Engineer license Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Engineer license? On this page you'll find 752 study documents about Engineer license.

All 752 results

Sort by

NYC Home Improvement Exam Questions and Answers Latest 2023-2024 (Graded 100%) Popular
  • NYC Home Improvement Exam Questions and Answers Latest 2023-2024 (Graded 100%)

  • Exam (elaborations) • 7 pages • 2023
  • NYC Home Improvement Exam Questions and Answers Latest (Graded 100%). DOB - ANSWER Department of Buildings DCA - ANSWER Department of Consumer Affairs DOT - ANSWER Department of Transportation What is home improvement? - ANSWER The construction,repair, replacement, remodleing, alteration, comversion, rehabilitation, renovation, modernization, improvement, or addition to any land or building or any part of the land or building used or designed to be used as a residence or dwelling place, i...
    (0)
  • $14.99
  • 2x sold
  • + learn more
Minnesota Special Engineer Boiler License Practice Exam Questions Popular
  • Minnesota Special Engineer Boiler License Practice Exam Questions

  • Exam (elaborations) • 5 pages • 2023 Popular
  • Minnesota Special Engineer Boiler License Practice Exam Questions
    (0)
  • $11.49
  • 1x sold
  • + learn more
Stationary Engineer NYC high pressure  boiler license Exam Q&A A+ Graded
  • Stationary Engineer NYC high pressure boiler license Exam Q&A A+ Graded

  • Exam (elaborations) • 41 pages • 2024
  • Stationary Engineer NYC high pressure boiler license Exam Q&A A+ Graded How much clearance from the top of the boiler is needed for a HP boiler that produces 70000 lbs of steam? - CORRECT ANSWER-7 feet On a gas fired boiler what is the proper gas to air mixture - CORRECT ANSWER-30%- 70% and in special arrangements it can be as high as 100% . ANSWER CHAPTER 11 remember% What is the total hardness in a system that was found to have calcium hardness of 60ppm and magnesium hardness of 18...
    (0)
  • $16.99
  • 1x sold
  • + learn more
3rd class stationary steam engineer license prep questions with complete solutions
  • 3rd class stationary steam engineer license prep questions with complete solutions

  • Exam (elaborations) • 33 pages • 2024
  • _________ are necessary for complete combustion correct answer: time, temperature, mixture, and atomization if the steam pressure gauge indicates 200 PSIG, the absolute pressure is______ correct answer: 214.7 a boiler is operating at 400 PSI, and the safety valve opens at 410 PSI and closes at 398 PSI. The blowdown is______psi correct answer: 12 an oil cooler is commonly used with a(n) ________ when operating in conjunction with a turbo-generator correct answer: steam turbine a boiler is produci...
    (1)
  • $8.49
  • 1x sold
  • + learn more
3rd class stationary steam engineer license prep questions with complete solutions
  • 3rd class stationary steam engineer license prep questions with complete solutions

  • Exam (elaborations) • 33 pages • 2024
  • _________ are necessary for complete combustion correct answer: time, temperature, mixture, and atomization if the steam pressure gauge indicates 200 PSIG, the absolute pressure is______ correct answer: 214.7 a boiler is operating at 400 PSI, and the safety valve opens at 410 PSI and closes at 398 PSI. The blowdown is______psi correct answer: 12 an oil cooler is commonly used with a(n) ________ when operating in conjunction with a turbo-generator correct answer: steam turbine a boiler is produci...
    (1)
  • $14.99
  • 1x sold
  • + learn more
Minnesota Special Engineer Boiler License Exam Prep (2023/2024 Update) | Questions and Verified Answers| 100% Correct
  • Minnesota Special Engineer Boiler License Exam Prep (2023/2024 Update) | Questions and Verified Answers| 100% Correct

