Tie line frequency bias - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Tie line frequency bias? On this page you'll find 205 study documents about Tie line frequency bias.

All 205 results

Sort by

NERC Final Assessment Exam Correct answers (Already GRADED A)
  • NERC Final Assessment Exam Correct answers (Already GRADED A)

  • Exam (elaborations) • 98 pages • 2023
  • When using a dynamic schedule and the energy profile in an hour is >250 MW and the actual hourly integration deviates from the hourly energy profile by ____ the tag must be modified. A. 100 MW B. 10% C. 50 MW D. 25% B. 10% Dry steam plants, flash steam plants, and binary cycle power plants are the three main types of what kind of generating plant? A. Nuclear generators B. Combustion turbine generators C. Geothermal generators D. Hydroelectric generators C. Geothermal generators...
    (1)
  • $11.99
  • 1x sold
  • + learn more
NERC Prep - Bal, Int, & Trans Exam Questions and Answers 2023-2024 Graded A+
  • NERC Prep - Bal, Int, & Trans Exam Questions and Answers 2023-2024 Graded A+

  • Exam (elaborations) • 22 pages • 2023
  • NERC Prep - Bal, Int, & Trans Exam Questions and Answers Graded A+. What group can approve a change in the Disturbance Recovery Period for an Interconnection? a. NERC Interconnection Working Group b. NERC Operating Committee c. NERC Regional Council d. NERC Disturbance Analysis Working Group c. Check targets and equipment - What is the first thing an operator should do after a relay operation? a. Check power system stabilizers b. Notify adjacent Transmission and Balancing areas c. Che...
    (0)
  • $15.49
  • 1x sold
  • + learn more
NERC book quiz with correct answers graded A+
  • NERC book quiz with correct answers graded A+

  • Exam (elaborations) • 18 pages • 2023
  • Available in package deal
  • You are an external BA with a frequency bais of 20 MW/.1 Hz that sees a frequency of 60.02 due to a large loss of load in the contingent BA. If your generator governor control systems responded to the frequency deviation approximately how much of a generation change would you BA experience? - Answer -4MW Net actual interchange minus Net scheduled interchange is what? - Answer Inadvertent interchange Suppose your interconnection operators at 59.97 Hz from one minute after midnight to noon ...
    (0)
  • $12.49
  • + learn more
NERC Text Questions And Answers
  • NERC Text Questions And Answers

  • Exam (elaborations) • 35 pages • 2024
  • Available in package deal
  • NERC Text Questions And Answers Operating reserve may be provided by which of the following? A. LTCs B. Capacitor banks C. Voltage regulators D. Interruptible loads - ANS-D. Interruptible loads Which of the following is the responsibility of a reserve sharing group (RSG)? A. Complying with DCS as if it was a single control area B. Proving regulation service for neighboring RSGs C. Ensuring each control area in the group maintains 50% blackstart capability D. Complying with the control ...
    (0)
  • $15.09
  • + learn more
SOS NERC Prep - Reliability Exam| 200Questions and Correct Answers.
  • SOS NERC Prep - Reliability Exam| 200Questions and Correct Answers.

  • Exam (elaborations) • 54 pages • 2023
  • SOS NERC Prep - Reliability Exam| 200Questions and Correct Answers. The Reliability Coordinator just informed you of a slow time error correction which will begin at the top of the next hour. Your EMS system will not let you change your scheduled frequency. Your Frequency Bias Setting is -100 MW/.1Hz. What action should you take? A) Increase Net Interchange Schedule by 20 MWs. B) Inform the Reliability Coordinator that you cannot participate in the time error correction. C) Decrease Net ...
    (0)
  • $12.99
  • + learn more
PJM Test Questions and Answers  Already Passed
  • PJM Test Questions and Answers Already Passed

  • Exam (elaborations) • 54 pages • 2024
  • Available in package deal
  • PJM Test Questions and Answers Already Passed Which of the following balancing control modes is used by PJM under normal operations? Tie-Line Bias Which of the following influences does PJM consider when performing their system load forecast? Weather Conditions & Day of the Week All of the following are limits that must be submitted to PJM for generating units EXCEPT: 1. Eco Min 2. Eco Max 3. Emergency Max 4. Dynamic Instability Dynamic Instability If PJM experienced an ...
    (0)
  • $11.99
  • + learn more
SOS NERC Prep - Reliability Exam| 200Questions and Correct Answers.
  • SOS NERC Prep - Reliability Exam| 200Questions and Correct Answers.

  • Exam (elaborations) • 54 pages • 2023
  • SOS NERC Prep - Reliability Exam| 200Questions and Correct Answers. The Reliability Coordinator just informed you of a slow time error correction which will begin at the top of the next hour. Your EMS system will not let you change your scheduled frequency. Your Frequency Bias Setting is -100 MW/.1Hz. What action should you take? A) Increase Net Interchange Schedule by 20 MWs. B) Inform the Reliability Coordinator that you cannot participate in the time error correction. C) Decrease Net ...
    (0)
  • $14.99
  • + learn more
NERC Text Questions And Answers
  • NERC Text Questions And Answers

  • Exam (elaborations) • 35 pages • 2024
  • NERC Text Questions And Answers Operating reserve may be provided by which of the following? A. LTCs B. Capacitor banks C. Voltage regulators D. Interruptible loads - ANS-D. Interruptible loads Which of the following is the responsibility of a reserve sharing group (RSG)? A. Complying with DCS as if it was a single control area B. Proving regulation service for neighboring RSGs C. Ensuring each control area in the group maintains 50% blackstart capability D. Complying with the control ...
    (0)
  • $15.99
  • + learn more
2024 EPSR NERC questions & answers. (A+ Guaranteed)
  • 2024 EPSR NERC questions & answers. (A+ Guaranteed)

  • Exam (elaborations) • 29 pages • 2023
  • You are an external BA with a frequency bias of 20MW/0.1Hz that sees a frequency of 60.02 Hz due to a large loss of load in the contingent BA. If your generator governor control systems respond to this frequency deviation, appx. how much of a generation change would your BA experience? a. 1.2 MW b. -4 MW c. -40 MW d. +4 MW correct answers d. +4 MW Net Actual Interchange minus Net Scheduled Interchange is what? a. Always equal to the frequency bias contribution b. The ACE Equation c...
    (0)
  • $13.49
  • + learn more
Sos Nerc Prep - Reliability Exam With 100 Questions with Correct Answers.
  • Sos Nerc Prep - Reliability Exam With 100 Questions with Correct Answers.

  • Exam (elaborations) • 54 pages • 2023
  • Sos Nerc Prep - Reliability Exam With 100 Questions with Correct Answers. The Reliability Coordinator just informed you of a slow time error correction which will begin at the top of the next hour. Your EMS system will not let you change your scheduled frequency. Your Frequency Bias Setting is -100 MW/.1Hz. What action should you take? A) Increase Net Interchange Schedule by 20 MWs. B) Inform the Reliability Coordinator that you cannot participate in the time error correction. C) Decreas...
    (0)
  • $12.99
  • + learn more