Slab construction Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Slab construction? On this page you'll find 515 study documents about Slab construction.
All 515 results
Sort by
-
COSC 275 Exam 1 Palmer Questions and Answers fully solved 2023
- Exam (elaborations) • 10 pages • 2023
-
Available in package deal
-
- $30.49
- 3x sold
- + learn more
COSC 275 Exam 1 Palmer Questions and Answers fully solved 2023 
Estimating: 
The process of determining the anticipated cost of materials, labor, and equipment of a proposed project. 
 
 
 
Take-off: 
The process in which detailed lists are compiled, based on drawings and specifications, of all the material and equipment necessary to construct a project. The cost estimator uses this list to calculate how much it will cost to build the project. 
 
 
 
Quantities: 
Measured amounts of construction...
-
ACI Flatwork Exam All Possible Questions and Answers with complete solution
- Exam (elaborations) • 9 pages • 2024 Popular
- Available in package deal
-
- $7.99
- 2x sold
- + learn more
It is important that the ____________ __________ read and understand project specifications. - 
Answer-finisher foreman 
If the crew can place and finish 100 yd3 of concrete per hour, the producer's delivery rate should be 
about _____ yd3 per hour. - Answer-100 
Concrete is sold by the ton? - Answer-False 
Delays in discharging concrete trucks can result in the concrete being hard to: - Answer-pump, place, 
and finish 
When there is room for two concrete trucks ready to discharge into a pump ho...
-
Michigan Builders License Exam Questions With Correct Answers
- Exam (elaborations) • 71 pages • 2023
- Available in package deal
-
- $13.49
- 5x sold
- + learn more
Created to serve as a complete, comprehensive code regulating the construction of single-family, two-family and buildings consisting of three or more townhouse units. - Answer IRC (International Residential Code) 
 
Administrative - Answer First 2 chapters of code book are 
 
True - Answer Plans or supporting documents are almost always required by the controlling authority prior to issuing a permit. T or F 
 
Yes - Answer Does the building official have the authority to render interpretations o...
-
IFSTA 7th edition FF 1 Mid Term Chp 1-15 (100) with Answers 2023/2024
- Exam (elaborations) • 24 pages • 2023
- Available in package deal
-
- $19.99
- 2x sold
- + learn more
IFSTA 7th edition FF 1 Mid Term Chp 1-15 (100) with Answers1. Paid-on-call firefighters are generally part of a _______ department 
a. Line 
B. staff 
C. career 
D. volunteer - correct answer D. volunteer 
 
2. Departments use _______ to clarify expectations, delegate authority, and assign responsibility. (20) 
A. written regulations 
B. municipal ordinances 
C. administrative priorities 
D. standard operating procedures - correct answer A. written regulations 
 
3. Firefighters who are given st...
-
Michigan residential builders maintenance and alterations 5 practice exam with 100% correct answerss
- Exam (elaborations) • 8 pages • 2024
- Available in package deal
-
- $13.99
- 1x sold
- + learn more
SITEWORK, FOOTING, AND FONDATIONS 
FIRST SECTION 
 
 
 
A foundation drain shall extend past the outside edge of the footing at least how far? 
12 inches 
 
 
 
What are batter boards? 
Stakes and ledger boards marking building lines. 
 
 
 
What is the purpose of a cove or can't strip at a foundation joint? 
Deflect water from the foundation wall. 
 
 
 
What is the MINIMUM overlap for the joints in the polyethylene film moisture barrier applied over the exterior of a below grade foundation wa...
Too much month left at the end of the money?
-
CWEA Collections System Maintenance Grade 3 | Questions and Answers | Correct Latest 2023 Graded A+
- Exam (elaborations) • 13 pages • 2023
- Available in package deal
-
- $23.49
- 2x sold
- + learn more
CWEA Collections System Maintenance Grade 3 | Questions and Answers | Correct Latest 2023 Graded A+. When pouring a concrete slab, which of the following tools is used to finish the concrete? 
a. Grasshopper. 
b. Tamper. 
c. Trowel. 
d. Vibrator. Correct Answer: c. Trowel. 
What tool is used to snare a broken section of sewer rod? 
a. Square stock corkscrew. 
b. Auger. 
c. Pickup tool. 
d. Pull out tool. Correct Answer: c. Pickup tool. 
Why is the replacement of wastewater collection systems in ...
-
Basic Appraisal Procedures – McKissock test questions with verified solutions 2024.
- Exam (elaborations) • 19 pages • 2024
- Available in package deal
-
- $15.49
- 1x sold
- + learn more
Valuation process 
A systematic procedure used in the valuation of real property. 
 
Steps: 
1: Define the problem 
 
2:Determine scope of work 
 
3:Gather, record, and verify the data 
 
4:Determine the highest and best use 
 
5:Estimate the land value 
 
6:Estimate value by each of the three approaches (if applicable) 
 
7:Reconcile the estimated values into the final opinion of value 
 
8:Report the final opinion of value 
 
 
 
Client 
The party or parties who engage, by employment or contra...
-
1.2-1.5 Foundation Construction, Stone Masonry & Slab Construction(questions and answers)
- Exam (elaborations) • 7 pages • 2023
- Available in package deal
-
- $15.49
- + learn more
What is "grade" in terms for the structure? 
The slope of the land at the building site. 
 
 
 
What does "below grade" mean? 
Below the surface of the ground. 
 
 
 
What is the frost line? 
It marks the depth of penetration of frost into the ground. In cold climates, the frost line is normally about 4' below the grade. 
 
 
 
What are footings? 
Footings support and transmit the dead load and the structure's live load to the soil. Their purpose is to spread these dead and live weights ov...
-
FULL NHIE EXAM PRACTICE - Questions and Answers (Complete Solutions)
- Exam (elaborations) • 83 pages • 2024
-
- $28.49
- 1x sold
- + learn more
FULL NHIE EXAM PRACTICE - Questions and Answers (Complete Solutions) Where you have found evidence of footing settlement, how can you predict whether there will be further settlement? (a) You can count the number of planes of movement. (b) You can determine the type of foundation material. (c) You cannot predict settlement from a single inspection. (d) You can determine the depth of the footing. You typically identify a Freon leak (a) As an oil stain (b) As refrigerant coming out of the Freon ...
-
NASCLA Exam Questions With 100% Correct Answers
- Exam (elaborations) • 28 pages • 2024
- Available in package deal
-
- $13.49
- 1x sold
- + learn more
NASCLA Exam Questions With 100% 
Correct Answers 
lightweight, 5/8" that is up to 15% lighter than standard Type X wallboard - answerGysum 
Panel- Firecode Type X 
What is an advantage of veneer plasters? - answerVeneer plaster is more durable 
Least expensive stud for gypsum framing? - answer25 gauge steel studs 
18 GAUGE TIES are used for what in gypsum framing? - answerTO ATTACH CHANNEL TO 
FURRED AREAS 
Why USE SHORTER SHANK NAILS in framing with Gypsum? - answerTO PREVENT NAIL POPS 
With g...
$6.50 for your textbook summary multiplied by 100 fellow students... Do the math: that's a lot of money! Don't be a thief of your own wallet and start uploading yours now. Discover all about earning on Stuvia