swings away from the crane. What caused the increase in load radius 
as should have been anticipated before the lift took place? - Answer-Boom deflection 
A crane that is set up properly should have the tires off the supporting surface and the 
blocking under the float pads should be what? - Answer-Sufficient to support the crane 
and the load 
Which matches the appropriate load chart ...
American Crane School (Core Practice Test 3) (2025 )Latest Questions With Passed Solutions!!
What is the acceptable maximum number of broken wires at an end connecting before 
standing wire rope must be replaced? - Answer-Maximum number is 1 
According to ANSI B30.5, the minimum distance the flange of the drum shall extend 
over the top layer of wire rope is? - Answer-1/2 an inch 
In what case is someone allowed to make modifications to the crane? - Answer-When 
manufacturer approves it in writing 
When leaving telescopic boom cranes unattended overnight or for longer periods, the 
boom...
- Exam (elaborations)
- • 4 pages •
What is the acceptable maximum number of broken wires at an end connecting before 
standing wire rope must be replaced? - Answer-Maximum number is 1 
According to ANSI B30.5, the minimum distance the flange of the drum shall extend 
over the top layer of wire rope is? - Answer-1/2 an inch 
In what case is someone allowed to make modifications to the crane? - Answer-When 
manufacturer approves it in writing 
When leaving telescopic boom cranes unattended overnight or for longer periods, the 
boom...
American Crane School (Core Practice Test 2) Questions with Answers (All Answers Correct)
Examples of a duty cycle operation high speed steel erection, magnet operations, 
clamshell operations and? - Answer-High volume concrete placement 
When preforming a pick and carry operation, an operator should keep the boom? - 
Answer-In line with the direction of travel 
When operating a crane that does not have the telescopic boom sections extended 
equally, which of the sections would likely become overloaded? - Answer-The longest 
section 
Based only on permissible line pull of 13,920 lbs,...
- Exam (elaborations)
- • 4 pages •
Examples of a duty cycle operation high speed steel erection, magnet operations, 
clamshell operations and? - Answer-High volume concrete placement 
When preforming a pick and carry operation, an operator should keep the boom? - 
Answer-In line with the direction of travel 
When operating a crane that does not have the telescopic boom sections extended 
equally, which of the sections would likely become overloaded? - Answer-The longest 
section 
Based only on permissible line pull of 13,920 lbs,...
Rhode Island Journeyman Plumber Exam Questions With 100% Correct Answers.
Texas Inspector Study Guide Rated 100% Correct!!
Texas Government 2306 - Exam 3 (100% correct and graded A+)
Kappa Beta Gamma Questions With Complete Solutions!!
BIO 156 EXAM 1 QUESTIONS WITH 100 % CORRECT ANSWERS | VERIFIED