CMT 443 Conceptual Est. || Questions and 100% Verified Answers.
- Exam (elaborations) • 23 pages • 2024
-
- $13.69
- + learn more
True correct answers A contractor's estimating department is responsible for identifying the goals and objectives of the department. 
 
Pre-Solicitation Notice correct answers Agencies of the U.S. government use a standard form called the "____" to provide bid information. 
 
advertisements in newspapers correct answers All of the following are considered primary sources of information for private bids EXCEPT: 
 
prequalified correct answers A method of addressing the problem of bids from con...
-
AIC Exam #2 Practice Questions and Answers 100% Pass
- Exam (elaborations) • 31 pages • 2024
- Available in package deal
-
- $13.49
- + learn more
AIC Exam #2 Practice Questions and Answers 100% Pass 
What is the name of the law principle for referring the Contractor to other documents 
that are not contained in the package provided? - Correct Answer ️️ -Incorporated by 
Reference. 
Which document issued by the Architect illustrates what is to be built? - Correct Answer ️️ 
-Plans 
Which document describes quality of work and the quality of the materials and the 
construction execution procedures? - Correct Answer ️️ -Technical...
-
AC Exam #5 - Construction Doc with complete verified solutions
- Exam (elaborations) • 22 pages • 2024
-
- $15.99
- + learn more
Pre-qualification 
The ________________________ process results in a select bidders list, or short list, which identifies firms that have demonstrated to the owner that they have the necessary abilities to perform the required work. 
 
 
 
General Conditions 
Often referred to as the boiler plate, the _____________________ augment the construction contract (agreement) and outline the rules under which the project will be built by establishing the rights, authority, and obligations of the contrac...
-
CPPO questions with correct answers
- Exam (elaborations) • 8 pages • 2024
-
- $13.99
- + learn more
Internal resistance, current crisis, and political windows are all limitations of: 
 
A. Creating good solicitations 
B. Planning 
C. Changing our procurement rules 
D. Conducting RFP evaluations - Correct Answer-asdf 
 
Name something good about an emergency purchase and something not so good. - Correct Answer-adsfs 
 
Which of the following is an alternative to using bidder/source lists? 
 
A. Pre-qualification of vendors. 
B. Past qualification of vendors. 
C. Sole source purchasing. 
D. Elec...
-
Construction Management 3014 Virginia Tech Exam 1 Already Passed
- Exam (elaborations) • 13 pages • 2024
- Available in package deal
-
- $9.99
- + learn more
Construction Management 3014 Virginia 
 
Tech Exam 1 Already Passed 
 
construction industry vs. manufacturing manufacturing produces products and then sells. 
construction starts with a customer need and the product is built to fill the need. 
 
sectors of construction industry (4) infrastructure, commercial, residential, industrial 
 
main players in construction project (3) owner, designer, constructor 
 
stages of construction lifecycle 1)need 
2)programming 
3)schematic design 
4)detailed d...
And that's how you make extra money
-
AIC Exam #2 Practice Questions and Answers 100% Pass
- Exam (elaborations) • 31 pages • 2024
-
- $13.49
- + learn more
AIC Exam #2 Practice Questions and Answers 100% Pass 
What is the name of the law principle for referring the Contractor to other documents 
that are not contained in the package provided? - Correct Answer ️️ -Incorporated by 
Reference. 
Which document issued by the Architect illustrates what is to be built? - Correct Answer ️️ 
-Plans 
Which document describes quality of work and the quality of the materials and the 
construction execution procedures? - Correct Answer ️️ -Technical...
-
CPPO questions with correct answers
- Exam (elaborations) • 8 pages • 2024
-
- $13.49
- + learn more
Internal resistance, current crisis, and political windows are all limitations of: 
 
A. Creating good solicitations 
B. Planning 
C. Changing our procurement rules 
D. Conducting RFP evaluations - Correct Answer-asdf 
 
Name something good about an emergency purchase and something not so good. - Correct Answer-adsfs 
 
Which of the following is an alternative to using bidder/source lists? 
 
A. Pre-qualification of vendors. 
B. Past qualification of vendors. 
C. Sole source purchasing. 
D. Elec...
-
CPPO Exam Questions & Answers 2024/2025
- Exam (elaborations) • 7 pages • 2024
-
Available in package deal
-
- $8.49
- + learn more
CPPO Exam Questions & Answers 2024/2025 
 
 
Internal resistance, current crisis, and political windows are all limitations of: 
 
A. Creating good solicitations 
B. Planning 
C. Changing our procurement rules 
D. Conducting RFP evaluations - ANSWERSasdf 
 
Name something good about an emergency purchase and something not so good. - ANSWERSadsfs 
 
Which of the following is an alternative to using bidder/source lists? 
 
A. Pre-qualification of vendors. 
B. Past qualification of vendors. 
C. So...
-
LARE Section 1: Project & Construction Management
- Exam (elaborations) • 43 pages • 2023
- Available in package deal
-
- $13.49
- + learn more
LARE Section 1: Project & Construction Management 
Pre-Project Management - ANS ️️ (10%) 
The designer pursues a particular project for a client. Through discussions about 
the desired final product, a scope of services and deliverables are arrived at. The 
designer prepares a design proposal which if agreed to becomes a contract between 
the client and the designer. Thus the project begins. 
Project Management - ANS ️️ (30%) 
Relating to the LARE, project management begins with determin...
-
Construction Management 3014 Virginia Tech Exam 1 Questions & Answers(RATED A)
- Exam (elaborations) • 6 pages • 2024
-
- $10.99
- + learn more
construction industry vs. manufacturing - ANSWERmanufacturing produces products and then sells. construction starts with a customer need and the product is built to fill the need. 
 
sectors of construction industry (4) - ANSWERinfrastructure, commercial, residential, industrial 
 
main players in construction project (3) - ANSWERowner, designer, constructor 
 
stages of construction lifecycle - ANSWER1)need 
2)programming 
3)schematic design 
4)detailed design 
5)construction documents 
6)bid 
...
Did you know that on average a seller on Stuvia earns $82 per month selling study resources? Hmm, hint, hint. Discover all about earning on Stuvia