NERC Transmission Practice Test, Exam Q&As, A+ Guide
- Exam (elaborations) • 18 pages • 2023
-
Available in package deal
-
- $13.04
- 1x sold
- + learn more
NERC Transmission Practice Test, Exam Q&As, A+ Guide-Station #1 is at 539KV and station #2 is at 534 KV. Which direction will the MVAR typically flow? 
A. From station #1 to station #2 
B. From station #2 to station #1 
C. Downhill based on power angle 
D. Uphill based on power angle - A. From station #1 to station #2 
 
Each transmission operator shall arrange for supply of _____ resources within its boundaries to protect the voltage levels under contingency conditions 
A. Transmission 
B. Gene...
-
NERC Prep Test Questions with Complete Solutions Rated A+
- Exam (elaborations) • 57 pages • 2023
- Available in package deal
-
- $14.49
- + learn more
1. If a 500 kV transmission line with a surge impedance loading of 800 MW is currently loaded at 
1400 MW, which of the following events would most likely occur? 
a. Generator MVAR output would increase 
b. All system capacitors would trip off-line 
c. Generator MVAR output would decrease 
d. All automatic reactors would connect to the system -Answer a. Generator MVAR output 
would increase 
2. When system conditions are such that emergency procedures are expected to be 
implemented, which of th...
-
NERC PREP TEST 101 questions with correct answers
- Exam (elaborations) • 66 pages • 2023
- Available in package deal
-
- $15.49
- + learn more
1. If a 500 kV transmission line with a surge impedance loading of 800 MW is currently loaded at 1400 MW, which of the following events would most likely occur? 
 
a. Generator MVAR output would increase 
b. All system capacitors would trip off-line 
c. Generator MVAR output would decrease 
d. All automatic reactors would connect to the system CORRECT ANSWER a. Generator MVAR output would increase 
 
2. When system conditions are such that emergency procedures are expected to be implemented, whi...
-
NERC CERTIFICATION FINAL EXAM QUESTIONS AND ANSWERS 2024| 100% CORRECT DETAILED ANSWERS WITH RATIONALES/ALREADY GRADED A+
- Exam (elaborations) • 49 pages • 2024
-
- $12.49
- + learn more
NERC CERTIFICATION FINAL EXAM QUESTIONS AND ANSWERS 2024| 100% CORRECT DETAILED ANSWERS WITH RATIONALES/ALREADY GRADED A+ 
1.	If a 500 kV transmission line with surge impedance loading of 800 MW is currently loaded at 1400 MW, which of the following events would most likely occur? 
 
a.	Generator MVAR output would increase 
b.	All system capacitors would trip off-line 
c.	Generator MVAR output would decrease 
d.	All automatic reactors would connect to the system 
- a. Generator MVAR output woul...
-
NERC Pre course Study Guide Exam Questions and Verified for Accuracy Answers 2023/2024
- Exam (elaborations) • 25 pages • 2024
-
Available in package deal
-
- $12.49
- + learn more
NERC Pre course Study Guide Exam Questions and Verified for Accuracy Answers 2023/2024 
 
The purpose of a generator reactive capability curve is to show what? - correct answer Thermal limits for excitation 
 
When a long open ended transmission line is energized and the leading chagrin current flowing through the lines inductance crests a high voltage on the open end, this is known as what? - correct answer Ferranti voltage rise effect 
 
To maximize system stability, you would do which of ...
And that's how you make extra money
-
NERC PREP TEST 101 EXAM | QUESTIONS & ANSWERS | GRADED A+ | LATEST UPDATE 2023-2024
- Exam (elaborations) • 97 pages • 2023
-
- $12.49
- + learn more
NERC PREP TEST 101 EXAM | 
QUESTIONS & ANSWERS | GRADED A+ | 
LATEST UPDATE 
If a 500 kV transmission line with a surge impedance loading of 800 MW is 
currently loaded at 1400 MW, which of the following events would most likely 
occur? 
a. Generator MVAR output would increase 
b. All system capacitors would trip off-line 
c. Generator MVAR output would decrease 
d. All automatic reactors would connect to the system - a. Generator MVAR output 
would increase
-
PJM transmission operations quiz Questions with Correct Answers 100% Verified
- Exam (elaborations) • 22 pages • 2024
- Available in package deal
-
- $12.99
- + learn more
PJM transmission operations quiz Questions with Correct Answers 100% Verified 
 
 
What is the submission requirement for a planned transmission outage of 20 calendar days that is scheduled to start on October 10 and be considered on time 
A. September 30 
B. April 1 
C. October 1 
D. September 1 - Correct Answer B. April 1 
 
Since PJM operates to a 5% voltage drop limit on the 500 KV system which of the following would be considered a violation 
A. Pre-536KV, post - 507KV 
B. Pre-545 kV, post ...
-
NERC PREP TEST 101| 200 Questions| Correct Answers| Latest Update
- Exam (elaborations) • 38 pages • 2024
-
Available in package deal
-
- $12.99
- + learn more
1. If a 500 kV transmission line with a surge impedance loading of 800 MW is currently loaded at 1400 MW, which of the following events would most likely occur? 
 
a. Generator MVAR output would increase 
b. All system capacitors would trip off-line 
c. Generator MVAR output would decrease 
d. All automatic reactors would connect to the system - ANSWER a. Generator MVAR output would increase 
 
2. When system conditions are such that emergency procedures are expected to be implemented, which of ...
-
NERC PREP TEST 101 With Verified Solution (200 Quiz)
- Exam (elaborations) • 38 pages • 2023
-
Available in package deal
-
- $14.99
- + learn more
NERC PREP TEST 101 With Verified Solution (200 Quiz) 
1. If a 500 kV transmission line with a surge impedance loading of 800 MW is currently loaded at 1400 MW, which of the following events would most likely occur? 
 
a. Generator MVAR output would increase 
b. All system capacitors would trip off-line 
c. Generator MVAR output would decrease 
d. All automatic reactors would connect to the system a. Generator MVAR output would increase 
 
2. When system conditions are such that emergency procedu...
-
NERC PREP TEST 101 Questions With 100% Verified Answers
- Exam (elaborations) • 61 pages • 2024
- Available in package deal
-
- $20.49
- + learn more
NERC PREP TEST 101 Questions With 100% Verified Answers 
1. If a 500 kV transmission line with a surge impedance loading of 800 MW is currently loaded at 1400 
MW, which of the following events would most likely occur? 
a. Generator MVAR output would increase 
b. All system capacitors would trip off-line 
c. Generator MVAR output would decrease 
d. All automatic reactors would connect to the system - ANS-a. Generator MVAR output would increase 