Nerc time limits - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Nerc time limits? On this page you'll find 80 study documents about Nerc time limits.

All 80 results

Sort by

NERC TOP System Operations EXAM Questions and Answers (Download To Score An A)
  • NERC TOP System Operations EXAM Questions and Answers (Download To Score An A)

  • Exam (elaborations) • 24 pages • 2023
  • At what torque angle of operation does power typically begin to flow from the generator to the system? A) 90 degrees B) 60 degrees C) 30 degrees D) 10 degrees 10 degrees Choose the answer that best describes the operation of a rotor. A) The stationary part of the transmission system. B) A type of superconductor. C) The stationary element of a generator that has its windings connected to the system. D) The excited (energized) field winding that rotates inside the stator to induce current into the...
    (1)
  • $10.99
  • 1x sold
  • + learn more
NERC Final Assessment Exam Correct answers (Already GRADED A)
  • NERC Final Assessment Exam Correct answers (Already GRADED A)

  • Exam (elaborations) • 98 pages • 2023
  • When using a dynamic schedule and the energy profile in an hour is >250 MW and the actual hourly integration deviates from the hourly energy profile by ____ the tag must be modified. A. 100 MW B. 10% C. 50 MW D. 25% B. 10% Dry steam plants, flash steam plants, and binary cycle power plants are the three main types of what kind of generating plant? A. Nuclear generators B. Combustion turbine generators C. Geothermal generators D. Hydroelectric generators C. Geothermal generators...
    (1)
  • $11.99
  • 1x sold
  • + learn more
NERC TIME LIMITS WITH 100% CORRECT ANSWERS ALREADY GRADED A+
  • NERC TIME LIMITS WITH 100% CORRECT ANSWERS ALREADY GRADED A+

  • Exam (elaborations) • 8 pages • 2023
  • Available in package deal
  • NERC TIME LIMITS WITH 100% CORRECT ANSWERS ALREADY GRADED A+
    (0)
  • $14.49
  • + learn more
NERC TIME LIMITS WITH 100% CORRECT ANSWERS ALREADY GRADED A+
  • NERC TIME LIMITS WITH 100% CORRECT ANSWERS ALREADY GRADED A+

  • Exam (elaborations) • 8 pages • 2023
  • NERC TIME LIMITS WITH 100% CORRECT ANSWERS ALREADY GRADED A+
    (0)
  • $13.99
  • + learn more
NERC TEST 200 Exam Questions and Answers Latest 2024/2025 (100% Verified)
  • NERC TEST 200 Exam Questions and Answers Latest 2024/2025 (100% Verified)

  • Exam (elaborations) • 54 pages • 2024
  • NERC TEST 200 Exam Questions and Answers Latest 2024/2025 (100% Verified) When system conditions are such that emergency procedures are expected to be implemented, which of the following actions should be considered first? a. Shed firm load b. Implement Active Load Management c. Return outaged equipment to service d. Request a voltage reduction - c. Return outaged equipment to service 3. If your transmission path is rated for 1200 MW and 1000 MW are scheduled on it, but due to parallel fl...
    (0)
  • $17.99
  • + learn more
NERC Certification TEST 200 Exam Questions and Answers Latest 2024/2025 | 100% Correct
  • NERC Certification TEST 200 Exam Questions and Answers Latest 2024/2025 | 100% Correct

  • Exam (elaborations) • 54 pages • 2024
  • NERC Certification TEST 200 Exam Questions and Answers Latest 2024/2025 | 100% Correct. If a 500 kV transmission line with a surge impedance loading of 800 MW is currently loaded at 1400 MW, which of the following events would most likely occur? a. Generator MVAR output would increase b. All system capacitors would trip off-line c. Generator MVAR output would decrease d. All automatic reactors would connect to the system - a. Generator MVAR output would increase 2. When system conditions...
    (0)
  • $18.49
  • + learn more
NERC PREP Exam Questions and Answers Latest Updated 2024/2025 | 100% Correct
  • NERC PREP Exam Questions and Answers Latest Updated 2024/2025 | 100% Correct

  • Exam (elaborations) • 54 pages • 2024
  • If a 500 kV transmission line with a surge impedance loading of 800 MW is currently loaded at 1400 MW, which of the following events would most likely occur? a. Generator MVAR output would increase b. All system capacitors would trip off-line c. Generator MVAR output would decrease d. All automatic reactors would connect to the system - a. Generator MVAR output would increase 2. When system conditions are such that emergency procedures are expected to be implemented, which of the follow...
    (0)
  • $16.49
  • + learn more
NERC PREP TEST 200 Final Exam Questions and Answers Latest 2024/2025 (100% Correct )
  • NERC PREP TEST 200 Final Exam Questions and Answers Latest 2024/2025 (100% Correct )

  • Exam (elaborations) • 54 pages • 2024
  • NERC PREP TEST 200 Final Exam Questions and Answers Latest 2024/2025 (100% Correct ) When system conditions are such that emergency procedures are expected to be implemented, which of the following actions should be considered first? a. Shed firm load b. Implement Active Load Management c. Return outaged equipment to service d. Request a voltage reduction - c. Return outaged equipment to service 3. If your transmission path is rated for 1200 MW and 1000 MW are scheduled on it, but due to ...
    (0)
  • $19.49
  • + learn more
NERC BI - RELIABILITY AND FUNCTION WITH 100% CORRECT ANSWERS ALREADY GRADED A+
  • NERC BI - RELIABILITY AND FUNCTION WITH 100% CORRECT ANSWERS ALREADY GRADED A+

  • Exam (elaborations) • 18 pages • 2023
  • Available in package deal
  • FERC The Energy Regulatory Commission; energy authority and governing body NERC The North American Electric Reliability Corporation, certified as the "electric reliability organization" for the continental United States, compliance monitoring FERC functions Regulates transmission of electric, gas and oil Review mergers and acquisitions and corporate transactions by electric companies Protection of high voltage reliability through reliability standards Enforcement of r...
    (0)
  • $14.49
  • + learn more
NERC Certification Exam Questions With Correct Answers
  • NERC Certification Exam Questions With Correct Answers

  • Exam (elaborations) • 25 pages • 2024
  • Available in package deal
  • True/False According to the NERC Functional Model, there is no difference between the function and the entity. A) True B) False - Answer B) False True/False Analysis type questions are designed to be the least complex from a human cognitive process. A) True B) False - Answer B) False True/False A Transmission Service Provider is an entity that both owns and operates transmission facilities on the Bulk Electric System. A) True B) False - Answer B) False True/False ...
    (0)
  • $11.49
  • + learn more