Level 1 Module 10 Basic Electrical Construction Drawings Exam 2023 with complete solution
- Exam (elaborations) • 3 pages • 2023
-
Available in package deal
-
- $11.49
- 1x sold
- + learn more
Level 1 Module 10 Basic Electrical Construction Drawings Exam 2023 with complete solution 
 
A cutaway view of a building or object is known as a(n)______. 
Sectional drawing 
What is the total connected load of Circuit A-1 if each of the Type C lighting fixtures in the figure above has a total lamp and ballast load of 150VA? 
1,200VA 
In which division of the MasterFormat is electronic safety covered? 
Division 28 
A section line on a drawing shows 
The location of the section on the plan 
On e...
-
COSC 253 EXAM 2 (Simms) || All Correct.
- Exam (elaborations) • 8 pages • 2024
-
Available in package deal
-
- $11.09
- + learn more
MasterFormat Division 6 correct answers Wood, Plastics, and Composites 
 
Tree Structure correct answers Bark: Outermost protective layer (A: dead, B: living) 
Cambium layer (C): Source of new cells 
Sapwood (D): Living cells that store and transport nutrients 
Heartwood (E): Dead cells that contribute to structural strength 
Pith (F): Innermost, first year's growth 
Annual growth rings (G): Result from differences in rate of tree growth and density of cells, from spring to summer 
 
Softwoods ...
-
CDT exam Questions with Correct Answers (solved)
- Exam (elaborations) • 16 pages • 2024
-
Available in package deal
-
- $15.49
- + learn more
CDT exam Questions with Correct 
Answers (solved) 
1. The method of computation of Contractor's overhead and profits for Change Order 
prices, where both additions and deletions are involved, is found in the: 
a) Agreement. 
b) Conditions of the Contract. 
c) Division 01. 
d) Instructions to Bidders. - CORRECT ANSWER-b) Conditions of the Contract. 
2. General Requirements are part of: 
a) Supplementary Conditions. 
b) Bidding Requirements. 
c) Specifications. 
d) Summary of Work. - CORRECT AN...
-
COSC 253 – Concrete || All Answers Are Correct 100%.
- Exam (elaborations) • 13 pages • 2024
-
Available in package deal
-
- $11.49
- + learn more
MasterFormat correct answers The organizational standard for specifications (the Written instructions for construction) 
 
Which Division is Concrete? correct answers 03 
 
CSI correct answers The Construction Specifications Institute 
 
Why is concrete beneficial? correct answers 1. Does not burn (if a concrete place caught on fire, it gives enough time for people to evacuate) 
2. Can be used for many purposes 
3. Exterior finish = interior finish 
4. Great Compression Strength 
5. 50+ Building...
-
CDT Exam Questions With Correct Answers 100% Solved
- Exam (elaborations) • 21 pages • 2024
- Available in package deal
-
- $13.49
- + learn more
CDT Exam Questions With Correct Answers 
100% Solved 
1. The method of computation of Contractor's overhead and profits for Change Order prices, 
where both additions and deletions are involved, is found in the: 
a) Agreement. 
b) Conditions of the Contract. 
c) Division 01. 
d) Instructions to Bidders. - answerb) Conditions of the Contract. 
2. General Requirements are part of: 
a) Supplementary Conditions. 
b) Bidding Requirements. 
c) Specifications. 
d) Summary of Work. - answerc) Specifica...
Want to regain your expenses?
-
CDT Exam Questions and Answers Already Passed
- Exam (elaborations) • 38 pages • 2023
- Available in package deal
-
- $10.99
- + learn more
CDT Exam Questions and Answers Already Passed 
1. The method of computation of Contractor's overhead and profits for Change Order prices, where both additions and deletions are involved, is found in the: 
a) Agreement. 
b) Conditions of the Contract. 
c) Division 01. d) Instructions to Bidders. b) Conditions of the Contract. 
2. General Requirements are part of: 
a) Supplementary Conditions. 
b) Bidding Requirements. 
c) Specifications. d) Summary of Work. c) Specifications. 
3. The three essen...
-
CDT Exam Questions With Correct Answers 100% Solved
- Exam (elaborations) • 21 pages • 2024
- Available in package deal
-
- $13.49
- + learn more
CDT Exam Questions With Correct Answers 
100% Solved 
1. The method of computation of Contractor's overhead and profits for Change Order prices, 
where both additions and deletions are involved, is found in the: 
a) Agreement. 
b) Conditions of the Contract. 
c) Division 01. 
d) Instructions to Bidders. - answerb) Conditions of the Contract. 
2. General Requirements are part of: 
a) Supplementary Conditions. 
b) Bidding Requirements. 
c) Specifications. 
d) Summary of Work. - answerc) Specifica...
-
CDT Exam Questions With Correct Answers 100% Solved
- Exam (elaborations) • 21 pages • 2024
- Available in package deal
-
- $13.49
- + learn more
CDT Exam Questions With Correct Answers 
100% Solved 
1. The method of computation of Contractor's overhead and profits for Change Order prices, 
where both additions and deletions are involved, is found in the: 
a) Agreement. 
b) Conditions of the Contract. 
c) Division 01. 
d) Instructions to Bidders. - answerb) Conditions of the Contract. 
2. General Requirements are part of: 
a) Supplementary Conditions. 
b) Bidding Requirements. 
c) Specifications. 
d) Summary of Work. - answerc) Specifica...
-
CNST test #1 multiple choice Questions And Answers Rated A+
- Exam (elaborations) • 8 pages • 2024
- Available in package deal
-
- $7.99
- + learn more
__________ keep track of and manages the completion of all loose ends, items that need to get done, 
minor repairs, and adjustments at the END of the job. 
A. Project delivery method 
B. Punch list 
C. RFP 
D. Bid Form - B. Punch list 
All of the following are functions of Construction Management except: 
A. Planning the project 
B. Estimating the project 
C. Scheduling the project 
D. Financing the project - D. Financing the project 
Identify the correct pairing of the most common procurement m...
-
CDT exam Questions with Correct Answers (solved)
- Exam (elaborations) • 16 pages • 2024
- Available in package deal
-
- $14.99
- + learn more
CDT exam Questions with Correct 
Answers (solved) 
1. The method of computation of Contractor's overhead and profits for Change Order 
prices, where both additions and deletions are involved, is found in the: 
a) Agreement. 
b) Conditions of the Contract. 
c) Division 01. 
d) Instructions to Bidders. - CORRECT ANSWER-b) Conditions of the Contract. 
2. General Requirements are part of: 
a) Supplementary Conditions. 
b) Bidding Requirements. 
c) Specifications. 
d) Summary of Work. - CORRECT AN...