Estimating: 
The process of determining the anticipated cost of materials, labor, and equipment of a proposed project. 
 
 
 
Take-off: 
The process in which detailed lists are compiled, based on drawings and specifications, of all the material and equipment necessary to construct a project. The cost estimator uses this list to calculate how much it will cost to build the project. 
 
 
 
Quantities: 
Measured amounts of construction...
-
COSC 275 Exam 2 Palmer; Questions and Answers % Correct
- Exam (elaborations) • 14 pages • 2024
- Available in package deal
-
- $11.99
- + learn more
COSC 275 Exam 2 Palmer; Questions and 
Answers % Correct 
Hard bid low price Correct answer-Owner hires architect 
Architect designs 
Contractors bid 
Awarded to low bidder 
Competitive sealed proposals Correct answer-Involves criteria other than price when 
awarding contract 
Weight given to each criteria that will be considered 
Criteria: (changes) 
- Cost 
- Previous experience 
- Qualification of staff 
- Financial stability 
- Project schedule
-
COSC 275 Exam 2 Palmer; Questions and Answers % Correct
- Exam (elaborations) • 8 pages • 2024
- Available in package deal
-
- $11.99
- + learn more
COSC 275 Exam 2 Palmer; Questions and 
Answers % Correct 
Measures Correct answer-1" = 25.40 milimeters 
1 sq. M(m^2) = 10.764 sq. ft or = 1.196 sq. yd. 
1 kg = 2.2046 lbs 
Geometric Formula: 
Circle Correct answer-Circumference =2r*pi 
Area = pi*r^2 
Geometric Formula: 
Triangle Correct answer-Area: B*1/2H
-
COSC 275 Exam 2 Palmer Questions And Answers 100% Verified.
- Exam (elaborations) • 7 pages • 2024
- Available in package deal
-
- $11.49
- + learn more
COSC 275 Exam 2 Palmer Questions And 
Answers 100% Verified. 
Hard bid low price - answerOwner hires architect 
Architect designs 
Contractors bid 
Awarded to low bidder 
Competitive sealed proposals - answerInvolves criteria other than price when awarding 
contract 
Weight given to each criteria that will be considered 
Criteria: (changes) 
- Cost 
- Previous experience 
- Qualification of staff 
- Financial stability 
- Project schedule 
Construction Manager at Risk CMAR - answerConstruction m...
-
COSC 275 Exam 2 Palmer With Complete Solution
- Exam (elaborations) • 8 pages • 2024
- Available in package deal
-
- $13.99
- + learn more
COSC 275 Exam 2 Palmer With Complete Solution...
And that's how you make extra money
-
COSC 275 EXAM 2 PALMER QUESTIONS & ANSWERS SCORED A+ TO PASS!!
- Exam (elaborations) • 6 pages • 2024
- Available in package deal
-
- $7.99
- + learn more
Girder - Answer-A large principal beam of steel, reinforced concrete, wood, or a combination of these, 
used to support other structural members at isolated points along its length 
Anchor Bolt - Answer-A threaded bolt, usually embeded in a foundation, for sealing a sill, framework, or 
machinery 
Beam - Answer-A structural member that primarily resists loads applied laterally to the axis 
Column - Answer-A long, relatively slender, supporting pillar. A column is usually loaded axially in 
compr...
-
COSC 275 Exam 2 Palmer Questions and Correct Answers
- Exam (elaborations) • 21 pages • 2024
- Available in package deal
-
- $10.49
- + learn more
Hard bid low price 
Answer- Owner hires architect 
Architect designs 
Contractors bid 
Awarded to low bidder 
Competitive sealed proposals 
Answer- Involves criteria other than price when awarding contract 
Weight given to each criteria that will be considered 
Criteria: (changes) 
- Cost 
- Previous experience 
- Qualification of staff 
- Financial stability 
- Project schedule 
Construction Manager at Risk CMAR 
Answer- Construction manager hired in design phase to assist designer in 
const...
-
COSC 275 Exam 2 Palmer | Questions and Answers | Latest Update | 2024/2025 | Graded A+
- Exam (elaborations) • 15 pages • 2024
-
Available in package deal
-
- $10.25
- + learn more
COSC 275 Exam 2 Palmer | Questions 
and Answers | Latest Update | 2024/2025 
 
| Graded A+ 
 
1 kg= ___ lbs 2.2046 
 
1 sq M= ___ sq ft 10.764 
 
1"= ___ millimeters 25.40 
 
4 types of envelope construction Tilt Wall 
Stud with veneer 
 
Masonry 
Glass 
 
A 10' W18x48 Beam weighs how much? (in tons) 10x48 = 480 lbs 
480/2000 = .24 tons 
 
Air Barrier A component of the envelop system that prohibits air leakage into a building and 
reduces the risk of condensation build up. House wrap and flui...
-
COSC 275 Exam 2 Palmer Questions And Answers 100% Verified.
- Exam (elaborations) • 4 pages • 2024
- Available in package deal
-
- $10.49
- + learn more
COSC 275 Exam 2 Palmer Questions And 
Answers 100% Verified. 
Measures - answer1" = 25.40 milimeters 
1 sq. M(m^2) = 10.764 sq. ft or = 1.196 sq. yd. 
1 kg = 2.2046 lbs 
Geometric Formula: 
Circle - answerCircumference =2r*pi 
Area = pi*r^2 
Geometric Formula: 
Triangle - answerArea: B*1/2H 
Masterformat 2004: 
00 - answerProcurement and Contracting Requirements 
Masterformat 2004: 
01 - answerGeneral Requirements 
Masterformat 2004: 
02 - answerExisting Conditions 
Masterformat 2004: 
03 - ans...
-
COSC 275 Exam 2 Palmer quizzes and answers 2024
- Exam (elaborations) • 11 pages • 2024
-
Available in package deal
-
- $13.49
- + learn more
Hard bid low price - Owner hires architect 
Architect designs 
Contractors bid 
Awarded to low bidder 
 
Competitive sealed proposals - Involves criteria other than price when awarding contract 
Weight given to each criteria that will be considered 
Criteria: (changes) 
- Cost 
- Previous experience 
- Qualification of staff 
- Financial stability 
- Project schedule 
 
Construction Manager at Risk CMAR - Construction manager hired in design phase to assist designer in constructability. 