Nccco tower crane - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Nccco tower crane? On this page you'll find 242 study documents about Nccco tower crane.

All 242 results

Sort by

NCCCO Tower Crane Test (New 2023/ 2024 Update) Questions and Verified Answers| Graded A| 100% Correct
  • NCCCO Tower Crane Test (New 2023/ 2024 Update) Questions and Verified Answers| Graded A| 100% Correct

  • Exam (elaborations) • 33 pages • 2023
  • NCCCO Tower Crane Test (New 2023/ 2024 Update) Questions and Verified Answers| Graded A| 100% Correct QUESTION According to AMSE B30.3 an overhead powerline is ALWAYS considered to be: Answer: Energized until the power company has verified it is not energized QUESTION High tensile bolts shall be marked with manufacturers designation and: Answer: Strength rating QUESTION Bolt connections for tower sections must use high tensile strength nuts with ratings...
    (2)
  • $10.99
  • 1x sold
  • + learn more
 NCCCO tower crane exam practice with 100% correct answers
  • NCCCO tower crane exam practice with 100% correct answers

  • Exam (elaborations) • 14 pages • 2023
  • NCCCO tower crane exam practice with 100% correct answers
    (2)
  • $12.49
  • 7x sold
  • + learn more
NCCCO Core Exam Prep (2023/ 2024 Update) Questions and 100% Correct Verified Answers| Grade A
  • NCCCO Core Exam Prep (2023/ 2024 Update) Questions and 100% Correct Verified Answers| Grade A

  • Exam (elaborations) • 31 pages • 2023
  • NCCCO Core Exam Prep (2023/ 2024 Update) Questions and 100% Correct Verified Answers| Grade A Q: What three functions will not work after two-blocking a crane that has a prevention system? Answer: Boom down, extend the boom and hoist Q: Boom angle on a telescoping boom is measured from above or below horizontal to the ? Answer: Longitudinal axis of the boom base section Q: The line pull of the innermost layer on the hoist drum is than...
    (7)
  • $10.99
  • 9x sold
  • + learn more
NCCCO Tower Crane Questions and  Answers Rated A+
  • NCCCO Tower Crane Questions and Answers Rated A+

  • Exam (elaborations) • 27 pages • 2024
  • NCCCO Tower Crane Questions and Answers Rated A+ What is the primary function of a tower crane? The primary function of a tower crane is to lift and move heavy materials vertically and horizontally on construction sites. How does a tower crane achieve its height? A tower crane achieves its height through a system of climbing that allows it to add additional sections as the building height increases. What is the role of the operator in a tower crane operation? The operator is ...
    (0)
  • $9.99
  • + learn more
NCCCO Mobile Crane Exam (2023/ 2024) Questions and 100% Correct Verified Answers| Grade A
  • NCCCO Mobile Crane Exam (2023/ 2024) Questions and 100% Correct Verified Answers| Grade A

  • Exam (elaborations) • 24 pages • 2023
  • NCCCO Mobile Crane Exam (2023/ 2024) Questions and 100% Correct Verified Answers| Grade A Q: In which quadrant are rough terrain crane capacities generally greater? a. Over the front b. Over the rear c. Over the right side d. Over the left side Answer: a. Q: According to federal requirements, under what conditions is it okay for a person to ride the headache ball? a. When there is no other way to gain access b. When the lift has been approved by an engineer c. When ...
    (4)
  • $10.49
  • 3x sold
  • + learn more
2025 Tower Crane Nccco / Nccco Tower Crane Flashcards 2024 - 2025 Exam
  • 2025 Tower Crane Nccco / Nccco Tower Crane Flashcards 2024 - 2025 Exam

  • Exam (elaborations) • 19 pages • 2024
  • 2025 Tower Crane Nccco / Nccco Tower Crane Flashcards Exam According to ASME B30.3, how many randomly broken wires must there be to remove a running wire rope from serivce - ANSWER-12 ASME 3-3.4.3(b)(1) According to ASME B30.3 when working near power lines when is a signal person required - ANSWER-When crane moves within a booms length of power lines ASME 3-3.4.3(a)(3) According to OSHA after the crane has been checked out and before personnel lift operations begin the crew should - ANSWER-H...
    (0)
  • $17.99
  • + learn more
NCCCO TOWER CRANE FINAL EXAM  NEWEST 2024-2025 ACTUAL EXAM  COMPLETE 150 QUESTIONS AND CORRECT  DETAILED ANSWERS (VERIFIED  ANSWERS) |ALREADY GRADED A+
  • NCCCO TOWER CRANE FINAL EXAM NEWEST 2024-2025 ACTUAL EXAM COMPLETE 150 QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+

  • Exam (elaborations) • 25 pages • 2024
  • NCCCO TOWER CRANE FINAL EXAM NEWEST ACTUAL EXAM COMPLETE 150 QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+
    (0)
  • $27.49
  • + learn more
NCCCO Tower Crane Exam (2024 / 2025) Questions and 100% Correct Verified Answers | Grade A
  • NCCCO Tower Crane Exam (2024 / 2025) Questions and 100% Correct Verified Answers | Grade A

  • Exam (elaborations) • 46 pages • 2024
  • Available in package deal
  • NCCCO Tower Crane Exam (2024 / 2025) Questions and 100% Correct Verified Answers | Grade A Q: According to OSHA when lifting personnel the cranes hook must be the type that Answer: Can be closed and locked Q: According to OSHA when working over water with a man basket are the people inside required to wear a belt/harness? Answer: No harness or belt required Q: According to ASME B30.3 when working near powerlines where should caution stickers be installed? Answer: Operator station and at the base...
    (0)
  • $7.99
  • + learn more