Rigging gear inspection - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Rigging gear inspection? On this page you'll find 110 study documents about Rigging gear inspection.
All 110 results
Sort by
-
Rigging 101 Final Exam 2023/2024 Questions with Complete Solutions Graded A+
- Exam (elaborations) • 6 pages • 2023
- Available in package deal
-
- $9.49
- 3x sold
- + learn more
Rigging 101 Final Exam 2023/2024 Questions with Complete Solutions Graded A+ 
Oxygen bottles that are properly secured in a rack or stand designed for lifting/handling would be considered a critical rigging option. - Correct Answer false 
 
There are three slings hanging from a hook. Each sling has the capacity of 2,000 pounds. What is the heaviest load that could be lifted using these slings if they were attached to a single point? - Correct Answer 2,000 lbs 
 
The minimum depth of thread engag...
-
Elevator Mechanic Exam Review 2023: Verified Solutions (A+ Guaranteed)
- Exam (elaborations) • 30 pages • 2023
-
- $8.49
- 7x sold
- + learn more
1.	A contractor wants to raise the car speed from 100fpm to 125fpm, it currently has a 12" sheave. What sheave is required?: Diam=12" 12/4=3" 25fpm=3" 100fpm + 25fpm= 12"+3"= 15" sheave 
2.	A MOV (Metal Oxide Varistor) burns out. You replace it, but cannot read voltage or resistance. What should you do?: Replace it with a larger MOV 
3.	On a Ward-Leonard circuit the break is set, but the motor is trying to slip through the break. What is the issue?: Suicide Circuit 
4.	You have an old DC ...
-
Rigging Gear Inspection Final Exam
- Exam (elaborations) • 3 pages • 2024
-
- $9.99
- + learn more
Rigging Gear Inspection Final Exam
-
Rigging Gear Inspection Final Exam Questions And 100% Correct Answers
- Exam (elaborations) • 4 pages • 2024
- Available in package deal
-
- $11.99
- + learn more
Rigging Gear Inspection Final Exam Questions And 100% Correct Answers...
-
Rigging Gear Inspection Final Exam Questions with Answers
- Exam (elaborations) • 3 pages • 2024
-
- $10.99
- + learn more
The reason test and inspection is required is to Correct Answer prevent personal injury, identify sub-standard equipment, remove unsafe equipment 
 
Other than hooks, what rigging equipment does not require load tests or documentation of inspections? Correct Answer rigging hardware 
 
Equipment test and inspection requirements in section 14 of NAVFAC P-307 do not apply to Correct Answer OEM installed bolt-on pads 
 
Ordnance equipment is covered by NAVFAC p-307 section 14 Correct Answer false 
 ...
Get paid weekly? You can!
-
Rigging Gear Inspection Final Exam questions and answers
- Exam (elaborations) • 3 pages • 2024
- Available in package deal
-
- $7.99
- + learn more
Rigging Gear Inspection Final Exam questions and answers
-
Rigging Gear Inspection Final Exam (Already Graded A+)
- Exam (elaborations) • 3 pages • 2023
- Available in package deal
-
- $8.49
- + learn more
The reason test and inspection is required is to correct answers prevent personal injury, identify sub-standard equipment, remove unsafe equipment 
 
Other than hooks, what rigging equipment does not require load tests or documentation of inspections? correct answers rigging hardware 
 
Equipment test and inspection requirements in section 14 of NAVFAC P-307 do not apply to correct answers OEM installed bolt-on pads 
 
Ordnance equipment is covered by NAVFAC p-307 section 14 correct answers fals...
-
Elevator Mechanic Exam Review Questions and answers 2023 With Complete Solution Graded and Already Passed.
- Exam (elaborations) • 11 pages • 2023
-
- $11.49
- 2x sold
- + learn more
A contractor wants to raise the car speed from 100fpm to 125fpm, it currently has a 12" sheave. 
What sheave is required? - CORRECT ANS Diam=12" 12/4=3" 25fpm=3" 100fpm + 25fpm= 
12"+3"= 15" sheave 
A MOV (Metal Oxide Varistor) burns out. You replace it, but cannot read voltage or resistance. 
What should you do? - CORRECT ANS Replace it with a larger MOV 
On a Ward-Leonard circuit the break is set, but the motor is trying to slip through the break. What 
is the issue? - CORRECT ANS Suici...
-
RIGGING FINAL TEST QUESTIONS WITH GUARANTEED CORRECT ANSWERS
- Exam (elaborations) • 18 pages • 2024
-
- $13.99
- + learn more
Oxygen bottles that are properly secured in a rack or stand designed for lifting/handling would be considered a critical rigging option. - correct answer false 
 
There are three slings hanging from a hook. Each sling has the capacity of 2,000 pounds. What is the heaviest load that could be lifted using these slings if they were attached to a single point? - correct answer 2,000 lbs 
 
The minimum depth of thread engagement for a 1/2 inch eyebolt into a steel object is: - correct answer 3/4" 
 ...
-
RIGGING 101 FINAL EXAM
- Exam (elaborations) • 5 pages • 2024
-
- $10.99
- + learn more
Oxygen bottles that are properly secured in a rack or stand designed for lifting/handling would be considered a critical rigging option. - Answer-false 
 
There are three slings hanging from a hook. Each sling has the capacity of 2,000 pounds. What is the heaviest load that could be lifted using these slings if they were attached to a single point? - Answer-2,000 lbs 
 
The minimum depth of thread engagement for a 1/2 inch eyebolt into a steel object is: - Answer-3/4" 
 
Given a 1/2 in steel wa...
That summary you just bought made someone very happy. Also get paid weekly? Sell your study resources on Stuvia! Discover all about earning on Stuvia