CM 4101 Exam 1 Questions And Answers 2024
  • CM 4101 Exam 1 Questions And Answers 2024

  • Exam (elaborations) • 15 pages • 2024
  • CM 4101 Exam 1 Questions And Answers 2024 (ESi) (EFi) (LFi) (LSi) (Ti) (TFi) (FFi) - ANS-Early Activity Start Early Activity Finish Late Activity Finish Late Activity Start Duration Total Float Free Float Why Plan, Schedule and Control? (6) - ANS--Complexity of construction projects -To control resource consumption -To communicate the construction plan -To establish production goals -To monitor and measure project progress -To manage changes What is a primary means that gen...
    (0)
  • $13.99
  • + learn more
CM 4101 Final Exam | With 100% Correct Answers, Graded A
  • CM 4101 Final Exam | With 100% Correct Answers, Graded A

  • Exam (elaborations) • 7 pages • 2024
  • CM 4101 Final Exam | With 100% Correct Answers, Graded A During which of the following process, questions such as what activities should be scheduled are typically asked and answered? a. Planning b. Scheduling c. Control Using traditional bar charts, it is always easy to tell the logic relationships between activities. a. True b. False An event consumes a. Resources b. Time c. Both Resources and Time d. Neither resources nor time Which of the following is correct regarding CPM and PERT? a. The...
    (0)
  • $15.99
  • + learn more
CM 4101 Final Exam Prep Test Questions Answered 100% Correct
  • CM 4101 Final Exam Prep Test Questions Answered 100% Correct

  • Exam (elaborations) • 22 pages • 2024
  • Available in package deal
  • Bar Charts - Answer simple and time scaled presentations that show how major work activities are scheduled advantages bar charts - Answer simple and easy to use disadvantages bar charts - Answer -cannot determine project status -cannot determine needs for adjustments -activites for acceleration cannot be determined -relies on extra links to show logical relationships between activities, otherwise relationships cannot be determined networks - Answer graphic representations using nodes and...
    (0)
  • $12.99
  • + learn more
CM 4101 Exam Questions Solved 100% Correct
  • CM 4101 Exam Questions Solved 100% Correct

  • Exam (elaborations) • 15 pages • 2024
  • Available in package deal
  • What are graphic representations using nodes and links. - Answer Networks What is a discrete part of a project that can be identified for planning, scheduling, monitoring, and controlling the construction project. - Answer Activity What is the point in time or an instant at which the status of completion of a project or an activity can be defined. - Answer Even
    (0)
  • $12.74
  • + learn more
CM 4101 final Exam Questions Solved 100% Correct
  • CM 4101 final Exam Questions Solved 100% Correct

  • Exam (elaborations) • 14 pages • 2024
  • Available in package deal
  • work breakdown structure - Answer a _______ provides a framework for breaking a project down into successively greater detail by level and organizing activities that make up a project sequencing, scheduling - Answer a WBS organizes the work of a project but does not address the _____ and the _____ of project activities
    (0)
  • $12.99
  • + learn more
Study set for CM 4101 Final Exam Review Questions and Answers 2024/2025
  • Study set for CM 4101 Final Exam Review Questions and Answers 2024/2025

  • Exam (elaborations) • 8 pages • 2024
  • Study set for CM 4101 Final Exam Review Questions and Answers 2024/2025 Construction Planning - CORRECT ANSWER-The process of determining how a project will be carried out. Planning answers questions: who? what? where?, and how? Construction Scheduling - CORRECT ANSWER-Process to determine when activities need to be started and completed. Answers the question: when? Project Control - CORRECT ANSWER-Is an active process to monitor and update the construction plan and the schedule. Monitorin...
    (0)
  • $13.49
  • + learn more
CM 4101 final Exam Questions Solved 100% Correct
  • CM 4101 final Exam Questions Solved 100% Correct

  • Exam (elaborations) • 13 pages • 2024
  • Available in package deal
  • What is not true about classic bar charts? a. Bar charts use a time-scaled presentation b. Bar charts often directly show resource consumption of each activity c. Bar charts can show the relative of each activity d. Bar charts cannot show the actual status of a project - Answer b. Bar charts often directly show resource consumption of each activity c. Bar charts can show the relative of each activity
    (0)
  • $12.99
  • + learn more
CM 4101 Exam Questions Answered 100% Correct
  • CM 4101 Exam Questions Answered 100% Correct

  • Exam (elaborations) • 9 pages • 2024
  • Available in package deal
  • Work breakdown structure - Answer provides a framework for breaking a project down into successively greater detail by level and organizing activities that make up a project. wbs - Answer A ____ organizes the work of a project but does not address the sequencing and the scheduling of project activities. milestones - Answer are included in schedules to mark a particular point in time for reference or measurement
    (0)
  • $12.49
  • + learn more
CM 4101 Exam Prep Questions Answered 100% Correc
  • CM 4101 Exam Prep Questions Answered 100% Correc

  • Exam (elaborations) • 5 pages • 2024
  • Available in package deal
  • A significant difference between "planning" and "scheduling" is, - Answer Scheduling determines when to do, and planning determines what to do, how to and by whom. What is NOT true about an activity? - Answer An activity usually does not need to be measurable There is an activity, installing exterior sheathing. A crew can install 1,200 sf per day, and the total quantity is 3,200 SF. What is the duration of this activity? - Answer 3 days
    (0)