Cm 3110 - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Cm 3110? On this page you'll find 15 study documents about Cm 3110.

All 15 results

Sort by

LSU CM 3110 Construction Estimating Exam 1| actual exam questions and answers| 2024-2025 Louisiana State University Popular
  • LSU CM 3110 Construction Estimating Exam 1| actual exam questions and answers| 2024-2025 Louisiana State University

  • Exam (elaborations) • 20 pages • 2024
  • LSU CM 3110 Construction Estimating Exam 1| actual exam questions and answers| Louisiana State University
    (0)
  • $12.99
  • 2x sold
  • + learn more
LSU CM 3110 Construction Estimating exam 2 actual questions and answers 2024-2025 Louisiana State University
  • LSU CM 3110 Construction Estimating exam 2 actual questions and answers 2024-2025 Louisiana State University

  • Exam (elaborations) • 19 pages • 2024
  • LSU CM 3110 Construction Estimating exam 2 actual questions and answers Louisiana State University
    (0)
  • $12.49
  • + learn more
LSU CM 3110 Construction Estimating test 1 complete questions and answer Louisiana State University
  • LSU CM 3110 Construction Estimating test 1 complete questions and answer Louisiana State University

  • Exam (elaborations) • 7 pages • 2024
  • LSU CM 3110 Construction Estimating test 1 complete questions and answer Louisiana State University
    (0)
  • $10.49
  • + learn more
CM 3110 Final Exam Study Questions Solved 100% Correct
  • CM 3110 Final Exam Study Questions Solved 100% Correct

  • Exam (elaborations) • 24 pages • 2024
  • It is important to bid from a full set of contract documents to be certain you have all of the required information. Errors of omission can be catastrophic for a contractor. - True The _______________ of the specifications amend or supplement portions of the ________________. ementary general conditions; general conditions al conditions; supplementary general conditions ementary general conditions; technical specifications al conditions; technical specifications - Supplementary general co...
    (0)
  • $12.89
  • + learn more
CM 3110 Concrete Test with Questions Solved 100% Correct
  • CM 3110 Concrete Test with Questions Solved 100% Correct

  • Exam (elaborations) • 8 pages • 2024
  • In lime-sand mortar - lime is the binder and sand is the filler. Lime is a - cement binder Lime is made from - limestone Lime is produced by heating limestone - a process known as - calcining. The chemical reaction of lime with carbon dioxide returns lime to its parent material - limestone.
    (0)
  • $11.89
  • + learn more
CM 3110 - Chapter 1, 2, 3, & 4 Exam Study Questions Solved 100% Correct
  • CM 3110 - Chapter 1, 2, 3, & 4 Exam Study Questions Solved 100% Correct

  • Exam (elaborations) • 9 pages • 2024
  • The ____________ are the actual plans from which the project will be constructed. They contain the dimensions and locations of building elements, the materials required, and delineate how they fit together. ical specifications ng drawings led estimates act documents - Working drawings
    (0)
  • $12.10
  • + learn more
CM 3110 - Chapters 14, 15, 16, & 17 Test Study Questions with 100% Correct Verified Answers
  • CM 3110 - Chapters 14, 15, 16, & 17 Test Study Questions with 100% Correct Verified Answers

  • Exam (elaborations) • 10 pages • 2024
  • for header lengths greater than 4 feet, codes usually do not require double trimmers and headers - false - for header lengths greater than 4 feet, codes usually require double trimmers and headers at least one row of cross-bridging is required between the joists - true Sheathing/decking is most commonly _____ - plywood or waferboard (OSB) primary advantage of using 2x6s is that it allows for 5-1/2 inches of insulation as compared with 3-1/2 inches of insulation with 2x4s - true
    (0)
  • $12.19
  • + learn more
CM 3110 contracts bonds and insurance Test Study Questions with 100% Correct Verified Answers
  • CM 3110 contracts bonds and insurance Test Study Questions with 100% Correct Verified Answers

  • Exam (elaborations) • 5 pages • 2024
  • Scope of work - ANSWER The parameters defining the overall extent of work to be included in a construction contract. The project scope is commonly communicated through construction plans and written specifications. Time of completion - ANSWER Date established in the contract, by calendar date or by number of calendar or working days, for substantial completion of the work. See also Contract time. Contract Sum - ANSWER The total amount payable by the owner to the contractor, as stated in th...
    (0)
  • $11.49
  • + learn more
Cm 3110 wood Exam Study Questions Solved 100% Correct
  • Cm 3110 wood Exam Study Questions Solved 100% Correct

  • Exam (elaborations) • 4 pages • 2024
  • must be naturally durable or treated wood when on concrete or masonry Double top plates - Equals twice the length of the wall Studs - Should be separated into various sizes and lengths Estimating: -review specifications -divide length by spacing -add extra studs for -corners -wall intersections -wall openings -add studs for gable ends Lumber - Bid by the piece or board measure
    (0)
  • $9.99
  • + learn more