Cosc 275 exam 2 - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Cosc 275 exam 2? On this page you'll find 63 study documents about Cosc 275 exam 2.

All 63 results

Sort by

COSC 275 Exam 1 Palmer Questions and Answers fully solved 2023 Popular
  • COSC 275 Exam 1 Palmer Questions and Answers fully solved 2023

  • Exam (elaborations) • 10 pages • 2023
  • COSC 275 Exam 1 Palmer Questions and Answers fully solved 2023 Estimating: The process of determining the anticipated cost of materials, labor, and equipment of a proposed project. Take-off: The process in which detailed lists are compiled, based on drawings and specifications, of all the material and equipment necessary to construct a project. The cost estimator uses this list to calculate how much it will cost to build the project. Quantities: Measured amounts of construction...
    (0)
  • $30.49
  • 3x sold
  • + learn more
COSC 275 EXAM 2 LATEST UPDATE
  • COSC 275 EXAM 2 LATEST UPDATE

  • Exam (elaborations) • 14 pages • 2024
  • Available in package deal
  • COSC 275 EXAM 2 LATEST UPDATE...
    (0)
  • $9.49
  • + learn more
COSC 275 Exam 2 Palmer; Questions and  Answers % Correct
  • COSC 275 Exam 2 Palmer; Questions and Answers % Correct

  • Exam (elaborations) • 14 pages • 2024
  • Available in package deal
  • COSC 275 Exam 2 Palmer; Questions and Answers % Correct Hard bid low price Correct answer-Owner hires architect Architect designs Contractors bid Awarded to low bidder Competitive sealed proposals Correct answer-Involves criteria other than price when awarding contract Weight given to each criteria that will be considered Criteria: (changes) - Cost - Previous experience - Qualification of staff - Financial stability - Project schedule
    (0)
  • $11.99
  • + learn more
COSC 275 Exam 2 (Palmer) Questions with Correct Answers
  • COSC 275 Exam 2 (Palmer) Questions with Correct Answers

  • Exam (elaborations) • 11 pages • 2024
  • Hard bid low price Correct Answer-Owner hires architect Architect designs Contractors bid Awarded to low bidder Competitive sealed proposals Correct Answer-Involves criteria other than price when awarding contract Weight given to each criteria that will be considered Construction Manager at Risk CMAR Correct Answer-Construction manager hired in design phase to assist designer in constructibility. Also gives the owner a good handle on the cost. Design Build Correct Answer-Only one co...
    (0)
  • $12.99
  • + learn more
COSC 275 Exam 2 Palmer Study Guide
  • COSC 275 Exam 2 Palmer Study Guide

  • Exam (elaborations) • 7 pages • 2024
  • COSC 275 Exam 2 Palmer Study Guide
    (0)
  • $13.49
  • + learn more
COSC 275 Exam 2 Palmer; Questions and  Answers % Correct
  • COSC 275 Exam 2 Palmer; Questions and Answers % Correct

  • Exam (elaborations) • 8 pages • 2024
  • Available in package deal
  • COSC 275 Exam 2 Palmer; Questions and Answers % Correct Measures Correct answer-1" = 25.40 milimeters 1 sq. M(m^2) = 10.764 sq. ft or = 1.196 sq. yd. 1 kg = 2.2046 lbs Geometric Formula: Circle Correct answer-Circumference =2r*pi Area = pi*r^2 Geometric Formula: Triangle Correct answer-Area: B*1/2H
    (0)
  • $11.99
  • + learn more
COSC 275 EXAM 2 WITH QUESTIONS AND ANSWERS
  • COSC 275 EXAM 2 WITH QUESTIONS AND ANSWERS

  • Exam (elaborations) • 5 pages • 2024
  • Available in package deal
  • COSC 275 EXAM 2 WITH QUESTIONS AND ANSWERS...
    (0)
  • $8.99
  • + learn more
COSC 275 Exam 2 (Palmer) | Latest Update | 2024/2025 | Graded A+
  • COSC 275 Exam 2 (Palmer) | Latest Update | 2024/2025 | Graded A+

  • Exam (elaborations) • 13 pages • 2024
  • COSC 275 Exam 2 (Palmer) | Latest Update | 2024/2025 | Graded A+ Air Barrier A component of the envelop system that prohibits air leakage into a building and reduces the risk of condensation build up. House wrap and fluid applied barriers are examples. Air/Vapor Barrier is always installed on (Inside/outside) of wall. Inside Anchor Bolt A threaded bolt, usually embeded in a foundation, for sealing a sill, framework, or machinery Beam A structural member that primarily resists load...
    (0)
  • $9.98
  • + learn more
COSC 275 Exam 2 Palmer Questions And Answers 100% Verified.
  • COSC 275 Exam 2 Palmer Questions And Answers 100% Verified.

  • Exam (elaborations) • 7 pages • 2024
  • Available in package deal
  • COSC 275 Exam 2 Palmer Questions And Answers 100% Verified. Hard bid low price - answerOwner hires architect Architect designs Contractors bid Awarded to low bidder Competitive sealed proposals - answerInvolves criteria other than price when awarding contract Weight given to each criteria that will be considered Criteria: (changes) - Cost - Previous experience - Qualification of staff - Financial stability - Project schedule Construction Manager at Risk CMAR - answerConstruction m...
    (0)
  • $11.49
  • + learn more
COSC 275 Exam 2 Palmer With Complete Solution
  • COSC 275 Exam 2 Palmer With Complete Solution

  • Exam (elaborations) • 8 pages • 2024
  • Available in package deal
  • COSC 275 Exam 2 Palmer With Complete Solution...
    (0)
  • $13.99
  • + learn more
COSC 275 Exam 2 (Palmer) Questions And Answers 100% Verified.
  • COSC 275 Exam 2 (Palmer) Questions And Answers 100% Verified.

  • Exam (elaborations) • 6 pages • 2024
  • Available in package deal
  • COSC 275 Exam 2 (Palmer) Questions And Answers 100% Verified. Hard bid low price - answerOwner hires architect Architect designs Contractors bid Awarded to low bidder Competitive sealed proposals - answerInvolves criteria other than price when awarding contract Weight given to each criteria that will be considered Construction Manager at Risk CMAR - answerConstruction manager hired in design phase to assist designer in constructibility. Also gives the owner a good handle on the cost. ...
    (0)
  • $10.49
  • + learn more