If a contractor f - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about If a contractor f? On this page you'll find 1149 study documents about If a contractor f.

All 1.149 results

Sort by

S-12 S-13 Standpipe and Sprinkler Practice Questions with Certified Solutions Popular
  • S-12 S-13 Standpipe and Sprinkler Practice Questions with Certified Solutions

  • Exam (elaborations) • 13 pages • 2024
  • Available in package deal
  • S-12 S-13 Standpipe and Sprinkler Practice Questions with Certified Solutions "Fail Safe" when referred to in locks, means that the door can be opened if the power fails Where does the on-duty Building Evacuation Supervisor report when an alarm is activated? To the Fire Command Station ( To act as Fire Safety Director when the FSD or a Deputy FSD is not required to be on duty). "RCNY" is the abbreviation for Rules of the City of New York A fire alarm box is painted plain red (no stripe). When...
    (0)
  • $9.99
  • 1x sold
  • + learn more
CONCRETE BATCH PLANT OPERATOR  EXAM (FDOT) | QUESTIONS &  ANSWERS (VERIFIED) | LATEST  UPDATE | GRADED A+ Popular
  • CONCRETE BATCH PLANT OPERATOR EXAM (FDOT) | QUESTIONS & ANSWERS (VERIFIED) | LATEST UPDATE | GRADED A+

  • Exam (elaborations) • 8 pages • 2024 Popular
  • 1 CONCRETE BATCH PLANT OPERATOR EXAM (FDOT) | QUESTIONS & ANSWERS (VERIFIED) | LATEST UPDATE | GRADED A+ Stockpiles of aggregate shall be maintained in a well-drained condition in order to: Correct Answer: Minimize Free Water Content Coarse aggregate stockpiles must be sprinkled for at lest how many hours prior to batch for FDOT? Correct Answer: 24 Free moisture of the aggregate means: Correct Answer: Moister on the surface of an aggregate that is above and beyond the absorbed m...
    (0)
  • $11.49
  • 1x sold
  • + learn more
Michigan Builders License Exam Questions With Correct Answers
  • Michigan Builders License Exam Questions With Correct Answers

  • Exam (elaborations) • 71 pages • 2023
  • Available in package deal
  • Created to serve as a complete, comprehensive code regulating the construction of single-family, two-family and buildings consisting of three or more townhouse units. - Answer IRC (International Residential Code) Administrative - Answer First 2 chapters of code book are True - Answer Plans or supporting documents are almost always required by the controlling authority prior to issuing a permit. T or F Yes - Answer Does the building official have the authority to render interpretations o...
    (3)
  • $13.49
  • 7x sold
  • + learn more
CLC 059 Test Questions & Answers(RATED A)
  • CLC 059 Test Questions & Answers(RATED A)

  • Exam (elaborations) • 10 pages • 2023
  • Who decides which post-award contract administrative functions will be delegated and which will be retained by the contracting officer who awarded the contract? - ANSWERProcuring contracting officer (PCO) "Bloom. LLC was recently awarded a $2 million contract for website enhancement services that was set aside for Historically Underutilized Business Zone (HUBZone) small businesses. Bloom's owner recently asked you which of the following would be acceptable subcontracts for Bloom to enter i...
    (2)
  • $11.99
  • 14x sold
  • + learn more
 Contracting Officer Unlimited Warrant Board verified answers and questions 2023.
  • Contracting Officer Unlimited Warrant Board verified answers and questions 2023.

  • Exam (elaborations) • 52 pages • 2023
  • Available in package deal
  • Contracting Officer Unlimited Warrant Board verified answers and questions 2023. What is an option? - correct answers.An option is a unilateral right in a contract, for a specific period of time, where the Government may elect to purchase additional supplies or services called for by the contract, or extend the period of performance. The PCO should use options when (1) in the Governments best interest, (2) there is a need for service beyond the initial period, and (3) to ensu...
    (0)
  • $11.99
  • 3x sold
  • + learn more
Michigan Residential Builder's License Test With Correct Solution
  • Michigan Residential Builder's License Test With Correct Solution

  • Exam (elaborations) • 114 pages • 2023
  • Available in package deal
  • What is the 1st offense penalty for engaging in the practice of residential building without a license? - Answer Not less than $5K and not more than $25K and/or 1 year What is the penalty for engaging in the practice of residential building, resulting in a death? - Answer Not less than $5K and not more than $50K and/or 4 years On your individual builder's license application, what should you write as your "business address"? - Answer Your personal address What is the cost of the indi...
    (1)
  • $11.49
  • 2x sold
  • + learn more
HRB-27 Final Exam Review Questions And Answers WITH VERIFIED SOLUTIONS GRADED A+ LATEST UPDATE 2023|2024
  • HRB-27 Final Exam Review Questions And Answers WITH VERIFIED SOLUTIONS GRADED A+ LATEST UPDATE 2023|2024

