Nerc study resource - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Nerc study resource? On this page you'll find 12 study documents about Nerc study resource.

All 12 results

Sort by

NERC Final Assessment Exam Correct answers (Already GRADED A) Popular
  • NERC Final Assessment Exam Correct answers (Already GRADED A)

  • Exam (elaborations) • 98 pages • 2023
  • When using a dynamic schedule and the energy profile in an hour is >250 MW and the actual hourly integration deviates from the hourly energy profile by ____ the tag must be modified. A. 100 MW B. 10% C. 50 MW D. 25% B. 10% Dry steam plants, flash steam plants, and binary cycle power plants are the three main types of what kind of generating plant? A. Nuclear generators B. Combustion turbine generators C. Geothermal generators D. Hydroelectric generators C. Geothermal generators...
    (1)
  • $11.99
  • 1x sold
  • + learn more
NERC TEST 200 Exam Questions and Answers Latest 2024/2025 (100% Verified)
  • NERC TEST 200 Exam Questions and Answers Latest 2024/2025 (100% Verified)

  • Exam (elaborations) • 54 pages • 2024
  • NERC TEST 200 Exam Questions and Answers Latest 2024/2025 (100% Verified) When system conditions are such that emergency procedures are expected to be implemented, which of the following actions should be considered first? a. Shed firm load b. Implement Active Load Management c. Return outaged equipment to service d. Request a voltage reduction - c. Return outaged equipment to service 3. If your transmission path is rated for 1200 MW and 1000 MW are scheduled on it, but due to parallel fl...
    (0)
  • $17.99
  • + learn more
NERC PREP Exam Questions and Answers Latest Updated 2024/2025 | 100% Correct
  • NERC PREP Exam Questions and Answers Latest Updated 2024/2025 | 100% Correct

  • Exam (elaborations) • 54 pages • 2024
  • If a 500 kV transmission line with a surge impedance loading of 800 MW is currently loaded at 1400 MW, which of the following events would most likely occur? a. Generator MVAR output would increase b. All system capacitors would trip off-line c. Generator MVAR output would decrease d. All automatic reactors would connect to the system - a. Generator MVAR output would increase 2. When system conditions are such that emergency procedures are expected to be implemented, which of the follow...
    (0)
  • $16.49
  • + learn more
NERC PREP TEST 101 Questions With Correct Answers
  • NERC PREP TEST 101 Questions With Correct Answers

  • Exam (elaborations) • 57 pages • 2024
  • Available in package deal
  • 1. If a 500 kV transmission line with a surge impedance loading of 800 MW is currently loaded at 1400 MW, which of the following events would most likely occur? a. Generator MVAR output would increase b. All system capacitors would trip off-line c. Generator MVAR output would decrease d. All automatic reactors would connect to the system - Answer a. Generator MVAR output would increase 2. When system conditions are such that emergency procedures are expected to be implemented, which of ...
    (0)
  • $13.49
  • + learn more
NERC PREP TEST 101 QUESTIONS AND ANSWERS (100% CORRECT SOLUTIONS)
  • NERC PREP TEST 101 QUESTIONS AND ANSWERS (100% CORRECT SOLUTIONS)

  • Exam (elaborations) • 73 pages • 2023
  • 1. If a 500 kV transmission line with a surge impedance loading of 800 MW is currently loaded at 1400 MW, which of the following events would most likely occur? a. Generator MVAR output would increase b. All system capacitors would trip off-line c. Generator MVAR output would decrease d. All automatic reactors would connect to the system a. Generator MVAR output would increase 2. When system conditions are such that emergency procedures are expected to be implemented, which of the fo...
    (0)
  • $11.49
  • + learn more
Practice Test NERC Questions and Correct Answers (GRADED A+)
  • Practice Test NERC Questions and Correct Answers (GRADED A+)

  • Exam (elaborations) • 48 pages • 2023
  • A transmission line is operating with a voltage phase angle different of 30 degrees between the sending Vs and the receiving bus Vr. If the receiving end load is suddenly increased, the voltage phase angle difference will be? The phase angle will increase. When load is increased phase angle will increase. A load has a power factor of 0.9 lagging. If the load draws 100 MVA, what is the MW draw? 90 pf= mw/mva The high side of a delta-wye connection transformer is connected to a power s...
    (0)
  • $11.99
  • + learn more
NERC SOS quiz Questions and Answers (Already GRADED A)
  • NERC SOS quiz Questions and Answers (Already GRADED A)

  • Exam (elaborations) • 60 pages • 2023
  • If a Balancing Authority does not comply with the Control Performance Standard, the Balancing Authority is not permitted to provide which of the following for any other Balancing Authority entities? Regulation of other services related to control performance 1. It is the obligation of each Balancing Authority to fulfill its commitment to the Interconnection and not ________ the other balancing Authorities in the Interconnection Burden A Balancing Authority is performing Overlap Regul...
    (0)
  • $11.49
  • + learn more
NERC PREP TEST 101 Graded A+ 2023
  • NERC PREP TEST 101 Graded A+ 2023

  • Exam (elaborations) • 38 pages • 2023
  • Available in package deal
  • 1. If a 500 kV transmission line with a surge impedance loading of 800 MW is currently loaded at 1400 MW, which of the following events would most likely occur? a. Generator MVAR output would increase b. All system capacitors would trip off-line c. Generator MVAR output would decrease d. All automatic reactors would connect to the system - ANSWER-a. Generator MVAR output would increase 2. When system conditions are such that emergency procedures are expected to be implemented, which of ...
    (0)
  • $14.49
  • + learn more
SOS NERC Prep - RElIABILITY Exam| 200 QUESTIONS AND ANSWERS | GRADED A
  • SOS NERC Prep - RElIABILITY Exam| 200 QUESTIONS AND ANSWERS | GRADED A

  • Exam (elaborations) • 109 pages • 2023
  • The Reliability Coordinator just informed you of a slow time error correction which will begin at the top of the next hour. Your EMS system will not let you change your scheduled frequency. Your Frequency Bias Setting is -100 MW/.1Hz. What action should you take? A) Increase Net Interchange Schedule by 20 MWs. B) Inform the Reliability Coordinator that you cannot participate in the time error correction. C) Decrease Net Interchange Schedule by 20 MWs. D) Increase Net Interchange Sche...
    (0)
  • $11.99
  • + learn more
NERC PREP TEST 101- QUESTIONS & ANS
  • NERC PREP TEST 101- QUESTIONS & ANS

  • Exam (elaborations) • 49 pages • 2023
  • NERC PREP TEST 101- QUESTIONS & ANS 1. If a 500 kV transmission line with a surge impedance loading of 800 MW is currently loaded at 1400 MW, which of the following events would most likely occur? a. Generator MVAR output would increase b. All system capacitors would trip off-line c. Generator MVAR output would decrease d. All automatic reactors would connect to the system a. Generator MVAR output would increase . When system conditions are such that emergency procedur...
    (0)
  • $15.49
  • + learn more