Nccco rigging 1 2 exam - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Nccco rigging 1 2 exam? On this page you'll find 70 study documents about Nccco rigging 1 2 exam.
All 70 results
Sort by
-
NCCCO CORE FINAL EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% VERIFIED)
- Exam (elaborations) • 13 pages • 2024
- Available in package deal
-
- $14.99
- 1x sold
- + learn more
NCCCO CORE FINAL EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% VERIFIED) Operating a mobile crane with a long boom, on uneven ground, what support condition 
should be considered? - ANSWER Keeping 90 degree angle between cylinder rod and pad 
What is the primary purpose fir a rooster sheave or auxiliary boom point sheave? - ANSWER 
Separate the boom hoist lines 
How many randomly broken wires in a lay length must there be on a mobile cranes hoist line, 
before it should be removed fro...
-
NCCCO CORE BUNDLED EXAMS WITH 100% CORRECT ANSWERS
- Package deal • 24 items • 2023
-
- $33.99
- 2x sold
- + learn more
NCCCO CORE EXAM WITH 100% CORRECT ANSWERS
NCCCO RIGGING 1 & 2 EXAM WITH 100% CORRECT ANSWERS

-
NCCCO RIGGING 1 & 2 study guide exam questions and answers
- Exam (elaborations) • 6 pages • 2024
-
- $7.99
- + learn more
NCCCO RIGGING 1 & 2 study guide exam questions and answers 
OSHA 1910 - answer General Industry Standards 
 
 
OSHA 1926 - answer Construction Industry Standards
-
NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS 100% CORRECT
- Exam (elaborations) • 21 pages • 2024
-
- $14.99
- + learn more
NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS 100% CORRECT 
 
 
1. What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? 
a. Boom down 
b. Swing 
c. Boom up 
d. Extend boom Answer- c. 
 
2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratings in the load chart to remain valid? 
a. 1% 
b. 2% 
c. 5% 
d. 8% Answer- a...
-
Package deal for NCCCO TWR Practice Test Study Guide Exam with 100% Verified Answers
- Package deal • 11 items • 2024
-
- $26.49
- + learn more
NCCCO TWR Practice Test Study Guide Exam with 100% Verified Answers
NCCCO Sample Test Questions with 100% Correct Answers
NCCCO RIGGING 1 & 2 Final Exam Latest Updated Q&A
NCCCO General Knowledge Practice Exam Q&A 100% A+Graded
NCCCO TWR Practice Test Study Guide Exam with 100% Verified Answers
tower Crane Practice Test Exam (questions and answers)
Get paid weekly? You can!
-
NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS
- Exam (elaborations) • 11 pages • 2024
- Available in package deal
-
- $11.49
- + learn more
NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS 
 
 
1. What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? 
a. Boom down 
b. Swing 
c. Boom up 
d. Extend boom - ANS c. 
 
2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratings in the load chart to remain valid? 
a. 1% 
b. 2% 
c. 5% 
d. 8% - ANS a. 
 
3. The lo...
-
NCCCO RIGGING 1 & 2 Final Exam Latest Updated Q&A
- Exam (elaborations) • 4 pages • 2024
-
- $11.99
- + learn more
NCCCO RIGGING 1 & 2 Final Exam 
Latest Updated Q&A 
OSHA 1910 - CORRECT ANSWER-General Industry Standards 
OSHA 1926 - CORRECT ANSWER-Construction Industry Standards 
OSHA 1910.180 - CORRECT ANSWER-Crawler, Locomotive and Truck Cranes 
OSHA 1910.184 - CORRECT ANSWER-Slings 
OSHA 1926.251 - CORRECT ANSWER-Rigging Equipment used for material handling 
OSHA 1926.1400 - CORRECT ANSWER-Cranes and Derricks used in construction 
ASME B30.3 - CORRECT ANSWER-Tower Cranes 
ASME B30.5 - CORRECT ANSWER-Mobi...
-
NCCCO TWR Practice Test Study Guide Exam with 100% Verified Answers
- Exam (elaborations) • 11 pages • 2024
-
- $13.49
- + learn more
NCCCO TWR Practice Test Study Guide 
Exam with 100% Verified Answers 
1. Which of the following OSHA regulations govern suspended personnel platforms? - 
CORRECT ANSWER-OSHA 1926.550(g) 
2. According to ASME B30.3, the prohibited zone for power lines that are 60kV is? - 
CORRECT ANSWER-15ft 
3. According to ASME B30.3, load hoist rotation resistant wire rope has a design factor 
of? - CORRECT ANSWER-5 to 1 
4. According to ASME B30.3, when lifting a suspended personnel platform the design 
fa...
-
NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% VERIFIED)
- Exam (elaborations) • 12 pages • 2024
- Available in package deal
-
- $14.99
- + learn more
NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% VERIFIED) When hoisting personnel, within what percentage of level must a telescopic boom crane be in 
order for the gross ratings in the load chart to remain valid? 
a. 1% 
b. 2% 
c. 5% 
d. 8% correct answers a. 
3. The load line of the crane you're operating contacts an energized power line. There's no sign of 
any other danger, such as fire. What should you do? 
a. Climb down carefully from the crane cab 
b. Jump do...
That summary you just bought made someone very happy. Also get paid weekly? Sell your study resources on Stuvia! Discover all about earning on Stuvia