  • Exam (elaborations) • 23 pages • 2023
  • HRB-27 Final Exam Review Questions And Answers WITH VERIFIED SOLUTIONS GRADED A+ What income reporting form should an independent contractor sometimes receive from the person who paid him for his services? - Answer Form 1099-MISC (15.6) Schedule C, Line F asks for the accounting method used in the business. What is the difference between the cash method and the accrual method of accounting? - Answer • Under the accrual method, total sales and total charges for services are included in ...
    (0)
  • $10.49
  • 1x sold
  • + learn more
TCFP Inspector's Class II Test Questions and  Answers, updated for Latest edition
  • TCFP Inspector's Class II Test Questions and Answers, updated for Latest edition

  • Exam (elaborations) • 30 pages • 2024
  • Available in package deal
  • Which of the following are a type of sprinkler? A) ESFR B) EC C) AF D) A and B - A and B Foam water system design and installation requirements are regulated by ___________. A. NFPA 13 B. NFPA 13R C. NFPA 25 D. NFPA 16 - NFPA 16 True or False, NFPA 72 allows only manual pull stations and water flow detection devices to be used on shunt systems. Fire detection devices are not permitted. - True The fire alarm control panel (FACP) is essentially the _____ of the system. - Brain Heat ...
    (0)
  • $10.49
  • 1x sold
  • + learn more
Procore Final Exam Questions and Answers Already Passed
  • Procore Final Exam Questions and Answers Already Passed

  • Exam (elaborations) • 6 pages • 2023
  • Available in package deal
  • Procore Final Exam Questions and Answers Already Passed True or False: When you link an RFI to a drawing, you will see the drawing linked on the RFI's view page. T True or False: Punch List templates are only available for use on Procore's mobile application. T True or False: Observations can only be created using an observation template. F If you are tracking a folder (not a file), when will you receive an email notification from Procore? a. When a new file is added to the tracked folder ...
    (0)
  • $8.99
  • 3x sold
  • + learn more
CFM 445 Midterm Questions and Answers 100% Pass
  • CFM 445 Midterm Questions and Answers 100% Pass

  • Exam (elaborations) • 16 pages • 2023
  • CFM 445 Midterm Questions and Answers 100% Pass Most companies fail when they have to face ____ or more risks at the same time 2 _____ is the most common element among contractors who fail significant increase in the size of projects undertaken Events leading to contractor failure usually take place in _______ during profitable years prior to failure T/F Past success is a good indication of future success False T/F A board of directors should be made up of internal and external members True ...
    (0)
  • $9.99
  • 1x sold
  • + learn more
Asphalt Paving Level 1 Questions And Answers Rated A+ New Update Assured Satisfaction
  • Asphalt Paving Level 1 Questions And Answers Rated A+ New Update Assured Satisfaction

  • Exam (elaborations) • 7 pages • 2024
  • Available in package deal
  • A full lot of super pave asphalt is what size? 1,000 tons 1,000 to 2000 tons 2000 to 4000 tons 1 days production - Answer 2000 to 4000 tons Which is not typically used as an asphalt binder in fdot mix designs? PG 52-28 PG 58-22 PG 62-22 PG 76-22(PMA) PG 82-22 (PMA) - Answer PG 62-22 Who cuts the density cores used for verification testing? The verification technician The contractor The independent verification testing technician None of the above - Answer The contractor A full lo...
    (0)
  • $7.29
  • 1x sold
  • + learn more
Asbestos Test 1 Exam Questions  With Expert Verified Solutions|  Already Passed | Updated
  • Asbestos Test 1 Exam Questions With Expert Verified Solutions| Already Passed | Updated

  • Exam (elaborations) • 12 pages • 2023
  • Available in package deal
  • Asbestos Test 1 Exam Questions With Expert Verified Solutions| Already Passed | Updated ASB exposure is effected by exposure, accessibility, ________, and _________ - ANSWER water exposure and vibration What is the expression measurement for fibers per cubic centimeter? - ANSWER f/cc Modifications of withdrawls to bids are effective - ANSWER when filed before the opening of bids and in writing Friable asbestos material releases fibers when - ANSWER sanded, crushed, drilled or cut...
    (0)
  • $11.99
  • 1x sold
  • + learn more