Pre bid qualification - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Pre bid qualification? On this page you'll find 60 study documents about Pre bid qualification.

All 60 results

Sort by

CMT 443 Conceptual Est. || Questions and 100% Verified Answers.
  • CMT 443 Conceptual Est. || Questions and 100% Verified Answers.

  • Exam (elaborations) • 23 pages • 2024
  • True correct answers A contractor's estimating department is responsible for identifying the goals and objectives of the department. Pre-Solicitation Notice correct answers Agencies of the U.S. government use a standard form called the "____" to provide bid information. advertisements in newspapers correct answers All of the following are considered primary sources of information for private bids EXCEPT: prequalified correct answers A method of addressing the problem of bids from con...
    (0)
  • $13.69
  • + learn more
AIC Exam #2 Practice Questions and Answers 100% Pass
  • AIC Exam #2 Practice Questions and Answers 100% Pass

  • Exam (elaborations) • 31 pages • 2024
  • Available in package deal
  • AIC Exam #2 Practice Questions and Answers 100% Pass What is the name of the law principle for referring the Contractor to other documents that are not contained in the package provided? - Correct Answer ️️ -Incorporated by Reference. Which document issued by the Architect illustrates what is to be built? - Correct Answer ️️ -Plans Which document describes quality of work and the quality of the materials and the construction execution procedures? - Correct Answer ️️ -Technical...
    (0)
  • $13.49
  • + learn more
AC Exam #5 - Construction Doc with complete verified solutions
  • AC Exam #5 - Construction Doc with complete verified solutions

  • Exam (elaborations) • 22 pages • 2024
  • Pre-qualification The ________________________ process results in a select bidders list, or short list, which identifies firms that have demonstrated to the owner that they have the necessary abilities to perform the required work. General Conditions Often referred to as the boiler plate, the _____________________ augment the construction contract (agreement) and outline the rules under which the project will be built by establishing the rights, authority, and obligations of the contrac...
    (0)
  • $15.99
  • + learn more
CPPO questions with correct answers
  • CPPO questions with correct answers

  • Exam (elaborations) • 8 pages • 2024
  • Internal resistance, current crisis, and political windows are all limitations of: A. Creating good solicitations B. Planning C. Changing our procurement rules D. Conducting RFP evaluations - Correct Answer-asdf Name something good about an emergency purchase and something not so good. - Correct Answer-adsfs Which of the following is an alternative to using bidder/source lists? A. Pre-qualification of vendors. B. Past qualification of vendors. C. Sole source purchasing. D. Elec...
    (0)
  • $13.99
  • + learn more
Construction Management 3014 Virginia  Tech Exam 1 Already Passed
  • Construction Management 3014 Virginia Tech Exam 1 Already Passed

  • Exam (elaborations) • 13 pages • 2024
  • Available in package deal
  • Construction Management 3014 Virginia Tech Exam 1 Already Passed construction industry vs. manufacturing manufacturing produces products and then sells. construction starts with a customer need and the product is built to fill the need. sectors of construction industry (4) infrastructure, commercial, residential, industrial main players in construction project (3) owner, designer, constructor stages of construction lifecycle 1)need 2)programming 3)schematic design 4)detailed d...
    (0)
  • $9.99
  • + learn more
AIC Exam #2 Practice Questions and Answers 100% Pass
  • AIC Exam #2 Practice Questions and Answers 100% Pass

  • Exam (elaborations) • 31 pages • 2024
  • AIC Exam #2 Practice Questions and Answers 100% Pass What is the name of the law principle for referring the Contractor to other documents that are not contained in the package provided? - Correct Answer ️️ -Incorporated by Reference. Which document issued by the Architect illustrates what is to be built? - Correct Answer ️️ -Plans Which document describes quality of work and the quality of the materials and the construction execution procedures? - Correct Answer ️️ -Technical...
    (0)
  • $13.49
  • + learn more
CPPO questions with correct answers
  • CPPO questions with correct answers

  • Exam (elaborations) • 8 pages • 2024
  • Internal resistance, current crisis, and political windows are all limitations of: A. Creating good solicitations B. Planning C. Changing our procurement rules D. Conducting RFP evaluations - Correct Answer-asdf Name something good about an emergency purchase and something not so good. - Correct Answer-adsfs Which of the following is an alternative to using bidder/source lists? A. Pre-qualification of vendors. B. Past qualification of vendors. C. Sole source purchasing. D. Elec...
    (0)
  • $13.49
  • + learn more
CPPO Exam Questions & Answers 2024/2025
  • CPPO Exam Questions & Answers 2024/2025

  • Exam (elaborations) • 7 pages • 2024
  • CPPO Exam Questions & Answers 2024/2025 Internal resistance, current crisis, and political windows are all limitations of: A. Creating good solicitations B. Planning C. Changing our procurement rules D. Conducting RFP evaluations - ANSWERSasdf Name something good about an emergency purchase and something not so good. - ANSWERSadsfs Which of the following is an alternative to using bidder/source lists? A. Pre-qualification of vendors. B. Past qualification of vendors. C. So...
    (0)
  • $8.49
  • + learn more
LARE Section 1: Project & Construction Management
  • LARE Section 1: Project & Construction Management

  • Exam (elaborations) • 43 pages • 2023
  • Available in package deal
  • LARE Section 1: Project & Construction Management Pre-Project Management - ANS ️️ (10%) The designer pursues a particular project for a client. Through discussions about the desired final product, a scope of services and deliverables are arrived at. The designer prepares a design proposal which if agreed to becomes a contract between the client and the designer. Thus the project begins. Project Management - ANS ️️ (30%) Relating to the LARE, project management begins with determin...
    (0)
  • $13.49
  • + learn more
Construction Management 3014 Virginia Tech Exam 1 Questions & Answers(RATED A)
  • Construction Management 3014 Virginia Tech Exam 1 Questions & Answers(RATED A)

  • Exam (elaborations) • 6 pages • 2024
  • construction industry vs. manufacturing - ANSWERmanufacturing produces products and then sells. construction starts with a customer need and the product is built to fill the need. sectors of construction industry (4) - ANSWERinfrastructure, commercial, residential, industrial main players in construction project (3) - ANSWERowner, designer, constructor stages of construction lifecycle - ANSWER1)need 2)programming 3)schematic design 4)detailed design 5)construction documents 6)bid ...
    (0)
  • $10.99
  • + learn more