When hoisting personnel - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about When hoisting personnel? On this page you'll find 443 study documents about When hoisting personnel.

All 443 results

Sort by

Hoisting License (full) questions and solutions Popular
  • Hoisting License (full) questions and solutions

  • Exam (elaborations) • 6 pages • 2024
  • Hoisting License (full) questions and solutions What is the purpose of the 520: C.M.R. 6:00? to establish rules and regulations for the safety of the public What type of equipment requires a hoisting license? equipment that has minimum capability of hoisting the load higher than 10' feet or equipment that has the capability of lifting loads greater than 500 pounds or equipment that has capacity of the becket exceeds 1/4 cubic yard What does A.S.M.E. stand for? American Society ...
    (0)
  • $12.49
  • 1x sold
  • + learn more
NCCCO Core Practice Exam (2024 / 2025 Update) Questions and 100% Correct Verified Answers | Grade A Popular
  • NCCCO Core Practice Exam (2024 / 2025 Update) Questions and 100% Correct Verified Answers | Grade A

  • Exam (elaborations) • 24 pages • 2024 Popular
  • Available in package deal
  • NCCCO Core Practice Exam (2024 / 2025 Update) Questions and 100% Correct Verified Answers | Grade A Q: From which two points should the boom be measured? Answer: From the boom hinge pins to the center of the boom tip sheave Q: What is the preferred method of installing wire rope from a reel onto a hoist drum? Answer: The rope runs from the top of the reel to the top of the drum Q: Over which quadrant are truck crane capacities usually greater? Answer: Over the rear. Q: According to OSHA, which a...
    (0)
  • $7.99
  • 1x sold
  • + learn more
NCCCO Core Exam Prep (2023/ 2024 Update) Questions and 100% Correct Verified Answers| Grade A
  • NCCCO Core Exam Prep (2023/ 2024 Update) Questions and 100% Correct Verified Answers| Grade A

  • Exam (elaborations) • 31 pages • 2023
  • NCCCO Core Exam Prep (2023/ 2024 Update) Questions and 100% Correct Verified Answers| Grade A Q: What three functions will not work after two-blocking a crane that has a prevention system? Answer: Boom down, extend the boom and hoist Q: Boom angle on a telescoping boom is measured from above or below horizontal to the ? Answer: Longitudinal axis of the boom base section Q: The line pull of the innermost layer on the hoist drum is than...
    (7)
  • $10.99
  • 8x sold
  • + learn more
NCCCO Mobile Crane Exam (2023/ 2024) Questions and 100% Correct Verified Answers| Grade A
  • NCCCO Mobile Crane Exam (2023/ 2024) Questions and 100% Correct Verified Answers| Grade A

  • Exam (elaborations) • 24 pages • 2023
  • NCCCO Mobile Crane Exam (2023/ 2024) Questions and 100% Correct Verified Answers| Grade A Q: In which quadrant are rough terrain crane capacities generally greater? a. Over the front b. Over the rear c. Over the right side d. Over the left side Answer: a. Q: According to federal requirements, under what conditions is it okay for a person to ride the headache ball? a. When there is no other way to gain access b. When the lift has been approved by an engineer c. When ...
    (4)
  • $10.49
  • 3x sold
  • + learn more
NCCCO CORE FINAL EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% VERIFIED)
  • NCCCO CORE FINAL EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% VERIFIED)

  • Exam (elaborations) • 13 pages • 2024
  • Available in package deal
  • NCCCO CORE FINAL EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% VERIFIED) Operating a mobile crane with a long boom, on uneven ground, what support condition should be considered? - ANSWER Keeping 90 degree angle between cylinder rod and pad What is the primary purpose fir a rooster sheave or auxiliary boom point sheave? - ANSWER Separate the boom hoist lines How many randomly broken wires in a lay length must there be on a mobile cranes hoist line, before it should be removed fro...
    (0)
  • $14.99
  • 1x sold
  • + learn more
OECP Exam Questions With 100% Complete Solutions
  • OECP Exam Questions With 100% Complete Solutions

  • Exam (elaborations) • 18 pages • 2024
  • OECP Exam Questions With 100% Complete Solutions What are the four different types of crane signals? - Answer- Hand Voice Audible New The shaded area on a load chart indicates _______? - Answer- A structural chart The minimum distance to a power line of unknown voltage is ? - Answer- 50' When hoisting personnel and have known voltage, can you use Table A and get closer than 20'? - Answer- Never! What is the minimum tale swing clearance requirement - Answer- 2' What kind of rigger i...
    (0)
  • $12.49
  • 1x sold
  • + learn more
NCCCO MOBILE CRANE questions with correct answers
  • NCCCO MOBILE CRANE questions with correct answers

  • Exam (elaborations) • 20 pages • 2023
  • Available in package deal
  • 1. What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? a. Boom down b. Swing c. Boom up d. Extend boom - Answer c. 2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratings in the load chart to remain valid? a. 1% b. 2% c. 5% d. 8% - Answer a. 3. The load line of the crane you're operating contacts ...
    (0)
  • $13.49
  • 1x sold
  • + learn more
Tower Crane (Questions and Answers)
  • Tower Crane (Questions and Answers)

  • Exam (elaborations) • 8 pages • 2023
  • Which of the following OSHA regulations govern suspended personnel platforms? correct answers OSHA 1926.1431 According to ASME B30.3 The prohibited zone for power lines that are 60 kV is correct answers 15 ft According to ASME B30.3, load hoist rotation resistant wire rope has a design factor of correct answers 5 to 1 According to ASME B30.3 when Lifting a suspended personnel platform design factor for the rigging hardware is correct answers 5 to 1 According to ASME B30.3 Load hoist ...
    (0)
  • $10.39
  • 1x sold
  • + learn more
NCCCO MOBILE CRANE CORRECT 100%
  • NCCCO MOBILE CRANE CORRECT 100%

  • Exam (elaborations) • 26 pages • 2024
  • 1. What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? a. Boom down b. Swing c. Boom up d. Extend boom - ANSWER c. 2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratings in the load chart to remain valid? a. 1% b. 2% c. 5% d. 8% - ANSWER a.
    (0)
  • $12.99
  • + learn more
nccco exam 2023 with 100% correct answers
  • nccco exam 2023 with 100% correct answers

  • Exam (elaborations) • 5 pages • 2023
  • Boom up What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? 1% When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratings in the load chart to remain valid? Stay in the cab until the lines are de-energized The load line of the crane you're operating contacts an energized power line. There's no sign of any ot...
    (0)
  • $12.99
  • 1x sold
  • + learn more