  • Exam (elaborations) • 56 pages • 2023
  • Minnesota Special Engineer Boiler License Exam Prep (2023/2024 Update) | Questions and Verified Answers| 100% Correct Q: A feed water line must have what two valves? Answer: Check & stop Q: After a new boiler is installed, what must be performed? Answer: Hydrostatic test Q: All stationary boilers of what pressure must have 2 valves on the blow off line? Answer: 100psi Q: How is boiler efficiency calculated? Answer: Output divided by input Q:...
    (0)
  • $11.49
  • 1x sold
  • + learn more
3rd class stationary steam engineer license prep questions with complete solutions
  • 3rd class stationary steam engineer license prep questions with complete solutions

  • Exam (elaborations) • 23 pages • 2023
  • _________ are necessary for complete combustion correct answer: time, temperature, mixture, and atomization if the steam pressure gauge indicates 200 PSIG, the absolute pressure is______ correct answer: 214.7 a boiler is operating at 400 PSI, and the safety valve opens at 410 PSI and closes at 398 PSI. The blowdown is______psi correct answer: 12 an oil cooler is commonly used with a(n) ________ when operating in conjunction with a turbo-generator correct answer: steam turbine a b...
    (1)
  • $12.49
  • 2x sold
  • + learn more
Stationary Engineer License Practice Grade 4 Questions with 100% Correct Answers
  • Stationary Engineer License Practice Grade 4 Questions with 100% Correct Answers

  • Exam (elaborations) • 5 pages • 2023
  • Available in package deal
  • What is a boiler Correct Answer a closed metal container (pressure vessel) which water is heated to produce steam or heated water What is steam Correct Answer the vapor that forms when water is heated to its boiling point When did the greatest impact of the use of steam power occur Correct Answer during the industrial revolution 18th and early 19th century Who invented the steam engine and when Correct Answer James Watt of Scotland in 1736 How is steam produced Correct Answer water i...
    (1)
  • $12.99
  • 2x sold
  • + learn more
MINNESOTA SPECIAL ENGINEER BOILER LICENSE PRACTICE EXAM WITH 100% CORRECT ANSWERS
  • MINNESOTA SPECIAL ENGINEER BOILER LICENSE PRACTICE EXAM WITH 100% CORRECT ANSWERS

  • Exam (elaborations) • 10 pages • 2023
  • MINNESOTA SPECIAL ENGINEER BOILER LICENSE PRACTICE EXAM WITH 100% CORRECT ANSWERSMINNESOTA SPECIAL ENGINEER BOILER LICENSE PRACTICE EXAM WITH 100% CORRECT ANSWERSMINNESOTA SPECIAL ENGINEER BOILER LICENSE PRACTICE EXAM WITH 100% CORRECT ANSWERSMINNESOTA SPECIAL ENGINEER BOILER LICENSE PRACTICE EXAM WITH 100% CORRECT ANSWERSMINNESOTA SPECIAL ENGINEER BOILER LICENSE PRACTICE EXAM WITH 100% CORRECT ANSWERSVMINNESOTA SPECIAL ENGINEER BOILER LICENSE PRACTICE EXAM WITH 100% CORRECT ANSWERSMINNESOTA SPE...
    (0)
  • $15.49
  • 1x sold
  • + learn more
MINNESOTA SPECIAL ENGINEER BOILER LICENSE PRACTICE EXAM QUESTIONS WITH 100% CORRECT ANSWERS
  • MINNESOTA SPECIAL ENGINEER BOILER LICENSE PRACTICE EXAM QUESTIONS WITH 100% CORRECT ANSWERS

  • Exam (elaborations) • 5 pages • 2022
  • Available in package deal
  • For the purpose of rating boiler horsepower for an Engineers License only, how many square feet of boiler surface shall be equivalent to one boiler horsepower on a boiler? CORRECT ANSWER 10 Sq. Ft. Heating Surface What is meant by the term "Low Pressure Boiler"? CORRECT ANSWER Boilers operating at a steam or other vapor pressure of 15psig or less, or a hot water or other liquid boiler in which the pressure does not exceed 160 psig or a temperature of 250 degrees F. A person holding a cur...
    (1)
  • $14.89
  • 4x sold
  • + learn more